As an essential part of the industrial Internet of Things(IoT)in power systems,the development of advanced metering infrastructure(AMI)facilitates services such as energy monitoring,load forecasting,and demand respons...As an essential part of the industrial Internet of Things(IoT)in power systems,the development of advanced metering infrastructure(AMI)facilitates services such as energy monitoring,load forecasting,and demand response.However,there is a growing risk of privacy disclosure with the wide installation of smart meters,for they transmit readings and sensitive data simultaneously.To guarantee the confidentiality of the sensitive information and authenticity of smart meter readings,we proposed a privacy-preserving scheme based on digital watermarking and elliptic-curve cryptography(ECC)asymmetric encryption.The sensitive data are encrypted using the public key and are hidden in the collected readings using digital watermark.Only the authorized user can extract watermark and can decrypt the confidential data using its private key.The proposed method realizes secure end-to-end confidentiality of the sensitive information.It has faster computing speed and can verify the data source and ensure the authenticity of readings.The example results show that the proposed method has little influence on the original data and unauthorized access cannot be completed within a reasonable time.On embedded hardware,the processing speed of the proposed method is better than the existing methods.展开更多
Voltage profiles of feeders with the connection of distributed generations(DGs) were investigated.A unified typical load distribution model was established.Based on this model,exact expressions of feeder voltage profi...Voltage profiles of feeders with the connection of distributed generations(DGs) were investigated.A unified typical load distribution model was established.Based on this model,exact expressions of feeder voltage profile with single and double DGs were derived and used to analyze the impact of DG's location and capacity on the voltage profile quantitatively.Then,a general formula of the voltage profile was derived.The limitation of single DG and necessity of multiple DGs for voltage regulation were also discussed.Through the simulation,voltage profiles of feeders with single and double DGs were compared.The voltage excursion rate is 7.40% for only one DG,while 2.48% and 2.36% for double DGs.It is shown that the feeder voltage can be retained in a more appropriate range with multiple DGs than with only one DG.Distributing the total capacity of DGs is better than concentrating it at one point.展开更多
With the growing deployment of smart distribution grid,it has become urgent to investigate the smart distribution grid behavior during transient faults and improve the system stability.The feasibility of segmenting la...With the growing deployment of smart distribution grid,it has become urgent to investigate the smart distribution grid behavior during transient faults and improve the system stability.The feasibility of segmenting large power grids and multiple smart distribution grids interconnections using energy storage technology for improving the system dynamic stability was studied.The segmentation validity of the large power grids and smart distribution grid inverter output interconnections power system using energy storage technology was proved in terms of theoretical analysis.Then,the influences of the energy storage device location and capacity on the proposed method were discussed in detail.The conclusion is obtained that the ESD optimal locations are allocated at the tie line terminal buses in the interconnected grid,respectively.The effectiveness of the proposed method was verified by simulations in an actual power system.展开更多
随着多变的分布式可再生能源的大规模接入,配电系统将逐步从单纯接受和分配电能的传统电力网络,转变为能量交换网络。近年来,我国智能配电网的建设步伐正在加快。在开展配电网现代化的其他方面工作之前,应该首先做好配电网体系结构设计...随着多变的分布式可再生能源的大规模接入,配电系统将逐步从单纯接受和分配电能的传统电力网络,转变为能量交换网络。近年来,我国智能配电网的建设步伐正在加快。在开展配电网现代化的其他方面工作之前,应该首先做好配电网体系结构设计,即配电网最顶层模型的设计。虽然所谓的总配电系统运营商(total distribution system operator,DSO)模型是最可取方案,但在实践中尚未得到重视。为此,该文在已经过科学论证的电网分层和集群体系结构的框架下对这一问题进行论述,揭示总DSO模式的科学性和其实施的重要意义,并指出由不同局部配电网内的部分分布式能源所集成的虚拟电厂模式的弊端。进而,阐释了与实施DSO模式相关的几个战略性问题,包括重新定义配电服务、开放电表市场、激励新型电力需求和分布式电源的增长,树立新的电网设计理念等,以期大幅降低电网现代化建设的巨额花费。展开更多
