To acquire a knowledge of the stress-strain state in the process of mining beforehand, a numerical method was used to simulate the stoping process of access mechanized panel mining in No. 3 ore-body of Tonglushan mine...To acquire a knowledge of the stress-strain state in the process of mining beforehand, a numerical method was used to simulate the stoping process of access mechanized panel mining in No. 3 ore-body of Tonglushan mine; and for the sake of obtaining better stability, the optimal panel dimension and access stoping sequence were researched. The results show that the integral stability of the mechanized panel of No. 3 ore-body is passable in the process of winning at full level height; the stability of panel tends to be worse gradually with continuous increasing of panel width; and the better width of access panel in No.3 ore-body is less than 52 m. It is indicated that 3D elasto-plastic finite element method can make a satisfactory study of numerical simulation on the panel stability and its structural dimension in the test for the upward access mechanized-panel mining. The results of the theoretical calculation and analysis accord with the actual situation from the field ground pressure monitoring.展开更多
This study presents a novel approach using theoretical analysis to assess the risk of rock burst of an island longwall panel that accounts for the coupled behavior of stress distribution and overlying strata movement....This study presents a novel approach using theoretical analysis to assess the risk of rock burst of an island longwall panel that accounts for the coupled behavior of stress distribution and overlying strata movement. The height of destressed zone(HDZ) above the mined panel was first determined based on the strain energy balance in an underground coal mining area. HDZ plays a vital role in accurately determining the amount of different loads being transferred towards the front abutment and panel sides. Subsequently, based on the load transfer mechanisms, a series of formulae were derived for the average static and dynamic stresses in the island pillar through theoretical analysis. Finally, the model was applied to determining the side abutment stress distribution of LW 3112 in the Chaoyang Coal Mine and the results of ground subsidence monitoring were used to verify the predicted model. It can be concluded that the proposed computational model can be successfully applied to determining the safety of mining in island longwall panels.展开更多
基金Project(2001BA901A09) supported by the Key Program of the 10th Five year Plan of China
文摘To acquire a knowledge of the stress-strain state in the process of mining beforehand, a numerical method was used to simulate the stoping process of access mechanized panel mining in No. 3 ore-body of Tonglushan mine; and for the sake of obtaining better stability, the optimal panel dimension and access stoping sequence were researched. The results show that the integral stability of the mechanized panel of No. 3 ore-body is passable in the process of winning at full level height; the stability of panel tends to be worse gradually with continuous increasing of panel width; and the better width of access panel in No.3 ore-body is less than 52 m. It is indicated that 3D elasto-plastic finite element method can make a satisfactory study of numerical simulation on the panel stability and its structural dimension in the test for the upward access mechanized-panel mining. The results of the theoretical calculation and analysis accord with the actual situation from the field ground pressure monitoring.
基金Project(2017CXNL01) supported by the Fundamental Research Funds for the Central Universities,China
文摘This study presents a novel approach using theoretical analysis to assess the risk of rock burst of an island longwall panel that accounts for the coupled behavior of stress distribution and overlying strata movement. The height of destressed zone(HDZ) above the mined panel was first determined based on the strain energy balance in an underground coal mining area. HDZ plays a vital role in accurately determining the amount of different loads being transferred towards the front abutment and panel sides. Subsequently, based on the load transfer mechanisms, a series of formulae were derived for the average static and dynamic stresses in the island pillar through theoretical analysis. Finally, the model was applied to determining the side abutment stress distribution of LW 3112 in the Chaoyang Coal Mine and the results of ground subsidence monitoring were used to verify the predicted model. It can be concluded that the proposed computational model can be successfully applied to determining the safety of mining in island longwall panels.