A smart city provides a new idea and model for urban construction, management, and development. This article proposes the concepts and methodology for top-level design of smart cities based on the " Integration of Fo...A smart city provides a new idea and model for urban construction, management, and development. This article proposes the concepts and methodology for top-level design of smart cities based on the " Integration of Four Plans ", and the planning process and systems for implementing the top-level design of smart cities. This article discusses, from the perspective of a city, how to optimize resource allocation, coordinate the development of urban economy, society, resources, environment, and people's livelihood, and map out the blueprints for healthy and sustainable development of a smart city.展开更多
The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDR...The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDRs)of flexible loads,electric vehicles,and energy storage is proposed in this work.First,based on load substitution at the user side,an energy-station model considering the IDR is established.Then,based on the characteristics of the energy network,a collaborative planning model is established for the energy station and energy network of the IES,considering the comprehensive system investment,operation and maintenance,and clean energy shortage penalty costs,to minimize the total cost.This can help optimize the locations of the power lines and natural gas pipelines and the capacities of the equipment in an energy station.Finally,simulations are performed to demonstrate that the proposed planning method can help delay or reduce the construction of new lines and energy-station equipment,thereby reducing the investment required and improving the planning economics of the IES.展开更多
Integrated energy systems(lESs)represent a promising energy supply model within the energy internet.However,multi-energy flow coupling in the optimal configuration of IES results in a series of simplifications in the ...Integrated energy systems(lESs)represent a promising energy supply model within the energy internet.However,multi-energy flow coupling in the optimal configuration of IES results in a series of simplifications in the preliminary planning,affecting the cost,efficiency,and environmental performance of IES.A novel optimal planning method that considers the part-load characteristics and spatio-temporal synergistic effects of IES components is proposed to enable a rational design of the structure and size of IES.An extended energy hub model is introduced based on the“node of energy hub”concept by decomposing the IES into different types of energy equipment.Subsequently,a planning method is applied as a two-level optimization framework-the upper level is used to identify the type and size of the component,while the bottom level is used to optimize the operation strategy based on a typical day analysis method.The planning problem is solved using a two-stage evolutionary algorithm,combing the multiple-mutations adaptive genetic algorithm with an interior point optimization solver,to minimize the lifetime cost of the IES.Finally,the feasibility of the proposed planning method is demonstrated using a case study.The life cycle costs of the IES with and without consideration of the part-load characteristics of the components were$4.26 million and$4.15 million,respectively,in the case study.Moreover,ignoring the variation in component characteristics in the design stage resulted in an additional 11.57%expenditure due to an energy efficiency reduction under the off-design conditions.展开更多
There has been increasing interests in developing land use models for small urban areas for various planning applications such as air quality conformity analysis. The output of a land use model can serve as a major in...There has been increasing interests in developing land use models for small urban areas for various planning applications such as air quality conformity analysis. The output of a land use model can serve as a major input to a transportation model; conversely, transportation model output can provide a critical input to a land use model. The connection between the two models can be achieved by an accessibility measure. This paper presents an iterative approach to solving a regression-based land use model and a transportation model with combined trip distribution- assignment. A case study using data from a small urban area is presented to illustrate the application of the proposed modeling framework. Tests show that the procedures can converge, and the modeling framework can be a valuable tool for planners and decision-makers in evaluating land use policies and transportation investment strategies.展开更多
The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the sat...The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.展开更多
Based on the multiliteracies framework proposed by New London Group,this paper puts forwards a 90-minute lesson plan for An Integrated English course which includes situated practice,overt instruction,critical framing...Based on the multiliteracies framework proposed by New London Group,this paper puts forwards a 90-minute lesson plan for An Integrated English course which includes situated practice,overt instruction,critical framing and transformed practice,aiming to provide teachers with a new perspective to design lesson plans with multiliteracies pedagogy in this new era of media English language teaching.展开更多
文摘A smart city provides a new idea and model for urban construction, management, and development. This article proposes the concepts and methodology for top-level design of smart cities based on the " Integration of Four Plans ", and the planning process and systems for implementing the top-level design of smart cities. This article discusses, from the perspective of a city, how to optimize resource allocation, coordinate the development of urban economy, society, resources, environment, and people's livelihood, and map out the blueprints for healthy and sustainable development of a smart city.
