This research presented a bi-level programming approach to optimize the schedule of ur- ban road construction activities based on a hypothetical transport network, with an objective of mini- mizing the overall traffic...This research presented a bi-level programming approach to optimize the schedule of ur- ban road construction activities based on a hypothetical transport network, with an objective of mini- mizing the overall traffic delays. A heuristic algorithm was utilized to identify a set of road construction schedules, while PARAMICS was adopted to estimate the total travel time in the network under each road construction scenario. To test the performance of proposed heuristics-simulation methodology, a numerical test was implemented. The overall results suggested that the proposed methodol- ogy could quickly find the optimum solution with good convergence.展开更多
基金Supported by the National Natural Science Foundation of China(71131001)
文摘This research presented a bi-level programming approach to optimize the schedule of ur- ban road construction activities based on a hypothetical transport network, with an objective of mini- mizing the overall traffic delays. A heuristic algorithm was utilized to identify a set of road construction schedules, while PARAMICS was adopted to estimate the total travel time in the network under each road construction scenario. To test the performance of proposed heuristics-simulation methodology, a numerical test was implemented. The overall results suggested that the proposed methodol- ogy could quickly find the optimum solution with good convergence.