Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources C...Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.展开更多
随着人们对人数统计需求的不断增长,基于信道状态信息(channel state information,CSI)的人流量监测技术因其易于部署、保护隐私和适用性强等优势而备受关注.然而,在现有的人流量监测工作中,人数识别的准确率容易受到人群密集程度的影响...随着人们对人数统计需求的不断增长,基于信道状态信息(channel state information,CSI)的人流量监测技术因其易于部署、保护隐私和适用性强等优势而备受关注.然而,在现有的人流量监测工作中,人数识别的准确率容易受到人群密集程度的影响.为了保证监测精度,通常只能在人群稀疏的情况下进行监测,这导致了基于CSI的人流量监测技术缺乏实用性.为了解决这一问题,提出了一种能够识别连续性人流的监测方法.该方法首先利用解卷绕和线性相位校正算法,对原始数据进行相位补偿并消除随机相位偏移;然后通过标准差和方差提取连续性人流数据中的有效数据包;最后将时域上的相位差信息作为特征信号输入到深度学习的CLDNN(convolutional,long short-term memory,deep neural network)中进行人数识别.经过实验测试,该方法在前后排行人距离不小于1 m的情况下,分别实现了室外96.7%和室内94.1%的准确率,优于现有的人流量监测方法.展开更多
文摘Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.