Bicycle-sharing system is considered as a green option to provide a better connection between scenic spots and nearby metro/bus stations. Allocating and optimizing the layout of bicycle-sharing system inside the sceni...Bicycle-sharing system is considered as a green option to provide a better connection between scenic spots and nearby metro/bus stations. Allocating and optimizing the layout of bicycle-sharing system inside the scenic spot and around its influencing area are focused on. It is found that the terrain, land use, nearby transport network and scenery point distribution have significant impact on the allocation of bicycle-sharing system. While the candidate bicycle-sharing stations installed at the inner scenic points, entrances/exits and metro stations are fixed, the ones installed at bus-stations and other passenger concentration buildings are adjustable. Aiming at minimizing the total cycling distance and overlapping rate, an optimization model is proposed and solved based on the idea of cluster concept and greedy heuristic. A revealed preference/stated preference (RP/SP) combined survey was conducted at Xuanwu Lake in Nanjing, China, to get an insight into the touring trip characteristics and bicycle-sharing tendency. The results reveal that 39.81% visitors accept a cycling distance of 1-3 km and 62.50% respondents think that the bicycle-sharing system should charge an appropriate fee. The sttrvey indicates that there is high possibility to carry out a bicycle-sharing system at Xuanwu Lake. Optimizing the allocation problem cluster by cluster rather than using an exhaustive search method significantly reduces the computing amount from O(2^43) to O(43 2). The 500 m-radius-coverage rate for the alternative optimized by 500 m-radius-cluster and 800 m-radius-cluster is 89.2% and 68.5%, respectively. The final layout scheme will provide decision makers engineering guidelines and theoretical support.展开更多
This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously a...This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.展开更多
The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime...The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime of a reliability system with sub- systems consisting of components in parallel. The constraints are minimizing the total resources and the sizes of subsystems. In this system, each switching is independent with each other and works with probability p. Two optimization problems are studied by an incremental algorithm and dynamic programming technique respectively. The incremental algorithm proposed could obtain an approximate optimal solution, and the dynamic programming method could generate the optimal solution,展开更多
Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilizatio...Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.展开更多
A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the ...A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the full IP orthogonal frequency division multiple access(OFDMA) communication system, which can ensure the quality of multimedia services in full IP networks.The algorithm converts the physical layer resources such as subcarriers, transmission power, and the QoS metrics into equivalent bandwidth which can be distributed by the base station in all three layers. By this means, the QoS requirements in terms of bit error rate(BER), transmission delay and dropping probability can be guaranteed by the cross-layer optimal equivalent bandwidth allocation. The numerical results show that the proposed algorithm has higher spectrum efficiency compared to the existing systems.展开更多
基金Project(51208261)supported by the National Natural Science Foundation of ChinaProject(12YJCZH062)supported by the Ministry of Education of Humanities and Social Science of ChinaProject(30920140132033)supported by the Fundamental Research Funds for the Central Universities,China
文摘Bicycle-sharing system is considered as a green option to provide a better connection between scenic spots and nearby metro/bus stations. Allocating and optimizing the layout of bicycle-sharing system inside the scenic spot and around its influencing area are focused on. It is found that the terrain, land use, nearby transport network and scenery point distribution have significant impact on the allocation of bicycle-sharing system. While the candidate bicycle-sharing stations installed at the inner scenic points, entrances/exits and metro stations are fixed, the ones installed at bus-stations and other passenger concentration buildings are adjustable. Aiming at minimizing the total cycling distance and overlapping rate, an optimization model is proposed and solved based on the idea of cluster concept and greedy heuristic. A revealed preference/stated preference (RP/SP) combined survey was conducted at Xuanwu Lake in Nanjing, China, to get an insight into the touring trip characteristics and bicycle-sharing tendency. The results reveal that 39.81% visitors accept a cycling distance of 1-3 km and 62.50% respondents think that the bicycle-sharing system should charge an appropriate fee. The sttrvey indicates that there is high possibility to carry out a bicycle-sharing system at Xuanwu Lake. Optimizing the allocation problem cluster by cluster rather than using an exhaustive search method significantly reduces the computing amount from O(2^43) to O(43 2). The 500 m-radius-coverage rate for the alternative optimized by 500 m-radius-cluster and 800 m-radius-cluster is 89.2% and 68.5%, respectively. The final layout scheme will provide decision makers engineering guidelines and theoretical support.
文摘This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.
基金supported by the National Natural Science Foundation of China(7117217271101158+3 种基金71272058)the Program for New Century Excellent Talents in University(NCET-10-0043)the Key Project Cultivation Fund of the Scientific and Technical Innovation Program of Beijing Institute of Technology(2011CX01001)the Special Fund of International Science and Technology Cooperation Program of Beijing Institute of Technology(GZ2014215101)
文摘The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime of a reliability system with sub- systems consisting of components in parallel. The constraints are minimizing the total resources and the sizes of subsystems. In this system, each switching is independent with each other and works with probability p. Two optimization problems are studied by an incremental algorithm and dynamic programming technique respectively. The incremental algorithm proposed could obtain an approximate optimal solution, and the dynamic programming method could generate the optimal solution,
基金Supported by the Science and Technology Research Project of the Ministry of Education(14YJCZH017)the Major State Basic Research Development Program of China(973 Program)(2017YFC0404503)+1 种基金Key Cultivation Project of Lingnan Normal University in 2019(LZ1903)Lingnan Normal University Special Talent Program(ZL2007)
文摘Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.
基金supported by the National Natural Science Foundation of China(61271235)the Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions-Information and Communication Engineering
文摘A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the full IP orthogonal frequency division multiple access(OFDMA) communication system, which can ensure the quality of multimedia services in full IP networks.The algorithm converts the physical layer resources such as subcarriers, transmission power, and the QoS metrics into equivalent bandwidth which can be distributed by the base station in all three layers. By this means, the QoS requirements in terms of bit error rate(BER), transmission delay and dropping probability can be guaranteed by the cross-layer optimal equivalent bandwidth allocation. The numerical results show that the proposed algorithm has higher spectrum efficiency compared to the existing systems.