基金supported in part by the National Key R&D Program of China(2018YFB0905000)the Science and Technology Project of the State Grid Corporation of China(SGTJDK00DWJS1800232)
文摘The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDRs)of flexible loads,electric vehicles,and energy storage is proposed in this work.First,based on load substitution at the user side,an energy-station model considering the IDR is established.Then,based on the characteristics of the energy network,a collaborative planning model is established for the energy station and energy network of the IES,considering the comprehensive system investment,operation and maintenance,and clean energy shortage penalty costs,to minimize the total cost.This can help optimize the locations of the power lines and natural gas pipelines and the capacities of the equipment in an energy station.Finally,simulations are performed to demonstrate that the proposed planning method can help delay or reduce the construction of new lines and energy-station equipment,thereby reducing the investment required and improving the planning economics of the IES.
基金the National Natural Science Foundation of China(Grant No.51821004)supported by the Major Program of the National Natural Science Foundation of China(Grant No.52090062)The author Chengzhou Li also thank the China Scholarship Council(CSC)for the financial support.
文摘Integrated energy systems(lESs)represent a promising energy supply model within the energy internet.However,multi-energy flow coupling in the optimal configuration of IES results in a series of simplifications in the preliminary planning,affecting the cost,efficiency,and environmental performance of IES.A novel optimal planning method that considers the part-load characteristics and spatio-temporal synergistic effects of IES components is proposed to enable a rational design of the structure and size of IES.An extended energy hub model is introduced based on the“node of energy hub”concept by decomposing the IES into different types of energy equipment.Subsequently,a planning method is applied as a two-level optimization framework-the upper level is used to identify the type and size of the component,while the bottom level is used to optimize the operation strategy based on a typical day analysis method.The planning problem is solved using a two-stage evolutionary algorithm,combing the multiple-mutations adaptive genetic algorithm with an interior point optimization solver,to minimize the lifetime cost of the IES.Finally,the feasibility of the proposed planning method is demonstrated using a case study.The life cycle costs of the IES with and without consideration of the part-load characteristics of the components were$4.26 million and$4.15 million,respectively,in the case study.Moreover,ignoring the variation in component characteristics in the design stage resulted in an additional 11.57%expenditure due to an energy efficiency reduction under the off-design conditions.
文摘There has been increasing interests in developing land use models for small urban areas for various planning applications such as air quality conformity analysis. The output of a land use model can serve as a major input to a transportation model; conversely, transportation model output can provide a critical input to a land use model. The connection between the two models can be achieved by an accessibility measure. This paper presents an iterative approach to solving a regression-based land use model and a transportation model with combined trip distribution- assignment. A case study using data from a small urban area is presented to illustrate the application of the proposed modeling framework. Tests show that the procedures can converge, and the modeling framework can be a valuable tool for planners and decision-makers in evaluating land use policies and transportation investment strategies.
基金supported by the Natural Science Foundation of China under Grants U19B2025,62121001,and 62001347in part by Key Research and Development Program of Shaanxi(ProgramNo.2022ZDLGY05-02)in part by Young Talent Support Program of Xi’an Association for Science and Technology(No.095920221337).
文摘The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.
基金This project is supported by Shanghai Foreign Language Education Pressresearch funds under grant(No.SK2018A1166)。
文摘Based on the multiliteracies framework proposed by New London Group,this paper puts forwards a 90-minute lesson plan for An Integrated English course which includes situated practice,overt instruction,critical framing and transformed practice,aiming to provide teachers with a new perspective to design lesson plans with multiliteracies pedagogy in this new era of media English language teaching.