The difference of sintering crunodes of metal powders and fibers is discussed. The mathematical model of the surface diffusion described by the difference in mean curvature is defined as a Hamilton-Jacobi-type equatio...The difference of sintering crunodes of metal powders and fibers is discussed. The mathematical model of the surface diffusion described by the difference in mean curvature is defined as a Hamilton-Jacobi-type equation, and the model is numerically solved by the level set method. The three-dimensional numerical simulations of two metal powders and fibers(the fiber angle is 0° or 90°) are implemented by this mathematical model, respectively. The numerical simulation results accord with the experimental ones. The sintering neck growth trends of metal powders and metal fibers are similar. The sintering neck radius of metal fibers is larger than that of metal powders. The difference of the neck radius is caused by the difference of geometric structure which makes an important influence on the curvature affecting the migration rate of atoms.展开更多
Based on the analysis of the principles of frequency-phase scanning 3-D (three-dimensional) radar and the scattering mechanism of 3-D radar, the target and clutter IF (intermediate frequency) signals model of freq...Based on the analysis of the principles of frequency-phase scanning 3-D (three-dimensional) radar and the scattering mechanism of 3-D radar, the target and clutter IF (intermediate frequency) signals model of frequencyphase scanning 3-D radar is presented. The IF signals model of different channels of 3-D radar is presented in one simple formula in which complex waveform effects are considered. The simulation results obtained during tests are also provided in the end.展开更多
With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similari...With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining.展开更多
Probabilistic analysis is a rational approach for engineering design because it provides more insight than traditional deterministic analysis. Probabilistic evaluation on seismic stability of three dimensional (3D) sl...Probabilistic analysis is a rational approach for engineering design because it provides more insight than traditional deterministic analysis. Probabilistic evaluation on seismic stability of three dimensional (3D) slopes is studied in this paper. The slope safety factor is computed by combining the kinematic approach of limit analysis using a three-dimensional rotational failure mechanism with the pseudo-dynamic approach. The variability of input parameters, including six pseudo-dynamic parameters and two soil shear strength parameters, are taken into account by means of Monte-Carlo Simulations (MCS) method. The influences of pseudo-dynamic input variables on the computed failure probabilities are investigated and discussed. It is shown that the obtained failure probabilities increase with the pseudo-dynamic input variables and the pseudo-dynamic approach gives more conservative failure probability estimates compared with the pseudo-static approach.展开更多
A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-indu...A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-induced volume loss effects.The numerical model was verified based on the results of a centrifuge test and a set of parametric studies was implemented based on this model.There is good agreement between the trend of the results of the centrifuge test and the present model.The results of parametric studies show that the tunnelling-induced pile internal force and deformation depend mainly on the pile?tunnel distance,the pile length to tunnel depth ratio and the volume loss.Two different zones are separated by a 45° line projected from the tunnel springline.Within the zone of influence,the pile is subjected to tensile force and large settlement;whereas outside the zone of influence,dragload and small settlement are induced.It is also established that the impact of tunnelling on a pile group is substantially smaller as compared with a single pile in the same location with the rear pile in a group,demonstrating a positive pile group effect.展开更多
Proper room and pillar sizes are both critical factors for safe mining and high ore recovery rate in shrinkage stoping mining of underground metal mines.The rock masses of Tangdan copper mine of China are fractured,wh...Proper room and pillar sizes are both critical factors for safe mining and high ore recovery rate in shrinkage stoping mining of underground metal mines.The rock masses of Tangdan copper mine of China are fractured,which needs much reinforcement and support prior to mining.Cement-sodium silicate grout technology was selected,then its related parameters such as grout pressure,diffusion radius and time were calculated and proposed.In order to test the effect of the pressured grout in the fractured No.4 ore block,field experiments were conducted.To optimize stoping configuration,three-dimensional numerical simulation with ANSYS and FLAC 3 D softwares was proposed.The results show that the drilling porosity and mechanical properties of the rock masses are increased obviously.After grout,ore recovery rate is increased by 10.2%employing the newly designed stoping configuration compared with the previous.Last,analyzed from the surface movements,roof subsidence and the maximum principal stress of the pillars,the mining safety is probable of being ensured.展开更多
