期刊文献+
共找到731篇文章
< 1 2 37 >
每页显示 20 50 100
Design and implementation of model test installation of heave compensation system of deepsea mining 被引量:2
1
作者 胡琼 刘少军 郑皓 《Journal of Central South University》 SCIE EI CAS 2011年第3期642-649,共8页
In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave co... In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave compensation system,the lifting pipe simulator,the buffer simulator and the water pool.The tests ofmining ship motion simulator show that it is able to perform under the predetermined attitude path smoothly and can meet the requirements of themining ship motions.The heave compensation effect is more than 60% under random wave and the goal is set to be 50%.The model test results indicate that this heave compensation system is effective and feasible. 展开更多
关键词 deepsea mining heave compensation model test installation mining ship motion simulator gimbal
在线阅读 下载PDF
Explosion resistance performance of reinforced concrete box girder coated with polyurea:Model test and numerical simulation
2
作者 Guangpan Zhou Rong Wang +2 位作者 Mingyang Wang Jianguo Ding Yuye Zhang 《Defence Technology(防务技术)》 SCIE EI CAS CSCD 2024年第3期1-18,共18页
To study the anti-explosion protection effect of polyurea coating on reinforced concrete box girder,two segmental girder specimens were made at a scale of 1:3,numbered as G(without polyurea coating)and PCG(with polyur... To study the anti-explosion protection effect of polyurea coating on reinforced concrete box girder,two segmental girder specimens were made at a scale of 1:3,numbered as G(without polyurea coating)and PCG(with polyurea coating).The failure characteristics and dynamic responses of the specimens were compared through conducting explosion tests.The reliability of the numerical simulation using LS-DYNA software was verified by the test results.The effects of different scaled distances,reinforcement ratios,concrete strengths,coating thicknesses and ranges of polyurea were studied.The results show that the polyurea coating can effectively enhance the anti-explosion performance of the girder.The top plate of middle chamber in specimen G forms an elliptical penetrating hole,while that in specimen PCG only shows a very slight local dent.The peak vertical displacement and residual displacement of PCG decrease by 74.8% and 73.7%,respectively,compared with those of specimen G.For the TNT explosion with small equivalent,the polyurea coating has a more significant protective effect on reducing the size of fracture.With the increase of TNT equivalent,the protective effect of polyurea on reducing girder displacement becomes more significant.The optimal reinforcement ratio,concrete strength,thickness and range of polyurea coating were also drawn. 展开更多
关键词 Explosive load Explosion resistance performance model test POLYUREA Concrete box girder Numerical simulation
在线阅读 下载PDF
Investigation on the Ice Load on a Cylinder Vertically Breaking through Model Ice Sheet from Underneath
3
作者 ZHAO Wei−hang TIAN Yu−kui +3 位作者 JI Shao−peng GANG Xu−hao YU Chao−ge KONG Shuai 《船舶力学》 北大核心 2025年第6期964-975,共12页
