期刊文献+
共找到26,993篇文章
< 1 2 250 >
每页显示 20 50 100
A Rectifier Bridge Circuit Based on Metal-semiconductor-metal Fin Tunneling Diode for High-frequency Application
1
作者 DENG Hengyang QIN Cuijie +5 位作者 HAO Shenglan FENG Guangdi ZHU Qiuxiang TIAN Bobo CHU Junhao DUAN Chungang 《无机材料学报》 北大核心 2026年第2期253-261,共9页
Tunneling diodes hold significant promise for future rectification in the terahertz(THz)and visible light spectra,thanks to their femtosecond-scale transit-time tunneling capabilities.In this work,TiN/ZnO/Pt fin tunne... Tunneling diodes hold significant promise for future rectification in the terahertz(THz)and visible light spectra,thanks to their femtosecond-scale transit-time tunneling capabilities.In this work,TiN/ZnO/Pt fin tunneling diodes(FTDs)with tunneling distances of 10 and 5 nm are fabricated,which demonstrate remarkable characteristics,including ultrahigh asymmetry(1.6×10^(4)for 10 nm device and 1.6×10^(3) for 5 nm device),high responsivity(25.3 V^(-1) for 10 nm device and 28.3 V^(-1) for 5 nm device)at zero bias,surpassing the thermal voltage limit of conventional Schottky diodes,and low turn-on voltage(V_(on))of approximately 100 mV for both devices,making them ideal for power conversion applications.Using technology computer-aided design(TCAD)simulations,the observed asymmetry in electronic transport is attributed to the transition between Fowler-Nordheim tunneling(FNT)and trap-assisted tunneling(TAT)under different biasing conditions,as illustrated by the corresponding energy band profiles.Furthermore,by integrating the FTDs,a rectifier bridge circuit is designed and exhibits full-wave rectification behavior,validated through SPICE simulations for THz-band operations.This advancement offers a highly efficient solution for THz-band energy conversion and effective detection applications. 展开更多
关键词 fin tunneling diode TCAD simulation rectifier bridge SPICE simulation
在线阅读 下载PDF
Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks 被引量:20
2
作者 闫斌 戴公连 +1 位作者 郭文华 徐庆元 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期2001-2006,共6页
Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete ... Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered. 展开更多
关键词 railroad bridge long-span bridge tied arch continuous beam continuously welded rail track-bridge interaction
在线阅读 下载PDF
Effects of fundamental factors on coupled vibration of wind-rail vehicle-bridge system for long-span cable-stayed bridge 被引量:11
3
作者 张明金 李永乐 汪斌 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第5期1264-1272,共9页
In a wind-vehicle-bridge(WVB) system,there are various interactions among wind,vehicle and bridge.The mechanism for coupling vibration of wind-vehicle-bridge systems is explored to demonstrate the effects of fundament... In a wind-vehicle-bridge(WVB) system,there are various interactions among wind,vehicle and bridge.The mechanism for coupling vibration of wind-vehicle-bridge systems is explored to demonstrate the effects of fundamental factors,such as mean wind,fluctuating wind,buffeting,rail irregularities,light rail vehicle vibration and bridge stiffness.A long cable-stayed bridge which carries light rail traffic is regarded as a numerical example.Firstly,a finite element model is built for the long cable-stayed bridge.The deck can generally be idealized as three-dimensional spine beam while cables are modeled as truss elements.Vehicles are modeled as mass-spring-damper systems.Rail irregularities and wind fluctuation are simulated in time domain by spectrum representation method.Then,aerodynamic loads on vehicle and bridge deck are measured by section model wind tunnel tests.Eight vertical and torsional flutter derivatives of bridge deck are identified by weighting ensemble least-square method.Finally,dynamic responses of the WVB system are analyzed in a series of cases.The results show that the accelerations of the vehicle are excited by the fluctuating wind and the track irregularity to a great extent.The transverse forces of wheel axles mainly depend on the track irregularity.The displacements of the bridge are predominantly determined by the mean wind and restricted by its stiffness.And the accelerations of the bridge are enlarged after adding the fluctuating wind. 展开更多
关键词 wind-vehicle-bridge system coupled vibration long-span cable-stayed bridge fundamental factors
在线阅读 下载PDF
Damage alarming of long-span suspension bridge based on GPS-RTK monitoring 被引量:8
4
作者 缪长青 王蔓 +2 位作者 田洪金 冯兆祥 陈策 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第7期2800-2808,共9页
