期刊文献+
共找到4,384篇文章
< 1 2 220 >
每页显示 20 50 100
Suitable retention and recovery technology of floor coal at ends of fully mechanized face with great mining heights 被引量:3
1
作者 Zhang Nenghu Wu Qi +1 位作者 YuanYong Bai Qingsheng 《Mining Science and Technology》 EI CAS 2011年第2期281-285,共5页
Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss o... Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss of coal.In order to improve coal recovery rates and to ensure efficiency of equipment at coal mining faces,we investigated suitable retention methods and recovery technology of floor coal at face ends.The upper floor coal can directly be recovered by a shearer with floor dinting.The lower floor coal is recovered by shearer with floor dinting after advanced floor dinting and retaining a step for protecting coal sides in a haulage gateway.Field practice shows that this method can improve the coal recovery rates at fully mechanized working faces with great mining heights. 展开更多
关键词 great mining heights Floor coal at face ends Floor coal recovery Floor dinting Step for protecting coal side
在线阅读 下载PDF
Effect of suppressing dust by multi-direction whirling air curtain on fully mechanized mining face 被引量:6
2
作者 Nie Wen Liu Yanghao +3 位作者 Wei Wenle Hu Xiangming Ma Xiao Peng Huitian 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期629-635,共7页
A combined method of numerical simulation and field testing was adopted in this study in the interest of solving the problem of hard to control high concentrate dusts on a fully mechanized mining face. In addi- tion, ... A combined method of numerical simulation and field testing was adopted in this study in the interest of solving the problem of hard to control high concentrate dusts on a fully mechanized mining face. In addi- tion, the dust suppression effect of a multi-direction whirling air curtain was studied in this paper. Under the influence of the wall attachment effect, the compressed air which blows out from the two-phase or three-phase radial outlets on the generator of the air curtain can form a multi-direction whirling air curtain, which can cover the whole roadway section of a fully mechanized mining face. The traditional method of controlling dust is