Ice load on underwater vehicles breaking through ice covers from underneath is a significant concern for researchers in polar exploration,and the research on this problem is still in its early stages.Both mechanical e... Ice load on underwater vehicles breaking through ice covers from underneath is a significant concern for researchers in polar exploration,and the research on this problem is still in its early stages.Both mechanical experimental measurement and numerical simulation pose research challenges.This study focuses on the ice load of a cylinder structure breaking upward through the ice sheet form underneath in the Small Ice Model Basin of China Ship Scientific Research Center(CSSRC SIMB).A high-speed camera system was employed to observe the ice sheet failure during the tests,in which,with the loading position as center,local radial cracks and circumferential cracks were generated.A load sensor was used to measure the overall ice load during this process.Meanwhile,a numerical model was developed using LS-DYNA for validation and comparison.With this model,numerical simulation was conducted under various ice thicknesses and upgoing speeds to analyze the instantaneous curves of ice load.The calculation results were statistically analyzed under different working conditions to determine the influence of the factors on the ice load of the cylinder.The study explores the measurement method about ice load of objects vertically breaking through model ice sheet and is expected to provide some fundamental insights into the safety design of underwater structures operating in ice waters. 展开更多
关键词 CYLINDER model test failure mode crack propagation ice load numerical modeling
在线阅读 下载PDF
Model test to investigate failure mechanism and loading characteristics of shallow-bias tunnels with small clear distance 被引量:11
4
作者 雷明锋 林大涌 +3 位作者 杨伟超 施成华 彭立敏 黄娟 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第12期3312-3321,共10页
Based on the similarity theory,a tunnel excavation simulation testing system under typical unsymmetrical loading conditions was established.Using this system,the failure mechanism of surrounding rock of shallow-bias t... Based on the similarity theory,a tunnel excavation simulation testing system under typical unsymmetrical loading conditions was established.Using this system,the failure mechanism of surrounding rock of shallow-bias tunnels with small clear distance was analyzed along with the load characteristics.The results show that:1) The failure process of surrounding rock of shallow-bias tunnels with small clear distance consists of structural and stratum deformation induced by tunnel excavation; Microfracture surfaces are formed in the tunnel surrounding rock and extend deep into the rock mass in a larger density; Tensile cracking occurs in shallow position on the deep-buried side,with shear slip in deep rock mass.In the meantime,rapid deformation and slip take place on the shallow-buried side until the surrounding rocks totally collapse.The production and development of micro-fracture surfaces in the tunnel surrounding rock and tensile cracking in the shallow position on the deep-buried side represent the key stages of failure.2) The final failure mode is featured by an inverted conical fracture with tunnel arch as its top and