期刊文献+
共找到4,071篇文章
< 1 2 204 >
每页显示 20 50 100
Dynamic management system of ore blending in an open pit mine based on GIS/GPS/GPRS 被引量:19
1
作者 GU Qinghua LU Caiwu +1 位作者 GUO Jinping JING Shigun 《Mining Science and Technology》 EI CAS 2010年第1期132-137,共6页
Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automat... Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines. 展开更多
关键词 GIS GPS GPRS linear programming ore blending open pit mine
在线阅读 下载PDF
Monitoring dispatch information system of trucks and shovels in an open pit based on GIS/GPS/GPRS 被引量:18
2
作者 GU Qing-hua LU Cai-wu +1 位作者 LI Fa-ben WAN Chang-yong 《Journal of China University of Mining and Technology》 EI 2008年第2期288-292,共5页
Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back t... Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back their historical paths.An intelligent data algorithm is proposed in a practical application.The algorithm can count the times of deliveries of trucks and load- ings of shovels.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards in open pits. 展开更多
关键词 GIS GPS GPRS DISPATCH data processing open pit
在线阅读 下载PDF
Reserve estimation of an open pit mine under price uncertainty by real option approach 被引量:8
3
作者 AKBARI Afshin Dehkharghani OSANLOO Morteza SHIRAZI Mohsen Akbarpour 《Mining Science and Technology》 EI CAS 2009年第6期709-717,共9页
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig... Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners. 展开更多
关键词 RESERVE open pit mining metal price uncertainty Real Option Approach (ROA) copper deposit
在线阅读 下载PDF
Optimization of transport passage with dragline system in thick overburden open pit mine 被引量:3
4
作者 Zhang Weishi Cai Qingxiang Chen Shuzhao 《International Journal of Mining Science and Technology》 SCIE EI 2013年第6期901-906,共6页
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p... According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure. 展开更多
关键词 open pit mine DRAGLINE Transport passage Middle passage Internal dump
在线阅读 下载PDF
Quantitative hazard assessment system(Has-Q) for open pit mine slopes 被引量:2
5
作者 Tatiana Barreto dos Santos Milene Sabino Lana +1 位作者 Tiago Martins Pereira Ismet Canbulat 《International Journal of Mining Science and Technology》 EI CSCD 2019年第3期419-427,共9页
Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the... Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%. 展开更多
关键词 Hazard assessment Risk analysis open pit mine slopes Multivariate statistics
在线阅读 下载PDF
NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using Gas 被引量:1
6
作者 Franco-Sepulveda Giovanni Campuzano Carlos Pineda Cindy 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第3期557-565,共9页
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco... This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV. 展开更多
关键词 Genetic algorithms(GAs) O’Hara cost model Montecarlo simulation open pit gold mine NPV risk analysis
在线阅读 下载PDF
Geopolymer-based modification of blasting sealing materials and optimization of blasting block size in coal seams of open pit mines
7
作者 Xiaohua Ding Zhongchen Ao +5 位作者 Wei Zhou Hao Qin Zhongao Yang Wen An Xiaoshuang Li Honglin Liu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2023年第12期1551-1562,共12页
This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study f... This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages. 展开更多
关键词 open pit coal mine Coal seam blasting Sealing materials Block size optimization Numerical simulation
在线阅读 下载PDF
Overburden management in open pits: options and limits in large limestone quarries 被引量:6
8
作者 Claudio Oggeri Taddeo Maria Fenoglio +1 位作者 Alberto Godio Raffaele Vinai 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第2期217-228,共12页
The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important f... The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project. 展开更多
关键词 open pit OVERBURDEN Soil TESTING LIMESTONE QUARRY Muck ON-SITE TESTING
在线阅读 下载PDF
Calculation of slope-cover height under price fluctuation in open-pit mines 被引量:1
9
作者 Ma Jinyan Cai Qingxiang +1 位作者 Liu Fuming Chen Shuzhao 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期293-297,共5页
Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper estab... Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine. 展开更多
关键词 open pit Slope cover height Transport costs Re-stripping
在线阅读 下载PDF
Application of open-pit and underground mining technology for residual coal of end slopes 被引量:9