a forcing system with exhaust overlap which has the major disadvantage of lacking a jet effect and consequently results in poor dust control. It is difficult to form the air flow field within the range of Lp ≤ 5√S. However, due to the effect of this novel system, the radial airflow can be turned into axial airflow allowing fresh air to flow through the length of the heading. The air flow field which is good at controlling dust diffusion can be formed 12.8 m from the heading face. Furthermore, the field measurement results show that before the application of a multi-direction whirling air curtain, the dust concentration is 348.6 mg/m^3 and 271.4 mg/m^3 respectively at the roadway cross-section measurement points which are 5 m and 10 m from the heading face. However, after the application of the multi-direction whirling air curtain, the dust concentration is only 61.2 mg/m3 and 14.8 mg/m^3, respectively. Therefore, the dust control effect of a multi-direction whirling air curtain is obvious. 展开更多
关键词 fully mechanized mining face Compressed air Multi-directional whirling air curtain AirflowDust suppression
在线阅读 下载PDF
Fracture mechanics model of fully mechanized top coal caving of shallow coal seams and its application 被引量:6
3
作者 Zhang Jiangong Miao Xiexing +1 位作者 Huang Yanli Li Meng 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期349-352,共4页
Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using ... Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using the fracture mechanics theory. The relationships between the fracture length of the roof and the working resistance of the supports were discovered, and the correlations between the load on the overlying strata and the ratio of the crack's length to the thickness of the roof were obtained. Using a working face of Jindi Coal Mine, Xing county Shanxi province as an example, the relationships between the fracture length of the roof and the working resistance of the supports were analysed in detail. The results give a design basis in hydraulic top coal caving supports, which could provide useful references in the practical application. On-site experiment proves that the periodic weighting step interval of the caving face is 15–16 m, which is basically consistent with the theoretical analysis results, and indicates that the mechanized caving hydraulic support is capable of meeting the support requirements in the mining of a super-thick but shallowly buried coal seam. 展开更多