the slope at tunnel entrance slope as its bottom.The range of failure on the deep-buried side is significantly larger than that on the shallow-buried side.Such difference becomes more prominent with the increasing bias angle.What distinguishes it from the "linear fracture surface" model is that the model proposed has a larger fracture angle on the two sides.Moreover,the bottom of the fracture is located at the springing line of tunnel arch.3) The total vertical load increases with bias angle.Compared with the existing methods,the unsymmetrical loading effect in measurement is more prominent.At last,countermeasures are proposed according to the analysis results: during engineering process,1) The surrounding rock mass on the deep-buried side should be reinforced apart from the tunnel surrounding rock for shallow-buried tunnels with small clear distance; moreover,the scope of consolidation should go beyond the midline of tunnel(along the direction of the top of slope) by 4 excavation spans of single tunnel.2) It is necessary to modify the load value of shallow-bias tunnels with small clear distance. 展开更多
关键词 shallow-bias tunnels with small spacing failure mechanism loading characteristics model test
在线阅读 下载PDF
Water shutoff model test in water-rich sandy stratum by phosphoric acid-water glass grout 被引量:5
5
作者 杨宇友 倪茂光 《Journal of Central South University》 SCIE EI CAS 2014年第10期4014-4020,共7页
The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to b... The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to be more effective in stopping water. Laboratory model test of water shutoff by grouting was conducted. Test results show that the diffusion length and water cutoff effect of the grout are significantly improved as the grout head is raised, due to the dilution of underground water, and it takes the grout longer than its gel time to cut off water. 展开更多
关键词 water-rich sandy stratum phosphoric acid-water glass grout grouting water shutoff model test
在线阅读 下载PDF
Model test on vertical bearing capacity of X-section concrete pile raft foundation in silica sand 被引量:3
6
作者 XU Lai PENG Yu +1 位作者 DING Xuan-ming LIU Jia-yi 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第6期1861-1869,共9页
To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile w... To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile with the same section area.The load−settlement curves,axial force and skin friction,strain on concave and convex edge of the pile,pile-sand stress ratio,distributions of side and tip resistance are presented.The results show that bearing capacity of the X section concrete pile raft foundation is much larger than that of the circular pile raft foundation.Besides,compared with the circular pile,the peak axial force of X-section piles under raft is deeper and smaller while the neutral point of X-section concrete pile is deeper.Moreover,the strain on the concave edge is much larger than that on the convex edge of the pile,and the convex edge has more potential in bearing capacity as the vertical load increases.The X-section pile has higher pile-sand stress ratios and load-sharing between side resistance and tip resistance.Above all,the X-section concrete pile can significantly increase the bearing capacity of pile-raft foundations in silica sand. 展开更多