10
作者 CHE, Zhaoxue YANG, Hong 《Mining Science and Technology》 EI CAS 2010年第2期266-270,共5页
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech... Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized. 展开更多
关键词 integrated open-pit and underground mining end-slope resource recovery economic benefit surface coal mine
在线阅读 下载PDF
Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine 被引量:1
11
作者 Ning Fang Ji Changsheng Garmondyu E.Crusoe Jr. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期869-875,共7页
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th... To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P. 展开更多
关键词 open-pit mine Side slope Sliding process Aging stability Crack zone
在线阅读 下载PDF
融合多源因素回归和ARIMA-LSTM的露天矿地表形变趋势分析
12
作者 李如仁 李梦晨 +1 位作者 葛永权 刘明霞 《金属矿山》 北大核心 2025年第1期186-197,共12页
露天矿山大规模开采引发的地表形变严重威胁了周边基础设施的稳固性及附近民众生命财产安全,形变演化趋势的精准预测对于保障矿山安全运营具有重要意义。针对当前形变监测技术的时空采样率低、成本高,以及数据处理过程中影响因子筛选困... 露天矿山大规模开采引发的地表形变严重威胁了周边基础设施的稳固性及附近民众生命财产安全,形变演化趋势的精准预测对于保障矿山安全运营具有重要意义。针对当前形变监测技术的时空采样率低、成本高,以及数据处理过程中影响因子筛选困难、趋势预测精度欠佳等问题,以辽宁省鞍山市露天矿集中分布区为工程背景,提出了一种融合自回归差分移动平均(Autoregressive Integrated Moving Average,ARIMA)模型—长短期记忆网络(Long Short-Term Memory,LSTM)模型的多源因素融合回归的露天矿地表形变演化趋势分析方法。首先,利用短基线子集干涉测量(Small Baseline Subset Interferometric Synthetic Aperture Radar,SBAS-InSAR)技术开展2020年1月—2022年4月期间研究区地表形变的长时序监测,获取该时段内地表形变时空分布特征。然后,耦合因子分析及灰色关联分析法提取形变主影响因子,基于皮尔逊相关系数(Pearson)验证影响因子的筛选效果,同时考虑地表相邻点位形变的联动效应,构建了多源异构数据融合回归序列。在此基础上,引入自回归差分移动平均(ARIMA)模型改进的长短期记忆网络(LSTM)模型开展形变趋势预测,并采用平均绝对误差(Mean Absolute Error,MAE)、标准误差(Root Mean Square Error,RMSE)以及平均百分比误差(Mean Absolute Percentage Error,MAPE)评估所提方法的预测性能。结果表明:监测期内东鞍山矿东部、大孤山矿中部以及鞍千矿东部沉降相对严重,年均沉降速率最高达166.41 mm/a。耦合因子分析及灰色关联度法提取的影响因子合理可靠,融合高程、地形起伏度及累积降雨量等因子的形变序列更贴合矿区地表真实形变过程。与ARIMA-LSTM模型相比,基于多源因素融合回归模型的预测误差MAE、RMSE、MAPE分别降低了48.0%、16.7%和25.5%,预测精度有所改善且能够有效反映形变累积的整体趋势。 展开更多
关键词 露天矿 形变监测 多源数据融合 形变趋势预测 SBAS-InSAR ARIMA-LSTM
在线阅读 下载PDF
基于强度折减有限元法的排土场边坡稳定性数值模拟研究
13
作者 邱振华 陈光木 黄春福 《有色金属(矿山部分)》 2025年第1期72-81,共10页