关键词 Super-thick shallow coal seam fully mechanized top-caving mining Main roof Fracture mechanics model0
在线阅读 下载PDF
Vertical transportation system of solid material for backfilling coal mining technology 被引量:8
4
作者 Ju Feng Zhang Jixiong,Zhang Qiang 《International Journal of Mining Science and Technology》 2012年第1期41-45,共5页
For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertica... For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertical transportation system to transport this type of solid backfill material. Given the demands imposed on safely in feeding this material, we also investigated the structure and basic parameter of this system. For a mine in the Xingtai mining area the results show that: (1) a vertical transportation system should include three main parts, i.e., a feeding borehole, a maintenance chamber and a storage silo; (2) we determined that 486 mm is a suitable diameter for bore holes, the diameter of the storage silo is 6 m and its height 30 m in this vertical transportation system; (3) a conical buffer was developed to absorb the impact during the feeding process. To ensure normal implementation of fully mechanized backfilling coal mining technology and the safety of underground personnel, we propose a series of security technologies for anti-blockage, storage silo cleaning, high pressure air release and aspiration. This vertical transporting system has been applied in one this particular mine, which has fed about 4 million tons solid material with a feeding depth of 350 m and safely exploited 3 million tons of coal. 展开更多
关键词 fully mechanized backfilling coal mining Feeding bore hole Conical buffer Security guarantee
在线阅读 下载PDF
Application of deep borehole blasting on fully mechanized hard top-coal pre-splitting and gas extraction in the special thick seam 被引量:3
5
作者 Liu Jian Liu Zegong +2 位作者 Xue Junhua Gao Kui Zhou Wei 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第5期755-760,共6页