关键词 X-section pile pile raft foundation model test neutral point pile-soil stress ratio
在线阅读 下载PDF
Factors affecting thin coal seam shearer drum coal-loading performance by a model test method 被引量:2
7
作者 GAO Kui-dong XU Wen-bo +1 位作者 JIANG Shou-bo DU Chang-long 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第6期1619-1636,共18页
To solve the problem of a low coal-loading rate being exhibited by the drum shearer on Chinese thin coal seams,systematic tests and research were performed to study the pivotal factors’influences on drum coal-loading... To solve the problem of a low coal-loading rate being exhibited by the drum shearer on Chinese thin coal seams,systematic tests and research were performed to study the pivotal factors’influences on drum coal-loading rate using a model test method.The effects of the drum hub diameter,cutting depth,vane helix angle,drum rotation speed and hauling speed on drum coal-loading rate were determined under circumstances of coal-loading with drum ejection and pushing modes,and reasons for these phenomena were analyzed.The results indicate that the influence of the drum cutting depth on the drum coal-loading rate is the most significant.The parameters of hub diameter,drum rotation speed and hauling speed can influence the drum coal-loading rate by cutting the coals’filling rate in the drum.The parameters of vane helix angle and drum rotation speed can influence drum coal-loading rates by influencing the ratio of cutting coals’tangential and axial speed in the drum.The coal-loading rate with drum ejection is clearly higher than that observed with drum pushing.Research in this study can provide support to design the drum structure and select drum operational parameters for a thin coal seam shearer. 展开更多
关键词 thin coal seam SHEARER CUTTING DRUM coal-loading rate model test
在线阅读 下载PDF
Centrifugal model test and numerical simulation of vertical earth pressure on soft foundation box culvert 被引量:3
8
作者 张军辉 姚永胜 +1 位作者 郑健龙 张涛 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第9期3556-3563,共8页
To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and... To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and the comparisons with the current methods to determine the load on a culvert were completed. The results of the model test and numerical analysis are in satisfactory agreement, which shows that the direction of the shear stress between the culvert and the adjacent embankment depends on the differential settlement between them. A vertical earth pressure concentration appears on the culvert with a rigid piles foundation because of a downward shear stress. The ratio of the load on a soft foundation culvert and the overburden pressure above the culvert raises first and then decreases as the backfill height increases. In order to reduce the load on a culvert, it is suggested to limit the stiffness difference of the foundations under the culvert and embankment and to use a light backfill over the culvert. 展开更多
关键词 box culvert vertical earth pressure soft foundation centrifugal model test
在线阅读 下载PDF