Structure damage identification and alarming of long-span bridge were conducted with three-dimensional dynamic displacement data collected by GPS subsystem of health monitoring system on Runyang Suspension Bridge.Firs... Structure damage identification and alarming of long-span bridge were conducted with three-dimensional dynamic displacement data collected by GPS subsystem of health monitoring system on Runyang Suspension Bridge.First,the effects of temperature on the main girder spatial position coordinates were analyzed from the transverse,longitudinal and vertical directions of bridge,and the correlation regression models were built between temperature and the position coordinates of main girder in the longitudinal and vertical directions;then the alarming indices of coordinate residuals were conducted,and the mean-value control chart was applied to making statistical pattern identification for abnormal changes of girder dynamic coordinates;and finally,the structural damage alarming method of main girder was established.Analysis results show that temperature has remarkable correlation with position coordinates in the longitudinal and vertical directions of bridge,and has weak correlation with the transverse coordinates.The 3%abnormal change of the longitudinal coordinates and 5%abnormal change of the vertical ones caused by structural damage are respectively identified by the mean-value control chart method based on GPS dynamic monitoring data and hence the structural abnormalities state identification and damage alarming for main girder of long-span suspension bridge can be realized in multiple directions. 展开更多
关键词 long-span suspension bridge damage alarming mean-value control chart GPS displacement temperature correlation
在线阅读 下载PDF
Applicability of small resistance fastener on long-span continuous bridges of high-speed railway 被引量:22
5
作者 戴公连 刘文硕 《Journal of Central South University》 SCIE EI CAS 2013年第5期1426-1433,共8页
Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Bas... Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Based on the HSR long-span continuous bridges, the integrative spatial finite element model of track-bridge-pier-foundation system was established with the nonlinear spring element simulating the longitudinal resistance between track and bridge. Comparative study on the various additional longitudinal forces of CWR using the common fasteners and small resistance fasteners was carried out. Analysis results indicate that the additional expansion forces and additional rail-breaking forces in long-span ballastless continuous girders can be reduced evidently by 40% 50% after adopting small resistance fasteners, but lead to greater rail broken gap. The small resistance fasteners have little influence on the additional force only caused by vertical load, but can reduce the additional force caused by vertical load combined with braking load by over 10%. Besides, transient analysis method is proved to be more accurate and safe in calculating additional longitudinal forces when the train running or braking on the bridge, compared with the traditional static method. 展开更多
关键词 ballastless track small resistance fasteners additional longitudinal force long-span continuous beam high-speed railway
在线阅读 下载PDF
Dynamic analysis and modal test of long-span cable-stayed bridge based on ambient excitation 被引量:3
6
作者 陈常松 颜东煌 《Journal of Central South University of Technology》 EI 2007年第1期135-139,共5页
To study the stiffness distribution of girder and the method to identify modal parameters of cable-stayed bridge, a simplified dynamical finite element method model named three beams model was established for the gird... To study the stiffness distribution of girder and the method to identify modal parameters of cable-stayed bridge, a simplified dynamical finite element method model named three beams model was established for the girder with double ribs. Based on the simplified model four stiffness formulae were deduced according to Hamilton principle. These formulae reflect well the contribution of the flexural, shearing, free torsion and restricted torsion deformation, respectively. An identification method about modal parameters was put forward by combining method of peak value and power spectral density according to modal test under ambient excitation. The dynamic finite element method analysis and modal test were carried out in a long-span concrete cable-stayed bridge. The results show that the errors of frequencies between theoretical analysis and test results are less than 10% mostly, and the most important modal parameters for cable-stayed bridge are determined to be the longitudinal floating mode, the first vertical flexural mode and the first torsional mode, which demonstrate that the method of stiffness distribution for three beams model is accurate and method to identify modal parameters is effective under ambient excitation modal test. 展开更多
