期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
AN INFEASIBLE-INTERIOR-POINT PREDICTOR-CORRECTOR ALGORITHM FOR THE SECOND-ORDER CONE PROGRAM 被引量:11
1
作者 迟晓妮 刘三阳 《Acta Mathematica Scientia》 SCIE CSCD 2008年第3期551-559,共9页
A globally convergent infeasible-interior-point predictor-corrector algorithm is presented for the second-order cone programming (SOCP) by using the Alizadeh- Haeberly-Overton (AHO) search direction. This algorith... A globally convergent infeasible-interior-point predictor-corrector algorithm is presented for the second-order cone programming (SOCP) by using the Alizadeh- Haeberly-Overton (AHO) search direction. This algorithm does not require the feasibility of the initial points and iteration points. Under suitable assumptions, it is shown that the algorithm can find an -approximate solution of an SOCP in at most O(√n ln(ε0/ε)) iterations. The iteration-complexity bound of our algorithm is almost the same as the best known bound of feasible interior point algorithms for the SOCP. 展开更多
关键词 Second-order cone programming infeasible-interior-point algorithm predictor-corrector algorithm global convergence
在线阅读 下载PDF
Supply-based optimal scheduling of oil product pipelines 被引量:14
2
作者 Hao-Ran Zhang Yong-Tu Liang +2 位作者 Qiao Xiao Meng-Yu Wu Qi Shao 《Petroleum Science》 SCIE CAS CSCD 2016年第2期355-367,共13页
Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model ... Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model was established for a single-source multi-distribution oil pro- duct pipeline, and scheduling plans were made based on supply. In the model, time node constraints, oil offloading plan constraints, and migration of batch constraints were taken into consideration. The minimum deviation between the demanded oil volumes and the actual offloading volumes was chosen as the objective function, and a linear programming model was established on the basis of known time nodes' sequence. The ant colony optimization algo- rithm and simplex method were used to solve the model. The model was applied to a real pipeline and it performed well. 展开更多
关键词 Oil products pipeline Schedulingoptimization Linear programming (LP) modelAnt colony optimization algorithm (ACO) Simplex method (SM)
在线阅读 下载PDF
Development of 2D computer program to determine geometry of rock mass blocks 被引量:1
3
作者 Yarahmadi Reza Bagherpour Raheb +2 位作者 Kakaie Reza Mirzaie N. Hossein Yari Mojtaba 《International Journal of Mining Science and Technology》 SCIE EI 2014年第2期191-194,共4页
Due to various geological processes such as tectonic activities fractures might be created in rock mass body which causes creation of blocks with different shapes and sizes in the rock body. Exact understand- ing of t... Due to various geological processes such as tectonic activities fractures might be created in rock mass body which causes creation of blocks with different shapes and sizes in the rock body. Exact understand- ing of these blocks geometry is an essential issue concerned in different domains of rock engineering such as support system of underground spaces built in jointed rock masses, design of blasting pattern, optimi- zation of fragmentation, determination of cube blocks in quarry mines, blocks stability, etc. The aim of this paper is to develop a computer program to determine geometry of rock mass blocks in two dimen- sional spaces. In this article, the eometrv of iointed rock mass is programmed in MATLABTM. 展开更多
关键词 Block detection Computer programming Rock mass algorithm
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部