On modeling approach for embedded real-time software simulation testing 被引量:6
9
作者 Yin Yongfeng Liu Bin Zhong Deming Jiang Tongmin 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2009年第2期420-426,共7页
Modeling technology has been introduced into software testing field. However, how to carry through the testing modeling effectively is still a difficulty. Based on combination of simulation modeling technology and emb... Modeling technology has been introduced into software testing field. However, how to carry through the testing modeling effectively is still a difficulty. Based on combination of simulation modeling technology and embedded real-time software testing method, the process of simulation testing modeling is studied first. And then, the supporting environment of simulation testing modeling is put forward. Furthermore, an approach of embedded real-time software simulation testing modeling including modeling of cross-linked equipments of system under testing (SUT), test case, testing scheduling, and testing system service is brought forward. Finally, the formalized description and execution system of testing models are given, with which we can realize real-time, closed loop, mad automated system testing for embedded real-time software. 展开更多
关键词 embedded real-time software software testing testing modeling SIMULATION
在线阅读 下载PDF
The Research of the Equation Model on the System-level Fault Diagnosis 被引量:5
10
作者 Hengnong Xuan1, Dafang Zhang2, Yue Wu3, Minwei He4 (1,4: Dept. of Computer, Wuyi University, Jiangmen, Guangdong, 529020, China (2: Dept. of Computer, Hunan University, Changsha, 410082, China ) (3: Institute of Computer Science and Engineering, Univers 《湖南大学学报(自然科学版)》 EI CAS CSCD 2000年第S2期148-157,共10页
In this paper we propose an equation model of system-level fault diagnoses, and construct corresponding theory and algorithms. People can turn any PMC model on ex-test into an equivalent equation (or a system of equat... In this paper we propose an equation model of system-level fault diagnoses, and construct corresponding theory and algorithms. People can turn any PMC model on ex-test into an equivalent equation (or a system of equations), and find all consistent fault patterns based on the equation model. We can also find all fault patterns, in which the fault node numbers are less than or equal to t without supposing t-diagnosable. It is not impossible for all graphic models. 展开更多
关键词 PMC model EQUATION model ex-test system-level FAULT diagnosis DIAGNOSTIC algorithm
在线阅读 下载PDF
Model tests on uplift capacity of double-belled pile influenced by distance between bells
11
作者 SUN Tao CUI Xin-zhuang +5 位作者 SUN Yan-feng HAN Ruo-nan MA Rui-jin YANG Jun-jie WANG Yi-lin CHANG Yu-jun 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第5期1630-1640,共11页
