Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automat...Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.展开更多
Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back t...Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back their historical paths.An intelligent data algorithm is proposed in a practical application.The algorithm can count the times of deliveries of trucks and load- ings of shovels.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards in open pits.展开更多
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig...Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.展开更多
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p...According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.展开更多
Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the...Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.展开更多
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco...This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.展开更多
This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study f...This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.展开更多
The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important f...The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project.展开更多
Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper estab...Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine.展开更多
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech...Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.展开更多
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th...To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.展开更多
文摘Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.
文摘Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back their historical paths.An intelligent data algorithm is proposed in a practical application.The algorithm can count the times of deliveries of trucks and load- ings of shovels.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards in open pits.
文摘Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.
基金Financial support from the National High-Tech Research and Development Program of China(No.2012AA062004)the National Natural Science Foundation of China(No.51034005)
文摘According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.
基金Federal Agency for Support and Evaluation of Graduate Education (CAPES – Brazil, Grant ID 19/2016)Fondation for Research Support of Minas Gerais (FAPEMIG – Brazil)University of New South Wales (UNSW – Australia)
文摘Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.
基金the Mine Planning Research Group–GIPLAMIN-of the Mines Faculty,National University of Colombia
文摘This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.
基金financially supported by the National Natural Science Foundation of China (No. 52174131)
文摘This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.
文摘The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project.
基金the key project of the National Natural Science Foundation of China (No. 51034005)the Research Fund for the Doctoral Program of Higher Education of China(No.20100095110019)+1 种基金the National‘‘Twelfth Five-Year’’Plan for Science and Technology Support of China(No.2014BAC14B00)the National High Technology Research and Development Program of China(No.2012AA062004)
文摘Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine.
文摘Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.
基金financially supported by the National Natural Science Foundation of China (No. 51034005)National High Technology Research and Development Program of China (No. 2012AA062004)Program for New Century Excellent Talents in University of China (No. NCET-13-1022)
文摘To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.