期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Forecasting water disaster for a coal mine under the Xiaolangdi reservoir 被引量:21
1
作者 SUN Ya-jun XU Zhi-min +3 位作者 DONG Qing-hong LIU Sheng-dong GAO Rong-bin JIANG Yu-hai 《Journal of China University of Mining and Technology》 EI 2008年第4期516-520,共5页
Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and ... Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and a limit of water infiltration were determined by rock-phase analysis and long term observations of surface water and groundwater. By field monitoring, as well as physical and numerical simulation experiments, we obtained data reflecting different heights of a water flow fractured zone (WFFZ) under different mining conditions, derived a formula to calculate this height and built a forecasting model with the aid of GIS. On the basis of these activities, the coal mine area was classified into three sub-areas with different potential of water inrush. In the end, our research results have been applied in and verified by industrial mining experiments at three working faces and we were able to present a successful example of coal mining under a large reservoir. 展开更多
关键词 coal mining under surface water water flow fractured zone water inrush of coal mine effective aquifuge forecasting model
在线阅读 下载PDF
Fractured zone height of longwall mining and its effects on the overburden aquifers 被引量:12
2
作者 Guo Wenbing Zou Youfeng Hou Quanlin 《International Journal of Mining Science and Technology》 SCIE EI 2012年第5期603-606,共4页
As mining depth becomes deeper and deeper,the possibility of undermining overburden aquifers is increasing.It is very important for coal miners to undertake studies on the height of fractured zone during longwall mini... As mining depth becomes deeper and deeper,the possibility of undermining overburden aquifers is increasing.It is very important for coal miners to undertake studies on the height of fractured zone during longwall mining and the effects of longwall mining on the underground water while mining under surface water bodies and underground aquifers.In order to study this problem,piezometers for monitoring underground water levels were installed above the longwall panels in an American coalmine.Large amounts of pre-mining,during mining and post-mining monitoring data were collected.Based on the data,the heights of fractured zones were obtained and the effects of longwall mining on the underground water were studied.The results demonstrate that when the piezometer monitoring wells had an interburden thickness of less than 72.7 m,the groundwater level decreased immediately to immeasurable levels and the wells went dry after undermining the face of longwall.The height of the fractured zone is 72.7-85.3 m in the geological and mining conditions.The results also show that the calculated values of fractured zones by the empirical formulae used in China are smaller than the actual results.Therefore,it is not always safe to use them for analyses while mining under water bodies. 展开更多
关键词 Longwall mining Fractured zone Mining under water body Overburden aquifer
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部