In district heating(DH) system with gas-fired peak load regulating boiler in the secondary network,by prolonging run time of base load plants under rated condition,the mean energy efficiency could be increased. The fu...In district heating(DH) system with gas-fired peak load regulating boiler in the secondary network,by prolonging run time of base load plants under rated condition,the mean energy efficiency could be increased. The fuels of the system,including coal and gas,would cause different environmental impacts. Meanwhile,the reliability of the heating networks would be changed because the peak load regulating boiler could work as a standby heat source. A model for assessment of heating system was established by value analysis to optimize this kind of system. Energy consumption,greenhouse gas emission,pollution emission and system reliability were selected as functional assessment indexes in the model. Weights of each function were determined by analytical hierarchy process (AHP) and experts consultation. Life cycle cost was used as the cost in the model. A real case as an example was discussed to obtain the optimal base load ratio. The result shows that the optimal base load ratio of the case is 0.77.展开更多
文摘In district heating(DH) system with gas-fired peak load regulating boiler in the secondary network,by prolonging run time of base load plants under rated condition,the mean energy efficiency could be increased. The fuels of the system,including coal and gas,would cause different environmental impacts. Meanwhile,the reliability of the heating networks would be changed because the peak load regulating boiler could work as a standby heat source. A model for assessment of heating system was established by value analysis to optimize this kind of system. Energy consumption,greenhouse gas emission,pollution emission and system reliability were selected as functional assessment indexes in the model. Weights of each function were determined by analytical hierarchy process (AHP) and experts consultation. Life cycle cost was used as the cost in the model. A real case as an example was discussed to obtain the optimal base load ratio. The result shows that the optimal base load ratio of the case is 0.77.