A user-defined micromechanical model was developed to investigate the fracture mechanism of asphalt concrete (AC) using the discrete element method (DEM). A three-dimensional (3D) AC beam was built using the "F...A user-defined micromechanical model was developed to investigate the fracture mechanism of asphalt concrete (AC) using the discrete element method (DEM). A three-dimensional (3D) AC beam was built using the "Fish" language provided by PFC3D and was employed to simulate the three-point bending beam test at two temperature levels: -10 ℃ and 15℃. The AC beam was modeled with the consideration of the microstructural features of asphalt mixtures. Uniaxial complex modulus test and indirect tensile strength test were conducted to obtain material input parameters for numerical modeling. The 3D predictions were validated using laboratory experimental measurements of AC beams prepared by the same mixture design. Effects of mastic stiffness, cohesive and adhesive strength on AC fracture behavior were investigated using the DEM model. The results show that the 3D DEM fracture model can accurately predict the fracture patterns of asphalt concrete. The ratio of stress at interfaces to the stress in mastics increases as the mastic stiffness decreases; however, the increase in the cohesive strength or adhesive strength shows no significant influence on the tensile strength.展开更多
Since the simulation underwater acoustic signal is used in the semi-object simulation experiment of underwater weapons, it has great impression upon simulation fidelity. It is asked that whether simulation signals can...Since the simulation underwater acoustic signal is used in the semi-object simulation experiment of underwater weapons, it has great impression upon simulation fidelity. It is asked that whether simulation signals can replace the real signal effectually. Considering the randomness of signals, the interval estimation of feature parameters of simulation signals is made. By comparing the obtained confidence interval with the corresponding accept interval, the concept of similarity coefficient of simulation signals is given. By making a statistical analysis for similarity coefficient, the uniformity information of simulation signals is extracted, and the fuzzy number which expresses the fuzzy uniformity level of simu- lation signals is obtained. The analysis method on fuzzy uniformity of simulation underwater acoustic signals is presented. It is indi- cated by the application in simulation of target radiated-noises that the method is suitable and effectual for the simulation research on underwater acoustic signals, and the analysis result may provide support for decision-making relative to perfecting simulation sys- tems and applying simulation signals.展开更多
尾矿库溃坝致灾因素多、发生频次高、破坏性强,通过尾矿坝溃坝分析(Tailings Dam Breach Analysis,TDBA)模拟预测潜在溃坝事故释放泥流运移过程与淹没范围,有助于避免或减少溃坝灾害负面影响。为提升TDBA过程规范性与结果可信度,从模拟...尾矿库溃坝致灾因素多、发生频次高、破坏性强,通过尾矿坝溃坝分析(Tailings Dam Breach Analysis,TDBA)模拟预测潜在溃坝事故释放泥流运移过程与淹没范围,有助于避免或减少溃坝灾害负面影响。为提升TDBA过程规范性与结果可信度,从模拟方法入手系统梳理国内外研究动态与发展趋势。结果表明:物理相似模拟根据相似比尺设置可分为正态与变态模型,应平衡模型复杂性与实用性,模型砂选取依据和试验观测方法有待进一步改进;不存在绝对准确的数值模拟方法,应重点研究模拟结果的工程应用价值;溃坝泥流分类体系尚不健全,应综合考虑泥流浓度、密度、级配组成等制定分类依据,据此选取适用的流变模型。TDBA方法研究与工程应用可为库区规划选址、加高扩容论证、防减灾措施布置等提供依据,助力实现“零伤亡、零危害”的尾矿库安全管理目标。展开更多
基金Projects(51174236,51134003)supported by the National Natural Science Foundation of ChinaProject(2011CB606306)supported by the National Basic Research Program of ChinaProject(PMM-SKL-4-2012)supported by the Opening Project of State Key Laboratory of Porous Metal Materials(Northwest Institute for Nonferrous Metal Research),China
文摘The difference of sintering crunodes of metal powders and fibers is discussed. The mathematical model of the surface diffusion described by the difference in mean curvature is defined as a Hamilton-Jacobi-type equation, and the model is numerically solved by the level set method. The three-dimensional numerical simulations of two metal powders and fibers(the fiber angle is 0° or 90°) are implemented by this mathematical model, respectively. The numerical simulation results accord with the experimental ones. The sintering neck growth trends of metal powders and metal fibers are similar. The sintering neck radius of metal fibers is larger than that of metal powders. The difference of the neck radius is caused by the difference of geometric structure which makes an important influence on the curvature affecting the migration rate of atoms.
文摘Based on the analysis of the principles of frequency-phase scanning 3-D (three-dimensional) radar and the scattering mechanism of 3-D radar, the target and clutter IF (intermediate frequency) signals model of frequencyphase scanning 3-D radar is presented. The IF signals model of different channels of 3-D radar is presented in one simple formula in which complex waveform effects are considered. The simulation results obtained during tests are also provided in the end.
基金Project(50490274) supported by the National Natural Science Foundation of ChinaProject(20050533035) supported by the Specialized Research Fund for the Doctoral Program of Higher Education of ChinaProject(1343-77236) supported by the Doctor Degree Paper Innovation Engineering of Central South University, China
文摘With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining.
文摘Probabilistic analysis is a rational approach for engineering design because it provides more insight than traditional deterministic analysis. Probabilistic evaluation on seismic stability of three dimensional (3D) slopes is studied in this paper. The slope safety factor is computed by combining the kinematic approach of limit analysis using a three-dimensional rotational failure mechanism with the pseudo-dynamic approach. The variability of input parameters, including six pseudo-dynamic parameters and two soil shear strength parameters, are taken into account by means of Monte-Carlo Simulations (MCS) method. The influences of pseudo-dynamic input variables on the computed failure probabilities are investigated and discussed. It is shown that the obtained failure probabilities increase with the pseudo-dynamic input variables and the pseudo-dynamic approach gives more conservative failure probability estimates compared with the pseudo-static approach.