关键词 bridge engineering cable-stayed bridge dynamic finite element method ambient excitation modal test
在线阅读 下载PDF
Sensitive factors research for track-bridge interaction of Long-span X-style steel-box arch bridge on high-speed railway 被引量:9
7
作者 刘文硕 戴公连 何旭辉 《Journal of Central South University》 SCIE EI CAS 2013年第11期3314-3323,共10页
X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch b... X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch bridge with a main span of450 m on HSR under construction for example,a new integrative mechanic model of rail-stringer-cross beam-suspenderpier-foundation coupling system was established,adopting the nonlinear spring element simulating the longitudinal resistance between track and bridge.The transmission law of continuous welded rail(CWR)on the X-style arch bridge was researched,and comparative study was carried out to discuss the influence of several sensitive factors,such as the temperature load case,the longitudinal resistance model,the scheme of longitudinal restraint conditions,the introverted inclination of arch rib,the stiffness of pier and abutment and the location of the rail expansion device.Calculating results indicate that the longitudinal resistance has a significant impact upon the longitudinal forces of CWR on this kind of bridge,while the arch rib’s inclination has little effect.Besides,temperature variation of arch ribs and suspenders should be taken into account in the calculation.Selecting the restraint system without longitudinally-fixed bearing and setting the rail expansion devices on both ends are more reasonable. 展开更多
关键词 high-speed railway track-bridge interaction X-style steel-box arch bridge continuous welded rail
在线阅读 下载PDF
Parametric analysis on buffeting performance of a long-span high-speed railway suspension bridge 被引量:6
8
作者 ZHAO Kai-yong WANG Hao +2 位作者 TAO Tian-you GAO Hui WU Tong 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2574-2588,共15页
The buffeting performance of kilometer-level high-speed railway suspension bridges has a great impact on the smooth operation of high-speed trains.To investigate the buffeting performance of the structure significantl... The buffeting performance of kilometer-level high-speed railway suspension bridges has a great impact on the smooth operation of high-speed trains.To investigate the buffeting performance of the structure significantly different from traditional suspension bridges,the first long-span high-speed railway suspension bridge,Wufengshan Yangtze River Bridge(WYRB),is taken as a numerical example to demonstrate the effects of structural parameters and wind field parameters on the buffeting responses.Based on the design information,the spatial finite element model(FEM)of WYRB is established before testing its accuracy.The fluctuating wind fields are simulated via both classical and stochastic wave based spectral representation method(SRM).Finite element method is further taken to analyze the parametric sensitivity on wind induced buffeting responses in time domain.The results show that the vertical displacement is more sensitive to the changing dead load than the lateral and torsional ones.The larger stiffness of the main girder and the lower sag-to-span ratio are both helpful to reduce the buffeting responses.Wind spectrum and coherence function are key influencing factors to the responses so setting proper wind field parameters are essential in the wind-resistant design stage.The analytical results can provide references for wind resistance analysis and selection of structural and fluctuating wind field parameters for similar long-span high-speed railway suspension bridges. 展开更多
关键词 high-speed railway suspension bridge buffeting performance numerical analysis parametric analysis wind field simulation
在线阅读 下载PDF
Time-dependent behavior comparison of long-span concrete arch bridge between prototype and model 被引量:1
9
作者 WANG Yong-bao QIN Peng-ju +2 位作者 LIU Zhi-hua ZHANG Xiao MAO Min 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第5期1565-1577,共13页
Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction seque... Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction sequence and the time-dependent behavior of CABSS,an experimental study of a model bridge was explored.But the measured displacement and stress ratios of arch rib between prototype and model bridge did not subject to linear similarity relation when the time-dependent behavior was considered.So,the three-dimensional finite element models were established,and verified by the measured data.Then,the displacements and stresses of the prototype and model were compared with each other,when the elastic analysis or coupling of temperature and shrinkage,creep effect was considered.Furthermore,a parametric study was studied.The results showed that when the temperature,shrinkage and creep effect of concrete are considered,the finite element analysis results of prototype and model agree well with the measured results.The displacement and stress ratios of prototype and model bridge in construction and bridge completed stage do not present the geometric similarity ratio 7.5 and 1.0,respectively.They are also much influenced by concrete predicting model and variation of temperature. 展开更多
关键词 concrete arch bridge time-dependent behavior finite element model test stiffened skeleton
在线阅读 下载PDF
Fabrication of energetic semiconductor Bridge with high efficiency,accuracy and low cost by 3D direct writing
10
作者 Yongqi Da Jiangtao Zhang +4 位作者 Fuwei Li Yuxuan Zhou Jianbing Xu Yinghua Ye Ruiqi Shen 《Defence Technology(防务技术)》 2025年第8期69-82,共14页
Enhancing the output capacity of semiconductor bridge(SCB) through the application of composite nano-energetic films is a subject of wide concern. Furthermore, improving the safety, reliability, and production efficie... Enhancing the output capacity of semiconductor bridge(SCB) through the application of composite nano-energetic films is a subject of wide concern. Furthermore, improving the safety, reliability, and production efficiency of energetic semiconductor bridge(ESCB) is the primary focus for large-scale engineering applications in the future. Here, the Al/CuO nano-film ESCB was efficiently fabricated using 3D direct writing. The electrostatic safety of the film is enhanced by precisely adjusting the particle size of Al, while ensuring that the SCB can initiate the film with small energy. The burst characteristics of SCB/ESCB were thoroughly investigated by employing a 100 μF tantalum capacitor to induce SCB and ESCB under an intense voltage gradient. The solid-state heating process of both SCB and ESCB was analyzed with multi physical simulation(MPS). The experimental results demonstrate that the critical burst time of both SCB and ESCB decreases with increasing voltage. Under the same voltage, the critical burst time of ESCB is longer than that of SCB, primarily due to differences in the melting to vaporization stage. The MPS results indicate that the highest temperature is observed at the V-shaped corner of SCB. Due to the thermal contact resistance between SCB and the film, heat conduction becomes more concentrated in the central region of the bridge, resulting in a faster solid-state heating process for ESCB compared to SCB.The results of the gap ignition experiments indicate that at a 19 mm gap, an ESCB with a film mass of 10 mg can ignite nickel hydrazine nitrate(NHN) and cyclotrimethylenetrinitramine(RDX). This suggests that thermite ESCB can serve as a novel, safe, and reliable energy exchange element and initiator in largescale engineering applications. 展开更多
关键词 Semiconductor bridge Al/CuO film Multi physical simulation(MPS) Electrostatic safety Gap ignition
在线阅读 下载PDF
Effects of horizontal splitter plates on the vortex-induced vibration and aerostatic characteristics of twin separated parallel decks for a rail-cum-road bridge
11
作者 HE Xu-hui YANG Jia-feng +2 位作者 LIU Lu-lu ZOU Yun-feng HE Jing 《Journal of Central South University》 2025年第3期1024-1043,共20页
Installing the splitter plates is a passive aerodynamic solution for eliminating vortex-induced vibration (VIV). However, the influences of splitter plates on the VIV and aerostatic performances are more complicated d... Installing the splitter plates is a passive aerodynamic solution for eliminating vortex-induced vibration (VIV). However, the influences of splitter plates on the VIV and aerostatic performances are more complicated due to aerodynamic interference between highway and railway decks. To study the effects of splitter plates, wind tunnel experiments for measuring VIV and aerostatic forces of twin decks under two opposite flow directions were conducted, while the surrounding flow and wind pressure of static twin decks with and without splitter plates are numerically simulated. The results showed that the incoming flow direction affects the VIV response and aerostatic coefficients. The highway deck has poor vertical and torsional VIV, and the VIV region and amplitude are different under different directions. While the railway deck only has vertical VIV when located upstream. The splitter plates can impede the process of vortex generation, shedding and impinging at the gap between twin deck, and significantly reducing the surface fluctuating pressure coefficient, thus effectively suppressing the VIV of twin decks. While, the splitter plates hurt the upstream deck regarding static wind stability and have little effect on the downstream deck. The splitter plates of appropriate width are recommended to improve VIV performances in twin parallel bridges. 展开更多