以大宝山矿李屋排土场边坡为背景,旨在建立一种方法准确评价现状排土场的稳定性。为此,利用强度折减有限元法,分析了排土场边坡稳定性。首先,针对性制定李屋排土场边坡稳定性的强度折减有限元数值计算方案,并构建相关三维数值计算模型... 以大宝山矿李屋排土场边坡为背景,旨在建立一种方法准确评价现状排土场的稳定性。为此,利用强度折减有限元法,分析了排土场边坡稳定性。首先,针对性制定李屋排土场边坡稳定性的强度折减有限元数值计算方案,并构建相关三维数值计算模型、设置数值计算参数;然后,模拟分析了排土场的设计边坡与现状边坡的应力、位移和塑性区的三维分布特征;最后,对排土场设计边坡和现状边坡的稳定性进行了对比分析,确立了现状边坡的稳定性。结果表明:现状排土场中应力分布规律与设计排土场一致,均呈现出随深度增大应力逐渐增大的规律,且均产生了较大范围的塑性区;但现状排土场的应力大小和塑性区范围均小于设计排土场。结果表明当前排土场稳定性较好。研究成果对排土场稳定性评价与安全控制具有重要参考意义。 展开更多
关键词 排土场边坡 稳定性 强度折减有限元法 露天矿山 数值计算
在线阅读 下载PDF
海外大型露天矿山智能化建设体系与应用实践——以拉斯邦巴斯铜矿为例 被引量:1
14
作者 吴立活 Miguel Canz +3 位作者 Hermes Guevara 李国清 侯杰 张永芳 《金属矿山》 北大核心 2025年第1期207-215,共9页
拉斯邦巴斯铜矿运用现代化信息技术构建覆盖“地质资源—计划管理—过程控制—安全保障—智能决策”全方位智能化建设框架,通过关键应用场景设计与应用,实现矿山生产运营的高效协同与智能管理。针对矿体赋存条件复杂、开采规模庞大、作... 拉斯邦巴斯铜矿运用现代化信息技术构建覆盖“地质资源—计划管理—过程控制—安全保障—智能决策”全方位智能化建设框架,通过关键应用场景设计与应用,实现矿山生产运营的高效协同与智能管理。针对矿体赋存条件复杂、开采规模庞大、作业地点分散等问题,应用矿床地质建模、三维可视化及无人机技术,实现矿山全生命周期的地质资源精细化管控。在此基础上优化开采工艺,应用精准定位及智能卡调技术,实现大规模高陡边坡的精准穿孔、控制爆破以及矿岩运输。构建了以超前预防为目标,全面覆盖人、机、环、管,与生产过程深度融合的矿山安全监测预警体系,显著提升了矿山的安全作业水平。通过云平台和数据湖技术实现多源异构数据融合,应用机器学习算法构建数据分析与决策模型,为矿山管理者科学决策提供有力支持。拉斯邦巴斯铜矿智能化建设成果对于国内大型露天矿山智能化建设具有一定的示范作用。 展开更多
关键词 海外矿产资源 大型露天矿 拉斯邦巴斯铜矿 智能矿山 应用场景
在线阅读 下载PDF
露天矿下伏采空区距坡脚水平距离对边坡稳定性的影响
15
作者 管少杰 吕进国 +1 位作者 王康 张砚力 《工矿自动化》 北大核心 2025年第2期113-120,共8页
为研究露天矿下伏采空区距坡脚水平距离对边坡稳定性的影响,以中煤平朔集团有限公司东露天矿首采区北端帮边坡为工程背景,采用相似模拟与数值模拟相结合的方法,在考虑采空区上覆岩层垮落带和断裂带(“两带”)分布的基础上,研究了采空区... 为研究露天矿下伏采空区距坡脚水平距离对边坡稳定性的影响,以中煤平朔集团有限公司东露天矿首采区北端帮边坡为工程背景,采用相似模拟与数值模拟相结合的方法,在考虑采空区上覆岩层垮落带和断裂带(“两带”)分布的基础上,研究了采空区距坡脚不同水平距离时采空区覆岩及边坡位移变化规律和边坡稳定性系数。结果表明:①随着采空区距坡脚水平距离的减小,垮落带高度逐渐增大,断裂带逐渐显现,采空区上覆岩层裂隙逐渐扩展至边坡坡面,当坡面出现小范围裂缝时,边坡处于失稳状态。②随着采空区距坡脚水平距离的减小,采空区上覆岩层出现垂直位移集中区并逐渐向上扩展,直至与边坡坡面贯通;水平位移集中区有向上部扩展的趋势,当上覆岩层的水平位移集中区与边坡的水平位移集中区贯通时,边坡处于不稳定状态。③边坡坡面水平位移、垂直位移均随着采空区距坡脚水平距离的减小而增大。④采空区距坡脚水平距离越大,边坡稳定性系数越大,边坡越不易发生失稳破坏。 展开更多
关键词 露天矿 边坡稳定性 下伏采空区 边坡坡角 垮落带 断裂带
在线阅读 下载PDF
露天煤矿富水炮孔间隔装药爆破及效果评价
16
作者 张鹏飞 程虹铭 杨小彬 《煤炭技术》 2025年第2期27-30,共4页
为实现露天煤矿富水炮孔间隔装药爆破,研发专用间隔器及装药工艺。选定现场2个富水区开展富水炮孔间隔装药爆破试验,现场间隔装药合格率大于80%,所选的2个试验区爆破后粒径小于1.5 m的岩块比例分别为99.77%和99.69%,大块率分别为0.23和0... 为实现露天煤矿富水炮孔间隔装药爆破,研发专用间隔器及装药工艺。选定现场2个富水区开展富水炮孔间隔装药爆破试验,现场间隔装药合格率大于80%,所选的2个试验区爆破后粒径小于1.5 m的岩块比例分别为99.77%和99.69%,大块率分别为0.23和0.31,铲装后的根底率分别为1.3%和2.1%,与连续装药爆破的大块率和根底率相当。基于未确知测度理论建立了富水炮孔间隔装药爆破评价模型,以大块率、根底率、炸药单耗和单孔装药耗为评价指标,得到2个试验区间隔装药爆破与连续装药爆破的效果综合评价均为较好,即富水炮孔间隔装药爆破可实现与连续装药爆破相当的爆破效果。 展开更多
关键词 露天煤矿 富水炮孔 间隔装药 效果评价
在线阅读 下载PDF
某深凹露天矿复杂边坡稳定性数值模拟及加固措施研究
17
作者 梁源贵 周宗红 +2 位作者 侯廷凯 黄耀春 孙慧珍 《有色金属(矿山部分)》 2025年第1期65-71,81,共8页
