Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation...Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed.展开更多
Signal reconstruction is a significantly important theoretical issue for compressed sensing.Considering the situation of signal reconstruction with unknown sparsity,the conventional signal reconstruction algorithms us...Signal reconstruction is a significantly important theoretical issue for compressed sensing.Considering the situation of signal reconstruction with unknown sparsity,the conventional signal reconstruction algorithms usually perform low accuracy.In this work,a sparsity adaptive signal reconstruction algorithm using sensing dictionary is proposed to achieve a lower reconstruction error.The sparsity estimation method is combined with the construction of the support set based on sensing dictionary.Using the adaptive sparsity method,an iterative signal reconstruction algorithm is proposed.The sufficient conditions for the exact signal reconstruction of the algorithm also is proved by theory.According to a series of simulations,the results show that the proposed method has higher precision compared with other state-of-the-art signal reconstruction algorithms especially in a high compression ratio scenarios.展开更多
The electrochemical degradation of reed pulp black liquor containing lignin pretreated by acidification method was investigated using a three-dimensional electrode reactor. Using activated carbon as particle electrode...The electrochemical degradation of reed pulp black liquor containing lignin pretreated by acidification method was investigated using a three-dimensional electrode reactor. Using activated carbon as particle electrode, the effects of p H value, reaction temperature, electrolysis time and current on residual concentration of total organic carbon(TOC) were discussed in detail. The optimal conditions were obtained: pH 2.5, influent flow rate of 200 mL/min, 25 °C, 300 mA and 2h of electrolysis time, and the removal efficiency of TOC maintains at 35.57 %. The results of the electrochemical method indicate that ·OH radicals are produced in activated carbon anode in the electrolysis process and then adsorbed on the activated carbon surface. Microcell consists of ·OH radicals and the absorbed lignin. With the microcell reaction, the lignin is degraded, while the anodic polarized curve illustrates that the lignin is obviously oxidized in the anode. The contributions of direct and indirect electrolyses to the TOC removal ratio are about 50%, respectively.展开更多
In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler...In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.展开更多
基金Project(2022YJS073)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(2024YFE0198500)supported by the National Key Research and Development Program of China:Intergovernmental International Science and Technology Innovation CooperationProject(U2469207)supported by the National Natural Science Foundation Railway Innovation and Development Joint Fund Project,China。
文摘Determining earth pressure on jacked pipes is essential for ensuring lining safety and calculating jacking force,especially for deep-buried pipes.To better reflect the soil arching effect resulting from the excavation of rectangular jacked pipes and the distribution of the earth pressure on jacked pipes,we present an analytical solution for predicting the vertical earth pressure on deep-buried rectangular pipe jacking tunnels,incorporating the tunnelling-induced ground loss distribution.Our proposed analytical model consists of the upper multi-layer parabolic soil arch and the lower friction arch.The key parameters(i.e.,width and height of friction arch B and height of parabolic soil arch H 1)are determined according to the existing research,and an analytical solution for K l is derived based on the distribution characteristics of the principal stress rotation angle.With consideration for the transition effect of the mechanical characteristics of the parabolic arch zone,an analytical solution for soil load transfer is derived.The prediction results of our analytical solution are compared with tests and simulation results to validate the effectiveness of the proposed analytical solution.Finally,the effects of different parameters on the soil pressure are discussed.
基金supported by the National Natural Science Foundation of China(61773202,71874081)the Special Financial Grant from China Postdoctoral Science Foundation(2017T100366)+2 种基金the Key Laboratory of Avionics System Integrated Technology for National Defense Science and Technology,China Institute of Avionics Radio Electronics(6142505180407)the Open Fund of CAAC Key laboratory of General Aviation Operation,Civil Aviation Management Institute of China(CAMICKFJJ-2019-04)the Innovation Project of the Civil Aviation Administration of China(EAB19001)。
文摘Signal reconstruction is a significantly important theoretical issue for compressed sensing.Considering the situation of signal reconstruction with unknown sparsity,the conventional signal reconstruction algorithms usually perform low accuracy.In this work,a sparsity adaptive signal reconstruction algorithm using sensing dictionary is proposed to achieve a lower reconstruction error.The sparsity estimation method is combined with the construction of the support set based on sensing dictionary.Using the adaptive sparsity method,an iterative signal reconstruction algorithm is proposed.The sufficient conditions for the exact signal reconstruction of the algorithm also is proved by theory.According to a series of simulations,the results show that the proposed method has higher precision compared with other state-of-the-art signal reconstruction algorithms especially in a high compression ratio scenarios.
基金Project(50925417)supported by the National Natureal Science Foundation for Distinguished Young Scholar of ChinaProject(51074191)supported by the National Natural Science Foundation of China
文摘The electrochemical degradation of reed pulp black liquor containing lignin pretreated by acidification method was investigated using a three-dimensional electrode reactor. Using activated carbon as particle electrode, the effects of p H value, reaction temperature, electrolysis time and current on residual concentration of total organic carbon(TOC) were discussed in detail. The optimal conditions were obtained: pH 2.5, influent flow rate of 200 mL/min, 25 °C, 300 mA and 2h of electrolysis time, and the removal efficiency of TOC maintains at 35.57 %. The results of the electrochemical method indicate that ·OH radicals are produced in activated carbon anode in the electrolysis process and then adsorbed on the activated carbon surface. Microcell consists of ·OH radicals and the absorbed lignin. With the microcell reaction, the lignin is degraded, while the anodic polarized curve illustrates that the lignin is obviously oxidized in the anode. The contributions of direct and indirect electrolyses to the TOC removal ratio are about 50%, respectively.
基金Project(2002CB412707) supported by the National Basic Research Program of ChinaProject(2006BAG04B05) supported by the National Science and Technology Pillar Program during the 11th Five-Year Plan of ChinaProject(2010B14414) supported by the Scientific Research Program of Center University in China
文摘In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.