关键词 splitter plates vortex-induced vibration(VIV) aerostatic characteristic wind tunnel test twin parallel decks the rail-cum-road bridges computational fluid dynamics
在线阅读 下载PDF
JDBC-ODBC Bridge实现C/S数据库访问 被引量:6
12
作者 吕方 唐宁九 +1 位作者 袁敏 何先波 《计算机应用研究》 CSCD 北大核心 2001年第6期142-143,共2页
主要介绍了在Java程序设计中利用JDBC-ODBC桥访问服务器端的数据库,并通过Socket建立流传送通路在服务器和客户机之间传送数据信息,从而实现C/S(客户机/服务器)数据库的访问。
关键词 数据库 JDBC-ODBC桥 客户/服务器 应用程序
在线阅读 下载PDF
域间SDN互联技术WE-Bridge及其实验床的研究进展 被引量:4
13
作者 毕军 《电信科学》 北大核心 2014年第8期28-32,46,共6页
在讨论SDN管控域间互联发展的3个阶段的基础上,介绍了清华大学提出的一种协作式的域间SDN互联技术WE-Bridge,然后介绍了基于WE-Bridge技术构建的跨洲际的域间SDN实验床。
关键词 软件定义网络 域间SDN WE-bridge
在线阅读 下载PDF
龙芯2号配套PCI Bridge的功能覆盖率验证 被引量:3
14
作者 王赵君 沈海华 《计算机工程》 EI CAS CSCD 北大核心 2006年第11期277-279,共3页
介绍了龙芯2号配套北桥中PCI Bridge的功能验证系统以及功能覆盖率建模和分析方法。该系统和方法在开发和验证PCI Bridge模块过程中发挥了重要作用,加快了PCI Bridge的开发速度,协助发现了一些设计与规范不相符合的地方,对后期流片成功... 介绍了龙芯2号配套北桥中PCI Bridge的功能验证系统以及功能覆盖率建模和分析方法。该系统和方法在开发和验证PCI Bridge模块过程中发挥了重要作用,加快了PCI Bridge的开发速度,协助发现了一些设计与规范不相符合的地方,对后期流片成功提供了有效保证。描述的功能覆盖率建模和分析方法具有一定通用性,可以为其它相似系统的验证提供借鉴。 展开更多
关键词 覆盖率分析 PCI bridge 功能验证 龙芯2号
在线阅读 下载PDF
BRIDGE——高性能分子及晶体结构实体造型系统
15
作者 沈今川 《地学前缘》 EI CAS CSCD 1998年第1期157-161,共5页
在计算机硬件、软件技术高速发展的基础上,笔者用QBASIC语言成功地开发出一种在普通486以上微机上运行的,高效、准确、直观地显示各种分子及晶体结构的高性能的实体造型系统,可以较好地满足材料科学及矿物学等各领域的迫切... 在计算机硬件、软件技术高速发展的基础上,笔者用QBASIC语言成功地开发出一种在普通486以上微机上运行的,高效、准确、直观地显示各种分子及晶体结构的高性能的实体造型系统,可以较好地满足材料科学及矿物学等各领域的迫切需要。输入数据简单,界面友好,操作简便,功能十分丰富。可以自由地选择颜色、光照、材质和结构表达方式等多种参数。应用此系统已制作出上千幅精美的晶体结构的高分辨率真彩色实体图片,有非常显著的效果和巨大的应用推广价值。 展开更多
关键词 晶体结构 实体造型 计算机 图形软件 矿物 分子
在线阅读 下载PDF
Crack stop holes in steel bridge decks:Drilling method and effects 被引量:20
16
作者 FU Zhong-qiu JI Bo-hai +1 位作者 XIE Shu-hui LIU Tian-jia 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第10期2372-2381,共10页
Force analysis using a compact tension model, as recommended by ASTM, was carried out on a crack stop hole. The stress before, and after, drilling the hole was compared in terms of stress concentration and stress grad... Force analysis using a compact tension model, as recommended by ASTM, was carried out on a crack stop hole. The stress before, and after, drilling the hole was compared in terms of stress concentration and stress gradient. The optimum drilling location and diameter were studied through analysis of different locations and diameters. By analyzing the effects of flank holes and an additional hole, drilling advice was proposed and fatigue testing of the cracks in a steel bridge deck with a crack stop hole was conducted. The results show that the stress at the crack tip with a crack stop hole decreased, and the major principal stress around the hole was distributed accordingly. The optimum position of the crack stop hole centre was where the centre of the crack stop hole was situated behind the crack and the hole edge coincided with the crack tip. Therefore, hole diameters larger than 8 mm, or those weakening the section by 10%, were suggested as the best diameters. In terms of multi-hole crack stopping, a flank hole was not recommended. The optimum horizontal position of flank holes was at a distance of 1/4 of a single hole diameter from, and in front of, the single hole. Besides, the experiment showed that crack stop hole could only prevent cracks from growing and had no influence on crack growth rate. 展开更多
关键词 steel bridge DECK fatigue CRACK STOP HOLE DRILLING method HOLE position
在线阅读 下载PDF
A simple analytical solution for predicting deflection of a hybrid FRP-aluminum modular space truss bridge 被引量:3
17
作者 李飞 张冬冬 +1 位作者 赵启林 邓安仲 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第11期4414-4425,共12页
A novel hybrid FRP-aluminum space truss was employed in a two-rut modular bridge superstructure, which is composed of standard structural units. The main objective of this work was to obtain a simple analytical soluti... A novel hybrid FRP-aluminum space truss was employed in a two-rut modular bridge superstructure, which is composed of standard structural units. The main objective of this work was to obtain a simple analytical solution that can conveniently predict the deflection of the proposed hybrid space truss bridge. The analytical formulae are expected to possess a straightforward format and simple calculation process. A simple description of the proposed bridge was introduced. The design formulae of the deflection were derived based on a