期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Hydraulic calculation of gravity transportation pipeline system for backfill slurry 被引量:14
1
作者 张钦礼 胡冠宇 王新民 《Journal of Central South University of Technology》 EI 2008年第5期645-649,共5页
Taking cemented coal gangue pipeline transportation system in Suncun Coal Mine, Xinwen Mining Group, Shandong Province, China, as an example, the hydraulic calculation approaches and process about gravity pipeline tra... Taking cemented coal gangue pipeline transportation system in Suncun Coal Mine, Xinwen Mining Group, Shandong Province, China, as an example, the hydraulic calculation approaches and process about gravity pipeline transportation of backfill slurry were investigated. The results show that the backfill capability of the backfill system should be higher than 74.4 m3/h according to the mining production and backfill times in the mine; the minimum velocity (critical velocity) and practical working velocity of the backfill slurry are 1.44 and 3.82 m/s, respectively. Various formulae give the maximum ratio of total length to vertical height of pipeline (L/H ratio) of the backfill system of 5.4, and then the reliability and capability of the system can be evaluated. 展开更多
关键词 hydraulic calculation critical velocity working velocity pipe length-backfill depth ratio backfill capability
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部