基金Project(SGZJHZ00HLJS2000871)supported by the State Grid Science and Technology Project,China。
文摘As an essential part of the industrial Internet of Things(IoT)in power systems,the development of advanced metering infrastructure(AMI)facilitates services such as energy monitoring,load forecasting,and demand response.However,there is a growing risk of privacy disclosure with the wide installation of smart meters,for they transmit readings and sensitive data simultaneously.To guarantee the confidentiality of the sensitive information and authenticity of smart meter readings,we proposed a privacy-preserving scheme based on digital watermarking and elliptic-curve cryptography(ECC)asymmetric encryption.The sensitive data are encrypted using the public key and are hidden in the collected readings using digital watermark.Only the authorized user can extract watermark and can decrypt the confidential data using its private key.The proposed method realizes secure end-to-end confidentiality of the sensitive information.It has faster computing speed and can verify the data source and ensure the authenticity of readings.The example results show that the proposed method has little influence on the original data and unauthorized access cannot be completed within a reasonable time.On embedded hardware,the processing speed of the proposed method is better than the existing methods.
基金Projects(60904101,60972164) supported by the National Natural Science Foundation of ChinaProject(N090404009) supported by the Fundamental Research Funds for the Central UniversitiesProject(20090461187) supported by China Postdoctoral Science Foundation
文摘Voltage profiles of feeders with the connection of distributed generations(DGs) were investigated.A unified typical load distribution model was established.Based on this model,exact expressions of feeder voltage profile with single and double DGs were derived and used to analyze the impact of DG's location and capacity on the voltage profile quantitatively.Then,a general formula of the voltage profile was derived.The limitation of single DG and necessity of multiple DGs for voltage regulation were also discussed.Through the simulation,voltage profiles of feeders with single and double DGs were compared.The voltage excursion rate is 7.40% for only one DG,while 2.48% and 2.36% for double DGs.It is shown that the feeder voltage can be retained in a more appropriate range with multiple DGs than with only one DG.Distributing the total capacity of DGs is better than concentrating it at one point.
基金Project(N110404031)supported by the Fundamental Research Funds for the Central Universities,China
文摘With the growing deployment of smart distribution grid,it has become urgent to investigate the smart distribution grid behavior during transient faults and improve the system stability.The feasibility of segmenting large power grids and multiple smart distribution grids interconnections using energy storage technology for improving the system dynamic stability was studied.The segmentation validity of the large power grids and smart distribution grid inverter output interconnections power system using energy storage technology was proved in terms of theoretical analysis.Then,the influences of the energy storage device location and capacity on the proposed method were discussed in detail.The conclusion is obtained that the ESD optimal locations are allocated at the tie line terminal buses in the interconnected grid,respectively.The effectiveness of the proposed method was verified by simulations in an actual power system.
文摘随着多变的分布式可再生能源的大规模接入,配电系统将逐步从单纯接受和分配电能的传统电力网络,转变为能量交换网络。近年来,我国智能配电网的建设步伐正在加快。在开展配电网现代化的其他方面工作之前,应该首先做好配电网体系结构设计,即配电网最顶层模型的设计。虽然所谓的总配电系统运营商(total distribution system operator,DSO)模型是最可取方案,但在实践中尚未得到重视。为此,该文在已经过科学论证的电网分层和集群体系结构的框架下对这一问题进行论述,揭示总DSO模式的科学性和其实施的重要意义,并指出由不同局部配电网内的部分分布式能源所集成的虚拟电厂模式的弊端。进而,阐释了与实施DSO模式相关的几个战略性问题,包括重新定义配电服务、开放电表市场、激励新型电力需求和分布式电源的增长,树立新的电网设计理念等,以期大幅降低电网现代化建设的巨额花费。