In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas... In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas pre-draining technologies on top coal.The mechanism of the technologies was systematically expounded based on hard top-coal cracks development obtained by numerical simulation and theoretical analysis.The results show that explosive blasting in the hard rock results in a large number of cracks and large displacement in the rock mass due to the effect of explosion stress.Meanwhile,the thick top-coal caves,and desorbing gas flows along the cracks improve gas extraction.Finally,the pre-splitting for deep borehole blasting and gas pre-draining technologies was applied in No.3802 working face of Shui Liandong Coal Mine,which increases monthly output in the face to 67.34 kt and the drained gas concentration to 86.2%.The drained gas average concentration from each borehole reaches 40%,and the effect is remarkable. 展开更多
关键词 Deep borehole blasting fully mechanized mining Hard thick coal seam Top-coal pre-splitting Gas extraction
在线阅读 下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
6
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining fully mechanized caving face Roof control Support resistance
在线阅读 下载PDF
基于运动姿态感知的综放支架主动控顶空间研究
7
作者 曾庆良 雷小万 +3 位作者 孟昭胜 万丽荣 班新亮 胡雨龙 《煤炭学报》 北大核心 2025年第1期645-660,共16页
综放支架是综放采场关键支护与主动放煤装置,其主动触支顶煤行为可有效引导顶煤智能有序破碎。为开展支架主动扰控顶煤理论及相关研究,明确综放支架对顶煤的主动触支工作空间,提出一种综放支架各部件相对空间姿态及绝对空间位姿动态感... 综放支架是综放采场关键支护与主动放煤装置,其主动触支顶煤行为可有效引导顶煤智能有序破碎。为开展支架主动扰控顶煤理论及相关研究,明确综放支架对顶煤的主动触支工作空间,提出一种综放支架各部件相对空间姿态及绝对空间位姿动态感知方法,以期提升综放支架对顶煤碎放过程可控性。首先,借助Denavit-Hartenberg(D-H)方法建立了综放支架空间姿态数学模型,分析得到支架顶梁和放煤机构在各关节节点坐标系与本体坐标系下坐标,明确了综放支架各关键部件之间的相对姿态及运动耦合关系;在此基础上建立了综放工作面全局感知模型并求解得到了支架的绝对空间位姿数据,获得了工作面顶板、底板倾角对综放支架空间支护姿态影响。其次,提出并计算了综放支架顶梁触支空间和放煤机构支护空间分布模型,获得了综放支架对顶煤的主动调控范围,同时使用初值优选的Levenberg-Marquardt(L-M)优化算法探究支架主动触顶姿态的调控方法与立柱的有效驱动行程。最后,搭建了支架姿态数据采集系统,依托山东省菏泽市赵楼煤矿7303综放工作面获取了支架运动过程中真实空间姿态参数数据,对比理论解算数据与传感器实测数据,验证了该空间位姿测量方法的可行性与准确性。结果表明,使用该方法解算的顶梁姿态与传感器测量结果重合率达98.26%,为进一步提高支架的空间位姿感知技术提供了研究思路。 展开更多
关键词 智能综放开采 综放支架 触支空间 顶煤调控 触顶姿态
在线阅读 下载PDF
膏体与固体协同综采充填技术研究
8
作者 孙晓光 周华强 赵磊 《山东煤炭科技》 2025年第1期173-177,共5页