To optimize the distance between the bells in pile design,this paper reports a series of small scale tests on the uplift capacity of double belled piles embedded in dry dense sand considering different bell space rati... To optimize the distance between the bells in pile design,this paper reports a series of small scale tests on the uplift capacity of double belled piles embedded in dry dense sand considering different bell space ratios.Finite element modelling is also performed to evaluate the range of soil failure around the piles during pile uplift displacement.Test results show that when bell space ratio is 6 or 8,the uplift capacity reaches the peak value.The upper bell bears more load than the lower one for the piles with bell space ratio less than 6,while the lower bell bears more load than the upper one for the piles with bell space ratio larger than 8. 展开更多
关键词 doubled-belled pile optimized distance uplift bearing capacity model test sand foundation
在线阅读 下载PDF
多功能透明土模型试验系统研制与应用
12
作者 刘汉龙 周航 +1 位作者 陈荣淋 亓戈平 《河海大学学报(自然科学版)》 北大核心 2025年第5期136-146,共11页
为解决岩土与地下工程灾变破坏机理“看不见、摸不着”的核心难题,自主研发了一套高自动化、集成化、可视化的多功能透明土模型试验系统。该系统集成了自动化混合搅拌与真空饱和预压的透明土材料制配功能、采用激光成像与CCD技术的高精... 为解决岩土与地下工程灾变破坏机理“看不见、摸不着”的核心难题,自主研发了一套高自动化、集成化、可视化的多功能透明土模型试验系统。该系统集成了自动化混合搅拌与真空饱和预压的透明土材料制配功能、采用激光成像与CCD技术的高精度图像采集与测试功能以及多功能模块化试验功能。基于该系统,开展了单桩沉贯、条形基础加载、边坡加载与超浅埋大断面隧道开挖等系列模型试验。试验结果清晰揭示了以下关键规律:沉桩过程桩周与桩尖土体扰动范围受土性主导所呈现的规律,条形基础加载下不同埋深处的内部土体位移分布规律,边坡破坏全过程滑动面的演化规律,以及隧道开挖引发的沉降集中带发展与扰动区扩展特征。该试验系统具备不扰动、不介入、全断面、全过程、可视化、数字化等显著优点,可为揭示滑坡、泥石流、隧道塌方、地面塌陷等岩土与地下工程灾变破坏机理及防控提供全新的技术手段。 展开更多
关键词 模型试验系统 透明土 土工试验 岩土灾变破坏机理 结构-土相互作用
在线阅读 下载PDF
大尺度船闸输水系统水力学优化试验研究
13
作者 王蛟 许灿亮 +2 位作者 王召兵 陈亮 蒋友祥 《中国农村水利水电》 北大核心 2025年第4期20-24,30,共6页
随着船闸尺度日益增大,大尺度船闸输水系统要在高输水效率、船舶泊稳条件与工程投资之间找到合理平衡点的难度很大。依托某拟建大尺度船闸,闸室有效尺度为280m×34m×4.5m(长×宽×门槛水深),建立1∶30的船闸输水系统... 随着船闸尺度日益增大,大尺度船闸输水系统要在高输水效率、船舶泊稳条件与工程投资之间找到合理平衡点的难度很大。依托某拟建大尺度船闸,闸室有效尺度为280m×34m×4.5m(长×宽×门槛水深),建立1∶30的船闸输水系统水力学整体物理模型,重点针对闸室消能工进行系列试验研究,对不同消能工布置、阀门开启方式和船舶停泊位置的船舶系缆力进行测定和分析。同时,通过综合分析输水系统水力特性、压力特性和闸室内船舶受力特性,提出了经济合理的输水系统型式。成果表明:消能工直接影响到停泊在闸室内的船舶的安全性和稳定性。对于船闸平面尺度较大的船闸,为了兼顾高输水效率,采用相对复杂的闸室消能工结构是必要的。推荐输水系统布置方案下,闸室船舶系缆力、输水系统水力特性及阀门段压力特性均满足规范及设计要求,且有较大富余,为未来船闸提速提效预留了可操作空间,研究思路及成果可供类似工程参考借鉴。 展开更多
关键词 大尺度船闸 输水系统 模型试验 消能工 船舶受力
在线阅读 下载PDF
中小跨径应急钢混组合梁抗弯及疲劳性能
14
作者 李立峰 黄立炜 +1 位作者 苗建宝 石雄伟 《浙江大学学报(工学版)》 北大核心 2025年第12期2604-2615,共12页
极端灾变导致桥梁损坏频繁发生,为了迅速响应桥梁上部结构损坏后的抢修或更换,确保关键交通线路的即时恢复,提出具有模块化加工、制作和安装特点的新型预制钢-混组合梁应急体系结构,即将钢梁、混凝土桥面板分块并各自制作和储存,钢梁之... 极端灾变导致桥梁损坏频繁发生,为了迅速响应桥梁上部结构损坏后的抢修或更换,确保关键交通线路的即时恢复,提出具有模块化加工、制作和安装特点的新型预制钢-混组合梁应急体系结构,即将钢梁、混凝土桥面板分块并各自制作和储存,钢梁之间、钢梁与桥面板之间、桥面板之间均采用高强螺栓后装式剪切连接器进行连接.为了验证该应急体系的可行性并把握其力学性能,设计并完成了2片1∶2.5缩尺静力模型试验、疲劳模型试验(之后进行静力破坏试验).静力破坏试验结果表明:该应急体系极限荷载远大于承载能力要求,结构刚度满足要求,各预制构件的组合作用和协调工作性能较好,高强螺栓连接件能够有效地约束预制构件的分离,并能较好地传递层间剪力,但当荷载超过1.2倍承载能力组合值后,板件间最大滑移量为1.121mm.综合目前常用的预制装配式组合梁的抗弯承载力计算公式进行对比分析,发现修正塑性法能够较好地预测其承载能力.疲劳试验结果表明,在200万次疲劳加载后,高强螺栓预紧力损失6.65%,整体刚度下降13.7%.以上结果证明该应急钢-混组合梁抢修体系的结构可行性,其性能满足应急抢险要求. 展开更多
关键词 应急抢修体系 预制拼装钢混组合梁 缩尺试验 新型结构 抗弯承载力
在线阅读 下载PDF
引黄济青明渠段输水控制系统的MIL测试系统设计与实现 被引量:2
15
作者 何立新 曹辰宇 +2 位作者 张峥 雷晓辉 李翔 《南水北调与水利科技(中英文)》 北大核心 2025年第1期1-9,58,共10页
针对现有输水工程中闸泵站控制模型测试体系不完善的问题展开探索,旨在进一步提升渠道输水控制模型在不同工况下的准确性和稳定性,以确保输水工程现场的安全与高效运行。将引黄济青工程明渠段作为研究区,将渠道输水控制系统中的控制模... 针对现有输水工程中闸泵站控制模型测试体系不完善的问题展开探索,旨在进一步提升渠道输水控制模型在不同工况下的准确性和稳定性,以确保输水工程现场的安全与高效运行。将引黄济青工程明渠段作为研究区,将渠道输水控制系统中的控制模型作为测试对象,并基于LabVIEW(laboratory virtual instrument engineering workbench)开发系统组态,以水动力模型作为环境仿真模型,搭建模型在环(model-in-the-loop,MIL)测试系统,实现了闭环测试,验证所开发模型在环仿真系统和模型开发阶段对模型进行测试的可行性。本研究为渠道输水工程领域内的控制模型开发与测试工作提供关键的技术支撑,为提升输水工程的运行效率及增强其安全性奠定了坚实的基础。 展开更多
关键词 渠道输水 模型在环(MIL)测试 水动力数值模拟 控制系统 LABVIEW
在线阅读 下载PDF
基于电网演化模型的新型输电网测试系统生成方法 被引量:1
16