simplified analytical plane truss model, which possessed hinge nodes and was subsequently simplified as two solid web beams during the theoretical derivation process. To validate the analytical model and formulae, numerical and experimental works were conducted and compared with the theoretical solutions. The results indicate that the analytical formulae provide higher deflection magnitudes with a difference of <1.5% compared with the experiments performed and <4.5% compared with the FE model used; the simplified plane truss is thus shown to be an effective analytical model for the derivation of deflection design formulae, which can conveniently calculate the deflection of the hybrid space truss bridge with satisfactory accuracy. 展开更多
关键词 space TRUSS bridge fiber reinforced polymer(FRP) d
在线阅读 下载PDF
Determination of reasonable finished state of self-anchored suspension bridges 被引量:8
18
作者 李建慧 冯东明 +1 位作者 李爱群 袁辉辉 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第1期209-219,共11页
A systematic and generic procedure for the determination of the reasonable finished state of self-anchored suspension bridges is proposed, the realization of which is mainly through adjustment of the hanger tensions. ... A systematic and generic procedure for the determination of the reasonable finished state of self-anchored suspension bridges is proposed, the realization of which is mainly through adjustment of the hanger tensions. The initial hanger tensions are first obtained through an iterative analysis by combining the girder-tower-only finite element(FE) model with the analytical program for shape finding of the spatial cable system. These initial hanger tensions, together with the corresponding cable coordinates and internal forces, are then included into the FE model of the total bridge system, the nonlinear analysis of which involves the optimization technique. Calculations are repeated until the optimization algorithm converges to the most optimal hanger tensions(i.e. the desired reasonable finished bridge state). The "temperature rigid arm" is introduced to offset the unavoidable initial deformations of the girder and tower, which are due to the huge axial forces originated from the main cable. Moreover, by changing the stiffness coefficient K in the girder-tower-only FE model, the stiffness proportion of the main girder, the tower or the cable subsystem in the whole structural system could be adjusted according to the design intentions. The effectiveness of the proposed method is examined and demonstrated by one simple tutorial example and one self-anchored suspension bridge. 展开更多
关键词 self-anchored suspension bridge reasonable finished bridge state optimization algorithm finite element nonlinear relation
在线阅读 下载PDF
Memristor bridge-based low pass filter for image processing 被引量:5
19
作者 YU Yongbin YANG Nijing +1 位作者 YANG Chenyu NYIMA Tashi 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2019年第3期448-455,共8页
This paper highlights the memristor bridge-based lowpass filter (LPF) and improved image processing algorithms along with a novel adaptive Gaussian filter for denoising image and a new Gaussian pyramid for scale invar... This paper highlights the memristor bridge-based lowpass filter (LPF) and improved image processing algorithms along with a novel adaptive Gaussian filter for denoising image and a new Gaussian pyramid for scale invariant feature transform (SIFT). First, a novel kind of LPF based on the memristor bridge is designed, whose cut-off frequency and other traits are demonstrated to change with different time and memristance. In light of the changeable parameter of the memristor bridge-based LPF, a new adaptive Gaussian filter and an improved SIFT algorithm are presented. Finally, experiment results show that the peak signalto- noise ratio (PSNR) of our denoising is bettered more than 2.77 dB compared to the corresponding of the traditional Gaussian filter, and our improved SIFT performances including the number of matched feature points and the percent of correct matches are higher than the traditional SIFT, which verifies feasibility and effectiveness of our algorithm. 展开更多
关键词 MEMRISTOR bridge LOW-PASS FILTER (LPF) adaptive GAUSSIAN FILTER image denoising GAUSSIAN pyramid
在线阅读 下载PDF
Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges 被引量:33
20
作者 戴公连 闫斌 《Journal of Central South University》 SCIE EI CAS 2012年第8期2348-2353,共6页
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini... A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment. 展开更多
关键词 high-speed railway continuously welded track cable-stayed bridge simply-supported beam
在线阅读 下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部