针对综采膏体充填存在的产能低、材料成本高、固废处理量少等问题,通过理论分析、实验室模拟和现场试验,提出膏体与固体协同综采充填技术。地面或井下的矸石等松散固废经过运矸系统进入充填支架顶梁下方悬挂的带式输送机,再通过带式输... 针对综采膏体充填存在的产能低、材料成本高、固废处理量少等问题,通过理论分析、实验室模拟和现场试验,提出膏体与固体协同综采充填技术。地面或井下的矸石等松散固废经过运矸系统进入充填支架顶梁下方悬挂的带式输送机,再通过带式输送机中部犁式卸料器、溜槽和充填支架隔离板上的溜矸孔与充填管道内的膏体同时充入待充填区,膏体与固体物料混合形成新的胶结充填体,用于充填采空区及支撑顶板。该研究证实了膏体与固体协同综采充填方法的可行性,该技术具有材料成本低、漏浆风险小、隔离效率高、充填时间短、固废破碎成本低、固废处理量大、可实现矸石不升井等优势。 展开更多
关键词 综采膏体充填 综采固体充填 膏体固体协同综采充填 矸石不升井
在线阅读 下载PDF
综放开采下煤层底板采动破坏深度预测
9
作者 薛冰 鲁海峰 《煤炭技术》 CAS 2025年第1期7-10,共4页
以淮南顾北煤矿12121工作面为工程研究背景,收集了22个综放工作面地质资料和底板破坏深度实测值,通过线性回归分析建立新的预测模型,得出了底板采动破坏深度的拟合公式,准确计算出底板采动破坏的深度,并将计算值及3个传统统计公式计算... 以淮南顾北煤矿12121工作面为工程研究背景,收集了22个综放工作面地质资料和底板破坏深度实测值,通过线性回归分析建立新的预测模型,得出了底板采动破坏深度的拟合公式,准确计算出底板采动破坏的深度,并将计算值及3个传统统计公式计算结果与现场实测值进行对比分析,得出新预测模型拟合公式比传统统计公式预测精度更高、误差更小,更接近实测值,基本可以满足现场需要。研究成果对淮南矿区煤层综放开采水害防治具有较高的实用价值,为类似工作面的水害防治提供更为科学的依据。 展开更多
关键词 综放开采 底板突水 拟合公式 底板采动破坏深度
在线阅读 下载PDF
汇能集团智能化综采工作面建设创新及实践
10
作者 张存良 江松 饶彬舰 《陕西煤炭》 2025年第2期133-137,168,共6页
煤矿智能化建设是实现煤炭企业转型升级和高质量发展的核心技术支撑,也是实现企业减人增效的重要途径。针对汇能集团智能化建设存在的问题,在管理模式和技术创新方面总结了企业在智能化建设过程中的经验。以宝平湾煤矿4115工作面智能化... 煤矿智能化建设是实现煤炭企业转型升级和高质量发展的核心技术支撑,也是实现企业减人增效的重要途径。针对汇能集团智能化建设存在的问题,在管理模式和技术创新方面总结了企业在智能化建设过程中的经验。以宝平湾煤矿4115工作面智能化建设为例,针对周期性来压大,顶板破碎、片帮等问题,通过智能化跟机技术、液压支架姿态监测、液压支架护帮板防撞和智能控制等关键技术进行创新,最终实现了工作面3人常态化生产,设备自动化开机率大于95%,实现了安全高效生产,可为相似地质条件下的工作面智能化建设提供一定参考。 展开更多
关键词 煤矿智能化 综采工作面 技术创新 开采管理
在线阅读 下载PDF
煤矿综合机械化采煤技术的发展
11
作者 赵怀东 《能源与节能》 2025年第2期176-178,共3页
对煤矿综合机械化采煤技术的发展现状和未来趋势进行了分析。首先,概述了综合机械化采煤技术的定义和重要性;然后,分析了综合机械化采煤技术的发展现状,包括常见的长壁、短壁、薄煤层和无煤柱综合机械化采煤技术;最后,探讨了综合机械化... 对煤矿综合机械化采煤技术的发展现状和未来趋势进行了分析。首先,概述了综合机械化采煤技术的定义和重要性;然后,分析了综合机械化采煤技术的发展现状,包括常见的长壁、短壁、薄煤层和无煤柱综合机械化采煤技术;最后,探讨了综合机械化采煤技术未来的发展方向,包括对元部件的研发、自动控制技术的应用、复杂地质环境的研究、矿山生态环境的保护、综合机械系统的集成和大数据的应用等。 展开更多
关键词 综合机械化采煤技术 自动控制技术 大数据
在线阅读 下载PDF
基于实测数据的建庄煤矿地应力分布规律与影响因素研究
12
作者 张军明 张文 +3 位作者 马壮 阮杰 杨子凡 陈伟 《煤炭技术》 2025年第4期27-32,共6页
采用应力解除法完成了4个测点原岩地应力测量,对建庄煤矿地应力分布规律进行了系统研究,并对其影响因素进行了分析。主要研究结果表明:建庄煤矿属于以水平构造应力为主导的σ_(H)>σ_(v)>σ_(h)型地应力场,对巷道两帮的稳定性影... 采用应力解除法完成了4个测点原岩地应力测量,对建庄煤矿地应力分布规律进行了系统研究,并对其影响因素进行了分析。主要研究结果表明:建庄煤矿属于以水平构造应力为主导的σ_(H)>σ_(v)>σ_(h)型地应力场,对巷道两帮的稳定性影响较大;最大水平应力方向基本呈南北走向,σ_(H)与σ_(v)比值为1.22~1.28,以水平构造应力为主,垂直应力同样作用明显,σ_(H)/σ_(h)较大,水平应力对巷道顶、底板的影响具有明显的方向性;地应力主要影响因素为埋深、岩性和断层,主应力值随埋深的增加而增大,侧压力系数随埋深的增加而减小,主应力值与弹性模量呈正相关性,在断层扰动下,地应力方向发生明显偏转。研究成果为建庄煤矿后续矿井布置及安全开采具有重要的参考价值。 展开更多
关键词 建庄煤矿 综放工作面 地应力分布 应力解除法 影响因素
在线阅读 下载PDF
基于可编程逻辑控制器的煤矿综采组合开关结构设计
13