作者 黎博 魏光瑞 +1 位作者 钟海旺 刘辉 《电力系统自动化》 北大核心 2025年第10期135-144,共10页
IEEE算例已被广泛用于电力系统规划、运行等领域的仿真测试。然而,受限于数据隐私保护,研究人员难以获取实际电力系统发电与网架结构的公开数据集。为此,提出一种基于三代电网演化模型的新型输电网测试系统生成方法,构建反映实际电力系... IEEE算例已被广泛用于电力系统规划、运行等领域的仿真测试。然而,受限于数据隐私保护,研究人员难以获取实际电力系统发电与网架结构的公开数据集。为此,提出一种基于三代电网演化模型的新型输电网测试系统生成方法,构建反映实际电力系统特征的输电网测试算例。首先,建立基于N-1安全校核的输电网扩展规划模型。然后,针对电网不同发展阶段特征设置相应优化目标与约束条件,以模拟电网的演化历程。为提高模型求解效率,建立输电走廊待建线路的二进制表征方法,以减少模型0-1变量。最后,以某省电网为例,构建开源电力测试系统,并根据复杂网络的统计特性验证所构建算例的有效性。此外,将该算例应用于输电网结构优化中以验证算例的合理性。 展开更多
关键词 输电网 扩展规划模型 测试系统 N-1安全约束 电网演化模型
在线阅读 下载PDF
管片上浮模型试验平台研制 被引量:1
17
作者 王海涛 王悦 孙九春 《隧道建设(中英文)》 北大核心 2025年第1期132-138,共7页
为深入探究盾构施工中管片上浮的关键因素,特别是浆液性质对管片上浮的影响规律,设计管片上浮荷载感知测量结构,自主研发具有可视化特性的管片上浮模型试验平台。通过数值分析和注水测试,验证该试验平台结构的安全性和功能的可实施性,... 为深入探究盾构施工中管片上浮的关键因素,特别是浆液性质对管片上浮的影响规律,设计管片上浮荷载感知测量结构,自主研发具有可视化特性的管片上浮模型试验平台。通过数值分析和注水测试,验证该试验平台结构的安全性和功能的可实施性,得到管片受浮力大小的系统测量误差。试验结果表明:1)注浆过程中管片受上浮荷载的变化与注浆体积呈线性关系,R^(2)值均大于93%,管片平均上浮荷载线性变化率是理论上浮荷载线性变化率的62.6%,与理论计算值相差28.79N/cm。2)浮动密封内油脂对管片上浮存在抑制作用,产生的阻力约为理论上浮荷载的41.1%,实际上浮荷载与理论上浮荷载最大误差约2.1%,能够较为准确地模拟管片上浮的受力情况。3)截面荷载增长率随注浆体积的变化呈现出先减小后增大的趋势,管片的横向位移约束对管片受倾覆荷载产生的姿态偏移具有较好的控制效果。 展开更多
关键词 盾构施工 管片上浮 模型试验平台 注浆 上浮荷载
在线阅读 下载PDF
MW级波浪能装置浅水系泊系统模型试验研究
18
作者 盛其虎 张紫昊 《哈尔滨工程大学学报》 北大核心 2025年第2期189-196,共8页
本文针对MW级波浪能装置浅水系泊系统设计问题,在拖曳水池采用局部假底模拟浅水环境,对比研究纯悬链系泊和弹性系泊系统的力学性能。模型实验结果表明:纯悬链系泊方式在极端海洋环境条件下,系泊张力存在瞬时的尖峰,峰值载荷随平均风浪... 本文针对MW级波浪能装置浅水系泊系统设计问题,在拖曳水池采用局部假底模拟浅水环境,对比研究纯悬链系泊和弹性系泊系统的力学性能。模型实验结果表明:纯悬链系泊方式在极端海洋环境条件下,系泊张力存在瞬时的尖峰,峰值载荷随平均风浪流载荷的增加而增大;弹性系泊模式很好地避免了峰值载荷,极限系泊载荷相比纯悬链方式降低了88%。研究结果表明:在浅水条件下,采用弹性系泊可以有效避免平台运动响应对系泊线的冲击载荷,有助于提高波浪能装置在极端海洋环境条件下的生存能力和降低系泊系统成本。 展开更多
关键词 可再生能源 波浪能发电 系泊系统 模型试验 鹰式波浪能平台 系泊张力 弹性索 台风
在线阅读 下载PDF
岩爆刚度理论研究进展与趋势展望
19
作者 万荣基 肖亚勋 +2 位作者 丰光亮 赵同彬 尹延春 《金属矿山》 北大核心 2025年第9期207-216,共10页
岩爆是世界岩石力学与工程研究的前沿,也是制约我国深部战略实施的安全难题。岩爆防控的重点在于机理研究,而刚度理论是岩爆机理研究的重要内容。通过调研大量岩爆刚度理论研究文献,系统归纳了岩爆刚度理论的发展历程、试验方法与典型... 岩爆是世界岩石力学与工程研究的前沿,也是制约我国深部战略实施的安全难题。岩爆防控的重点在于机理研究,而刚度理论是岩爆机理研究的重要内容。通过调研大量岩爆刚度理论研究文献,系统归纳了岩爆刚度理论的发展历程、试验方法与典型试验结果、爆体—围岩系统模型与岩爆判据。研究表明:①刚度理论源于能量理论,经过丰富发展但仍难单一圆满解释岩爆机理;②刚度试验机演变推动了刚度理论试验由控制岩样刚度向控制试验机刚度转变,岩爆发生的必要条件是试验机刚度低于岩样,且其烈度随着两者刚度差增大而增大;③岩爆刚度系统模型将爆体与围岩视为弹塑性组合体,考虑岩样自身储能能力的系统模型更符合实际;④现有刚度计算方法主要围绕室内岩样和试验机,且基于刚度理论的岩爆判据仍局限于判别岩爆是否发生。通过分析刚度理论研究现有问题,展望了动态变刚度试验、不同等级岩爆的刚度理论判据与基于工程实例的原位岩爆刚度理论研究等进一步研究方向。分析结果可为岩爆刚度理论研究与工程应用提供参考。 展开更多
关键词 岩爆 刚度理论 刚性试验 系统模型 判据
在线阅读 下载PDF
多煤层开采地下水运移试验平台研发及应用 被引量:1
20
作者 吴宝杨 许多 +3 位作者 王伟 刘小庆 张耀斌 王子骋 《中国矿业》 北大核心 2025年第3期253-265,共13页
为进一步完善煤矿地下工程领域模型试验研究手段,明确矿区煤炭开采地下水的运移规律,研发了一套多煤层开采地下水运移综合智能试验平台。平台由主体反力单元、伺服加载单元、回采模拟单元、水体运移单元、信息采集单元等五个关键单元组... 为进一步完善煤矿地下工程领域模型试验研究手段,明确矿区煤炭开采地下水的运移规律,研发了一套多煤层开采地下水运移综合智能试验平台。平台由主体反力单元、伺服加载单元、回采模拟单元、水体运移单元、信息采集单元等五个关键单元组成。通过组合式反力装置,可开展2.1m×1.8m×3.0m(长×高×宽)以内不同尺寸模型体的地质力学模型试验;采用七个伺服电缸实现了分区域主动稳定加载,能够还原地下工程围岩真实应力场分布特征,扩大了有效加载区域;创新性地设计了煤层回采模拟装置以适用于不同厚度、不同进刀长度、不同回采速度的煤层回采模拟;采用荧光示踪剂和大功率紫外线光源显示水体沿裂隙的渗流、运移及存储情况;采用了伺服液压控制系统、高精度土压力盒、分布式光纤等数据实时采集传输系统,实现了数据实时采集,提高了数据采集准确度。以神东矿区上湾煤矿的采掘地质条件为基本背景,进行了现场试验。结果表明:煤层开采过程中,模型巷道围岩变形规律与现场实测基本吻合,围岩变形主要特征基本一致;下层煤柱的距离越大,水平承载力更大,但是破坏过程更剧烈,造成顶底板更大范围破坏,下层煤柱水平承载力极限为0.32MPa,裂隙贯通临界位移为2.5mm;竖向裂隙是贯通煤矿地下水库与上覆含水层的主要通道,也是水源补给的主要路径;顶板岩层横向裂隙成为储水空间,且采空区是主要的储水空间。通过试验验证了系统的可行性与可靠性,较好体现采动条件下模型岩层的裂隙发育、应力变化及地下水运移特征,具有一定工程应用价值,为地下水库建设与长期安全运行提供了科学研究手段。 展开更多
关键词 煤层开采 地下水库 模型试验 水体运移 试验系统研发
在线阅读 下载PDF
上一页 1 2 37 下一页 到第
使用帮助 返回顶部