某金矿现阶段采用露天开采的方式进行生产,已形成高度约400 m的边坡,西部边坡等区域受多个交汇断层的影响发生了失稳滑移,严重威胁矿山安全生产。随着开采深度的不断增大,边坡稳定性进一步下降,急需对边坡的稳定性及支护手段展开研究。... 某金矿现阶段采用露天开采的方式进行生产,已形成高度约400 m的边坡,西部边坡等区域受多个交汇断层的影响发生了失稳滑移,严重威胁矿山安全生产。随着开采深度的不断增大,边坡稳定性进一步下降,急需对边坡的稳定性及支护手段展开研究。在相关室内试验的基础上,采用数值模拟方法,建立了采场三维立体模型,从应力、位移和剪切应变增量的角度对研究区域扩帮至最终境界过程中的稳定性进行分析,并提出相应的加固方案。结果表明:随着开挖的持续,受断层、自重地+下水+地震的影响,露天边坡逐渐进入欠稳定状态,最终失稳;当在断层区域采用锚固段长度12 m、自由段长度分别为25、36及37 m、倾角20°、间距4 m的预应力锚索进行加固后,边坡可以保持稳定。研究结果为矿山设计和生产提供理论依据。 展开更多
关键词 露天边坡 边坡稳定 数值模拟 FLAC3D 支护
在线阅读 下载PDF
复杂断层构造高陡边坡稳定性计算分析
18
作者 刘惠洋 张东亮 +3 位作者 李光 金长宇 吕凯 杨光辉 《有色金属(矿山部分)》 2025年第1期38-44,共7页
复杂断层构造是威胁矿山安全的重要危险源之一,对露天矿边坡进行稳定性分析、安全评价和治理研究已成为国内外矿山研究领域的重要课题。选取白云鄂博铁矿主采场南帮作为研究背景,针对该地区高陡边坡存在的复杂断层、局部失稳和滑坡等地... 复杂断层构造是威胁矿山安全的重要危险源之一,对露天矿边坡进行稳定性分析、安全评价和治理研究已成为国内外矿山研究领域的重要课题。选取白云鄂博铁矿主采场南帮作为研究背景,针对该地区高陡边坡存在的复杂断层、局部失稳和滑坡等地质问题展开了深入调查和研究。研究采用了数值分析和短基线子集干涉测量(SBASInSAR)技术,能较为准确预测可能发生滑移的区域,提供精确的边坡稳定性评估。通过三维数值分析搜索潜在危险靶区,并用二维精细剖面计算进一步分析。在此基础上,应用SBAS-InSAR技术对地表形变进行时序监测,通过分析雷达影像的相位信息,精确测量地表微小变形,进一步验证了数值分析的可靠性和有效性。本文综合两种技术手段,全面评估了白云鄂博铁矿主采场南帮地区的边坡稳定性,有效预防和减轻了地质灾害带来的损失,并为类似复杂断层构造的高陡露天矿边坡稳定性分析提供了一定参考。 展开更多
关键词 露天矿 边坡稳定性分析 断层破碎带 SBAS-InSAR
在线阅读 下载PDF
基于大疆MK300RTK的露天煤矿无人机智能巡视系统研发
19
作者 江杰 谢国良 +1 位作者 郭鸣翔 侍红军 《煤矿机械》 2025年第2期196-199,共4页
基于大疆MK300RTK研发了露天煤矿无人机智能巡视系统。该系统通过集成红外及高清摄像头的无人机智能巡视、实时数据传输及识别,实现露天煤矿的工作人员不安全行为及时识别及安全设施规范检测功能,减少非必要人工环节,实现生产规范化、... 基于大疆MK300RTK研发了露天煤矿无人机智能巡视系统。该系统通过集成红外及高清摄像头的无人机智能巡视、实时数据传输及识别,实现露天煤矿的工作人员不安全行为及时识别及安全设施规范检测功能,减少非必要人工环节,实现生产规范化、流程可视化、系统智能化,进一步保障煤矿安全生产,提高企业经济效益。 展开更多
关键词 露天煤矿 无人机 智能巡视 不安全行为识别 安全生产
在线阅读 下载PDF
绿色矿山背景下非金属露天矿山“横切”式开采模式探讨
20
作者 郭冬艳 强海洋 陈丽新 《中国矿业》 北大核心 2025年第1期102-106,共5页
绿色矿山建设是矿业领域生态文明建设的有力抓手。在全面推进绿色矿山建设背景下,探索可复制可推广的建设模式非常重要。本文系统梳理了非金属露天矿山“横切”式开采模式的内涵和优势,分析了其实践路径、存在问题,并提出了政策建议。... 绿色矿山建设是矿业领域生态文明建设的有力抓手。在全面推进绿色矿山建设背景下,探索可复制可推广的建设模式非常重要。本文系统梳理了非金属露天矿山“横切”式开采模式的内涵和优势,分析了其实践路径、存在问题,并提出了政策建议。研究结果表明:“横切”式开采推动矿山企业从重视后端的生态修复治理向前端的开采方式优化转变,有助于实现资源开发、环境保护、安全生产、经济发展的统筹协调,是一种适用于建材等非金属矿产的绿色矿山模式创新。该模式的实践路径包括建立标准规范、开展试点示范、严格分类管理、政府主导推动等四方面,目前面临矿规调整周期长、矿业用地供应难、资源短期稳定供给受影响、建设成效后期才能逐步显现等四方面的问题。在此基础上提出了四方面的政策建议,分别是立足矿山实际、因地制宜推进;注重工作衔接、打通政策堵点;做好长期跟踪、完善政策标准;坚持系统思维、提高内生动力。通过本文研究以期为完善我国绿色矿山建设制度体系,助力建设美丽中国提供借鉴参考。 展开更多
关键词 绿色矿山 非金属矿 露天矿山 “横切”式开采 河北
在线阅读 下载PDF
上一页 1 2 204 下一页 到第
使用帮助 返回顶部