作者 张云飞 《电子设计工程》 2025年第1期66-69,共4页
针对有效、统一控制煤矿综采工作面多种采煤设备为目的,设计基于可编程逻辑控制器的煤矿综采工作面配套组合开关结构。该开关结构分为主控制电路、次控制电路,两种电路均与液晶显示模块相连。通过液晶显示模块的界面将电路状态反馈给管... 针对有效、统一控制煤矿综采工作面多种采煤设备为目的,设计基于可编程逻辑控制器的煤矿综采工作面配套组合开关结构。该开关结构分为主控制电路、次控制电路,两种电路均与液晶显示模块相连。通过液晶显示模块的界面将电路状态反馈给管理人员,两种控制电路主要通过可编程逻辑控制器和继电器、信号提醒、保护回路相连,分别完成电源供应、警报信息提醒、采煤设备连接状态管理。实验结果表明,在过载、漏电工况中可用电气互锁的方式保证采煤机状态不出现异常变化,完成异常采煤设备的统一管理,最高节能比例达到11.2%,最低节能比例也能达到7.8%,由此证明设计的方法具有一定研究价值。 展开更多
关键词 煤矿综采 配套组合开关 采煤设备 控制电路 电气互锁
在线阅读 下载PDF
煤矿井下重点场所5G覆盖性能研究及验证
14
作者 索智文 王亚坤 《工矿自动化》 北大核心 2025年第2期34-40,共7页
当前矿用5G专网相关研究主要面向系统架构和上层应用,结合井下实际环境对矿用5G底层技术特性的研究成果较少。为进一步推动矿用5G技术的高适配性发展和高可靠性应用,从矿用5G覆盖性能影响因素、煤矿重点场所矿用5G传输性能及现场测试3... 当前矿用5G专网相关研究主要面向系统架构和上层应用,结合井下实际环境对矿用5G底层技术特性的研究成果较少。为进一步推动矿用5G技术的高适配性发展和高可靠性应用,从矿用5G覆盖性能影响因素、煤矿重点场所矿用5G传输性能及现场测试3个方面展开研究。理论分析了5G工作频段、工作面或巷道截面面积、巷道壁粗糙度等与矿用5G覆盖性能的关系,结果表明:工作频段越低、工作面或巷道截面面积越大、巷道壁粗糙度越小、遮挡因素越少,则矿用5G覆盖性能越好。梳理了煤矿井下主运巷道、辅运巷道、综采工作面和掘进工作面的工作条件和环境因素等,得出结论:辅运巷道截面较大、粗糙度较低、遮挡相对少,5G覆盖性能最优;为改进上述场所中5G覆盖性能,宜采用低频段信号进行5G传输与覆盖。在4个煤矿的不同工作场所,采用900 MHz频段测试矿用5G传输性能,结果表明:辅运巷道极限覆盖距离超过700 m,主运巷道极限覆盖距离达450 m,综采工作面部署2个基站可实现稳定覆盖且上行传输速率保持在90 Mbit/s以上,掘进工作面距5G基站150 m处上行传输速率达68.2 Mbit/s。测试结果与理论分析一致,验证了矿用5G可有效满足不同工作场所的应用需求。 展开更多
关键词 矿用5G 覆盖性能 主运巷道 辅运巷道 综采工作面 掘进工作面
在线阅读 下载PDF
基于GRA-TOPSIS的综采工作面异常来压预警研究
15
作者 武智东 路雄 +3 位作者 刘凯璇 于凤启 徐乐 赵振中 《煤炭技术》 CAS 2025年第1期83-87,共5页
为了预防开采期间工作面矿压显现明显,局部地段甚至异常来压诱发的压架等问题。通过数理分析,建立的工作面异常来压评价模型对矿井中异常来压起到防范预警作用,其研究成果主要如下:(1)通过分析国内矿井的异常来压情况,选取埋深、采高煤... 为了预防开采期间工作面矿压显现明显,局部地段甚至异常来压诱发的压架等问题。通过数理分析,建立的工作面异常来压评价模型对矿井中异常来压起到防范预警作用,其研究成果主要如下:(1)通过分析国内矿井的异常来压情况,选取埋深、采高煤厚比、煤层倾角、基本顶厚度、直接顶厚度、推进速度、倾向长度等作为工作面来压评价因素,构建异常来压评价体系。(2)利用熵权法处理矿区数据得出各个因素的权重值,由TOPSIS法通过加权矩阵进行得分排序,采用灰色关联度分析法对TOPSIS法进行改进优化,得出灰色关联权重矩阵,进行构建工作面异常来压评价模型。(3)将所提出的模型应用在察哈素煤矿中,其评价效果较为理想。 展开更多
关键词 综采工作面 异常来压 熵权法 灰色关联度分析法 TOPSIS
在线阅读 下载PDF
综掘工作面粉尘运移规律及扰动拨流控尘技术研究
16
作者 刘子文 《工矿自动化》 北大核心 2025年第1期104-110,共7页
针对通风排尘、喷雾降尘等防尘技术在高浓度粉尘综掘工作面中应用效果不明显的问题,以山西蒲县宏源集团富家凹煤业有限公司11309综掘工作面为研究背景,利用Fluent软件构建了综掘工作面物理模型,通过数值模拟分析了风流场分布特征和粉尘... 针对通风排尘、喷雾降尘等防尘技术在高浓度粉尘综掘工作面中应用效果不明显的问题,以山西蒲县宏源集团富家凹煤业有限公司11309综掘工作面为研究背景,利用Fluent软件构建了综掘工作面物理模型,通过数值模拟分析了风流场分布特征和粉尘运移规律。数值模拟结果表明:利用正压风筒对综掘工作面供风时,风流到达工作面后沿壁面向下运动并扩散,受送风和吸尘风道吸力作用影响,风流形成漩涡,随着与工作面距离的增加,漩涡现象逐步减弱,直至消失;工作面区域风流流速较高,沿着巷道轴向向后风流流速逐渐降低;距综掘工作面越远,粉尘浓度越低;在综掘机司机位置附近粉尘浓度较高。在此基础上,提出了“以风控尘”为除尘思路的扰动拨流控尘技术。通过在正压风筒上增加扰动拨流装置,优化出风口布局,减少正压风筒最前端出口风量,以增加综掘机司机附近径向出风量;将除尘风机吸尘口前置,改变作业空间巷道风流方向,达到控尘、除尘的目的。通过工程实测验证了数值模拟结果和扰动拨流装置的可靠性,结果表明,使用扰动拨流装置后,综掘工作面粉尘浓度显著降低,降尘效率达90%以上。 展开更多