文摘A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-induced volume loss effects.The numerical model was verified based on the results of a centrifuge test and a set of parametric studies was implemented based on this model.There is good agreement between the trend of the results of the centrifuge test and the present model.The results of parametric studies show that the tunnelling-induced pile internal force and deformation depend mainly on the pile?tunnel distance,the pile length to tunnel depth ratio and the volume loss.Two different zones are separated by a 45° line projected from the tunnel springline.Within the zone of influence,the pile is subjected to tensile force and large settlement;whereas outside the zone of influence,dragload and small settlement are induced.It is also established that the impact of tunnelling on a pile group is substantially smaller as compared with a single pile in the same location with the rear pile in a group,demonstrating a positive pile group effect.
基金Projects(51374034,51674012)supported by the National Natural Science Foundation of ChinaProject(2013BAB02B05)supported by the China National Science and Technology Support Program during the 12th Five-Year Plan Period
文摘Proper room and pillar sizes are both critical factors for safe mining and high ore recovery rate in shrinkage stoping mining of underground metal mines.The rock masses of Tangdan copper mine of China are fractured,which needs much reinforcement and support prior to mining.Cement-sodium silicate grout technology was selected,then its related parameters such as grout pressure,diffusion radius and time were calculated and proposed.In order to test the effect of the pressured grout in the fractured No.4 ore block,field experiments were conducted.To optimize stoping configuration,three-dimensional numerical simulation with ANSYS and FLAC 3 D softwares was proposed.The results show that the drilling porosity and mechanical properties of the rock masses are increased obviously.After grout,ore recovery rate is increased by 10.2%employing the newly designed stoping configuration compared with the previous.Last,analyzed from the surface movements,roof subsidence and the maximum principal stress of the pillars,the mining safety is probable of being ensured.
基金Project(51208178)supported by the National Natural Science Foundation of ChinaProject(2012M520991)supported by China Postdoctoral Science Foundation
文摘A user-defined micromechanical model was developed to investigate the fracture mechanism of asphalt concrete (AC) using the discrete element method (DEM). A three-dimensional (3D) AC beam was built using the "Fish" language provided by PFC3D and was employed to simulate the three-point bending beam test at two temperature levels: -10 ℃ and 15℃. The AC beam was modeled with the consideration of the microstructural features of asphalt mixtures. Uniaxial complex modulus test and indirect tensile strength test were conducted to obtain material input parameters for numerical modeling. The 3D predictions were validated using laboratory experimental measurements of AC beams prepared by the same mixture design. Effects of mastic stiffness, cohesive and adhesive strength on AC fracture behavior were investigated using the DEM model. The results show that the 3D DEM fracture model can accurately predict the fracture patterns of asphalt concrete. The ratio of stress at interfaces to the stress in mastics increases as the mastic stiffness decreases; however, the increase in the cohesive strength or adhesive strength shows no significant influence on the tensile strength.
文摘Since the simulation underwater acoustic signal is used in the semi-object simulation experiment of underwater weapons, it has great impression upon simulation fidelity. It is asked that whether simulation signals can replace the real signal effectually. Considering the randomness of signals, the interval estimation of feature parameters of simulation signals is made. By comparing the obtained confidence interval with the corresponding accept interval, the concept of similarity coefficient of simulation signals is given. By making a statistical analysis for similarity coefficient, the uniformity information of simulation signals is extracted, and the fuzzy number which expresses the fuzzy uniformity level of simu- lation signals is obtained. The analysis method on fuzzy uniformity of simulation underwater acoustic signals is presented. It is indi- cated by the application in simulation of target radiated-noises that the method is suitable and effectual for the simulation research on underwater acoustic signals, and the analysis result may provide support for decision-making relative to perfecting simulation sys- tems and applying simulation signals.
文摘尾矿库溃坝致灾因素多、发生频次高、破坏性强,通过尾矿坝溃坝分析(Tailings Dam Breach Analysis,TDBA)模拟预测潜在溃坝事故释放泥流运移过程与淹没范围,有助于避免或减少溃坝灾害负面影响。为提升TDBA过程规范性与结果可信度,从模拟方法入手系统梳理国内外研究动态与发展趋势。结果表明:物理相似模拟根据相似比尺设置可分为正态与变态模型,应平衡模型复杂性与实用性,模型砂选取依据和试验观测方法有待进一步改进;不存在绝对准确的数值模拟方法,应重点研究模拟结果的工程应用价值;溃坝泥流分类体系尚不健全,应综合考虑泥流浓度、密度、级配组成等制定分类依据,据此选取适用的流变模型。TDBA方法研究与工程应用可为库区规划选址、加高扩容论证、防减灾措施布置等提供依据,助力实现“零伤亡、零危害”的尾矿库安全管理目标。