期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Application of fuzzy analytic hierarchy process and neural network in power transformer risk assessment 被引量:8
1
作者 李卫国 俞乾 罗日成 《Journal of Central South University》 SCIE EI CAS 2012年第4期982-987,共6页
In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(... In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions. 展开更多
关键词 fuzzy analytic hierarchy process risk assessment power transformer artificial neutral network
在线阅读 下载PDF
Evaluating the conceptual design schemes of complex products based on FAHP using fuzzy number 被引量:1
2
作者 周凯波 冯珊 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2005年第3期574-578,共5页
In the conceptual design stage of complex products, CBR(Case-Based Reasoning) tool is useful to offer a feasible set of schemes. Then the most adaptive scheme can be generated through a procedure of comparison and e... In the conceptual design stage of complex products, CBR(Case-Based Reasoning) tool is useful to offer a feasible set of schemes. Then the most adaptive scheme can be generated through a procedure of comparison and evaluation. The procedure is essentially a multiple criteria decision-making problem. The traditional multiple criteria programming is not flexible enough in executing the system evaluation algorithm due to both the limited experimental data and the lack of human experiences. To make the CBR tool to be more efficient, a new method for the best choice among the feasible schemes based on the Fuzzy AHP using Fuzzy numbers (FFAHP) is proposed. Since the final results become a problem of ranking the mean of fuzzy numbers by the optimism of decision-maker using the FFAHP, its execution is much more intuitive and effective than with the traditional method. 展开更多
关键词 complex products conceptual design fuzzy analytic hierarchy process fuzzy number.
在线阅读 下载PDF
基于FAHP-TOPSIS法的地下空间开发地质适宜性评价
3
作者 李浩民 瞿婧晶 张其琪 《科学技术与工程》 2025年第30期13187-13196,共10页
为了客观评价地下空间开发地质适宜性并为评价工作提供一种新思路和参考,提出了一种基于三角模糊数的模糊层次分析法(fuzzy analytic hierarchy process based on triangular fuzzy numbers,FAHP)和优劣解距离法(technique for order pr... 为了客观评价地下空间开发地质适宜性并为评价工作提供一种新思路和参考,提出了一种基于三角模糊数的模糊层次分析法(fuzzy analytic hierarchy process based on triangular fuzzy numbers,FAHP)和优劣解距离法(technique for order preference by similarity to ideal solution,TOPSIS)相结合的评价方法。通过地质调查研究构建基于土体工程地质性质、水文地质条件、不良地质作用、地形地貌等影响因素为主的层次分析关系模型。基于专家判别利用FAHP计算各评价因素的权重,以各评价指标层的分级临界值作为典型评价样本,利用TOPSIS法对适宜性等级进行非等分划分,基于区间值优化的TOPSIS法建立最终评价模型,通过ArcGIS的空间分析功能等确定每个评价单元适宜性等级。该方法与传统方法相比一定程度上减少了评价过程中专家评判的过多主观影响,评价过程更倾向于定量化,结果更为客观。利用该方法对无锡市区浅层地下空间开发地质适宜性进行评价,评价结果与实际工程经验相符,证明了该方法的有效性,因此该方法对地下空间开发适宜性评价工作具有一定借鉴意义。 展开更多
关键词 FAHP(fuzzy analytic hierarchy process) TOPSIS(technique for order preference by similarity to an ideal solution) 城市地下空间 地质适宜性评价
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部