关键词 综掘工作面 粉尘防治 粉尘运移 风流场 扰动拨流控尘
在线阅读 下载PDF
不同采高综采工作面液压支架封闭控尘装置系列化研究
17
作者 庄学安 莫金明 《煤矿机械》 2025年第1期89-91,共3页
为了解决不同采高综采面液压支架降柱移架粉尘污染问题,开展了液压支架封闭控尘装置系列化研究。基于降柱移架产尘特点和液压支架结构,研发了适用于4 m以下、4~6 m、6 m、6 m以上采高综采面的架间喷雾引射抽尘净化装置和拉簧式、扭簧式... 为了解决不同采高综采面液压支架降柱移架粉尘污染问题,开展了液压支架封闭控尘装置系列化研究。基于降柱移架产尘特点和液压支架结构,研发了适用于4 m以下、4~6 m、6 m、6 m以上采高综采面的架间喷雾引射抽尘净化装置和拉簧式、扭簧式、滑移式液压支架防尘装置,在源头降低支架产尘90%以上。该系列装置在国能集团、陕煤集团下属多个矿井推广应用,受到矿方一致好评。 展开更多
关键词 综采工作面 粉尘污染 液压支架 封闭控尘装置 系列化
在线阅读 下载PDF
基于组态架构的综采工作面综合管控平台设计与应用
18
作者 王辉 吴早阳 +1 位作者 西成峰 唐博 《煤矿机械》 2025年第1期208-213,共6页
随着煤矿智能化技术不断发展,需要建设的智能化综采工作面越来越多,工作面综合管控平台应用需求也随之不断增长。然而,综合管控平台在推广过程中存在定制化需求高、界面设计及交互风格不统一等问题,导致二次开发及用户学习成本高。为解... 随着煤矿智能化技术不断发展,需要建设的智能化综采工作面越来越多,工作面综合管控平台应用需求也随之不断增长。然而,综合管控平台在推广过程中存在定制化需求高、界面设计及交互风格不统一等问题,导致二次开发及用户学习成本高。为解决上述问题,提出了一种基于组态架构的综采工作面综合管控平台。以综采工作面工业以太环网为数据高速传输链路,通过多种工控协议接入工作面三机一架、风水电等子系统监控点位,搭建了基于工作面多源异构数据的全场景功能组件库,利用组态编辑器导入功能组件库,并以拖拽的方式开发系统界面,最终以零代码二次开发方式实现不同综采工作面综合管控平台定制化功能。实际应用效果表明,开采人员在地面便可远程监控井下多源子系统设备点位,提高了煤矿开采效率,降低了安全事故的发生。与低代码二次开发方式相比,该平台不仅提高了系统部署及二次开发的效率,在系统界面设计风格与交互逻辑方面也达到了软件标准化推广效果,极大降低了系统推广难度和采煤用户的学习成本。 展开更多
关键词 综采工作面综合管控平台 功能组件库 组态编辑器 零代码
在线阅读 下载PDF
浅埋深薄基岩综采工作面合理煤柱宽度优化研究
19
作者 畅艳平 刘闯 +1 位作者 牛小雪 张启硕 《陕西煤炭》 2025年第3期24-28,56,共6页
为研究浅埋深薄基岩煤层开采条件下,煤柱宽度对大采高综采工作面回采过程中矿压规律的影响,以苏家寨煤矿5103大采高综采工作面为研究对象,建立不同煤柱宽度条件下的数值模拟开采模型。通过分析数值模拟结果得出,当工作面与回风巷之间留... 为研究浅埋深薄基岩煤层开采条件下,煤柱宽度对大采高综采工作面回采过程中矿压规律的影响,以苏家寨煤矿5103大采高综采工作面为研究对象,建立不同煤柱宽度条件下的数值模拟开采模型。通过分析数值模拟结果得出,当工作面与回风巷之间留设的煤柱为3 m时,回风巷道处于减压区,应力集中系数较小;煤柱宽度为5~12 m时,整个煤柱完全塑性破坏,煤柱强度急剧下降,巷道支护要求高;煤柱宽度大于15 m时,煤柱中塑性破坏范围减小,煤柱强度下降不明显;结合矿井实际支护方式和效果,确定工作面与回风巷道之间留设的煤柱尺寸为12~15 m。研究结果对浅埋薄基岩煤层开采的煤柱宽度优化具有一定的借鉴意义。 展开更多
关键词 浅埋深 大采高 综采工作面 煤柱宽度
在线阅读 下载PDF
大采高综采工作面刚柔组合整体铺网回撤支护研究
20
作者 王晋华 《能源与节能》 2025年第2期311-314,共4页
研究了大采高综采工作面刚柔组合整体铺网回撤支护技术。指出了该技术在提高采煤效率和保障工作面安全方面的重要性,明确强调了刚柔组合整体支护技术的前沿性和应用价值,并详细探讨了刚柔组合整体铺网回撤支护技术的原理、技术方案及其... 研究了大采高综采工作面刚柔组合整体铺网回撤支护技术。指出了该技术在提高采煤效率和保障工作面安全方面的重要性,明确强调了刚柔组合整体支护技术的前沿性和应用价值,并详细探讨了刚柔组合整体铺网回撤支护技术的原理、技术方案及其优缺点。最后,分析了该技术的应用效果、面临的挑战以及未来发展方向,并提出了相应的建议。 展开更多
关键词 大采高综采 刚柔组合 支护
在线阅读 下载PDF
上一页 1 2 220 下一页 到第
使用帮助 返回顶部