期刊文献+
共找到1,983篇文章
< 1 2 100 >
每页显示 20 50 100
基于Meyerhof理论的上软下硬层状地基极限承载力公式研究
1
作者 刘成 刘广俊 +2 位作者 贾贝贝 陈舒阳 孙富学 《林业工程学报》 北大核心 2025年第3期171-176,共6页
实际工程中上软下硬成层土较为常见,传统均质地基承载力公式不再适用,且各学者基于均质地基提出的层状地基承载力半经验公式可能会提供不可靠的预测。采用统一的对数螺旋线滑动面假定和极限平衡条件推导出重度承载力系数N_(γ),拓展了Me... 实际工程中上软下硬成层土较为常见,传统均质地基承载力公式不再适用,且各学者基于均质地基提出的层状地基承载力半经验公式可能会提供不可靠的预测。采用统一的对数螺旋线滑动面假定和极限平衡条件推导出重度承载力系数N_(γ),拓展了Meyerhof均质地基理论;并运用差值分析法将其延伸至双层地基,推导出上软下硬层状地基极限承载力理论公式,开展数值模型及文献理论公式对比验证。结果表明:Terzaghi公式低估了基础两侧土体真实作用,地基极限承载力的计算偏于保守;所得上软下硬层状地基承载力公式考虑了基础埋深影响,更符合地基破坏时的实际状态,计算结果与Meyerhof半经验公式有一定误差,而与数值模拟结果及Hansen加权平均法结果均吻合良好;Meyerhof双层地基半经验公式会提高承载力公式中σ_(0)N_(q)项的数值,经修正后得到的理论公式不仅简化了计算,同时符合唯一滑动面的实际情况,具有一定可信度。 展开更多
关键词 双层地基 理论推导 极限承载力 数值模拟 差值分析法
在线阅读 下载PDF
A computational method for post-construction settlement of high-speed railway bridge pile foundation considering soil creep effect 被引量:12
2
作者 冯胜洋 魏丽敏 +1 位作者 何重阳 何群 《Journal of Central South University》 SCIE EI CAS 2014年第7期2921-2927,共7页
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th... Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation. 展开更多
关键词 high-speed railway bridge pile foundation post-construction settlement mesri creep model simplified computational method
在线阅读 下载PDF
Free vibration analysis of non-homogeneous orthotropic plates resting on Pasternak elastic foundation by Rayleigh-Ritz method 被引量:1
3
作者 Ahmad Rahbar-Ranji Arash Shahbaztabar 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第2期413-420,共8页
Free vibration analysis of non-homogeneous orthotropic plates resting on a Pasternak type of elastic foundation is investigated. A set of admissible orthogonal polynomials are generated with Gram-Schmidt orthogonaliza... Free vibration analysis of non-homogeneous orthotropic plates resting on a Pasternak type of elastic foundation is investigated. A set of admissible orthogonal polynomials are generated with Gram-Schmidt orthogonalization procedure and adopted in the Rayleigh-Ritz method. Accuracy and applicability of the method are examined by comparison of the results for different boundary conditions and material types with those available in literature. It is found that this method has good accuracy regardless of type of boundary condition and yields very accurate results even with low number of terms of orthogonal polynomials for the first mode of vibration. For higher modes of vibration, higher terms of orthogonal polynomials should be used. The effects of foundation parameter, density and non-homogeneity parameters on natural frequency are examined. It is concluded that natural frequency of plates are more sensitive to shearing layer coefficient rather than Winkler coefficient and density parameter has weakening effect on natural frequency. 展开更多
关键词 free vibration non-homogeneous orthotropic plate Pastemak foundation Rayleigh-Ritz method Gram-Schmidt procedure
在线阅读 下载PDF
随机风浪作用下15 MW近海单桩风机基础疲劳分析
4
作者 栾志萌 窦培林 +3 位作者 方世祥 严松松 张浩然 库一航 《舰船科学技术》 北大核心 2025年第4期143-147,共5页
单桩式风机塔筒是支撑整个风机叶片和机组的基础结构,其疲劳强度的稳定性和可靠性是风机设备安全运行的重要保障。本文以15 MW海上风机塔筒为对象,通过采用完全耦合的时域仿真程序,考虑实际环境条件,得出塔基的荷载和结构应力情况,并使... 单桩式风机塔筒是支撑整个风机叶片和机组的基础结构,其疲劳强度的稳定性和可靠性是风机设备安全运行的重要保障。本文以15 MW海上风机塔筒为对象,通过采用完全耦合的时域仿真程序,考虑实际环境条件,得出塔基的荷载和结构应力情况,并使用雨流计数法和Miner准则计算疲劳累积损伤。结果表明,波浪荷载引起的塔座疲劳损伤大于风荷载引起的疲劳损伤。在额定风速的环境条件下,考虑风浪错位的联合作用会导致塔基疲劳损伤最大。 展开更多
关键词 单桩式风力机 疲劳分析 雨流计数法 风机基础
在线阅读 下载PDF
High-thermal free vibration analysis of functionally graded microplates using a new finite element formulation based on TSDT and MSCT
5
作者 Huu Trong Dang Nhan Thinh Hoang +2 位作者 Quoc Hoa Pham Trung Thanh Tran Huy Gia Luong 《Defence Technology(防务技术)》 2025年第2期131-149,共19页
Recent advancements in additive manufacturing(AM)have revolutionized the design and production of complex engineering microstructures.Despite these advancements,their mathematical modeling and computational analysis r... Recent advancements in additive manufacturing(AM)have revolutionized the design and production of complex engineering microstructures.Despite these advancements,their mathematical modeling and computational analysis remain significant challenges.This research aims to develop an effective computational method for analyzing the free vibration of functionally graded(FG)microplates under high temperatures while resting on a Pasternak foundation(PF).This formulation leverages a new thirdorder shear deformation theory(new TSDT)for improved accuracy without requiring shear correction factors.Additionally,the modified couple stress theory(MCST)is incorporated to account for sizedependent effects in microplates.The PF is characterized by two parameters including spring stiffness(k_(w))and shear layer stiffness(k_(s)).To validate the proposed method,the results obtained are compared with those of the existing literature.Furthermore,numerical examples explore the influence of various factors on the high-temperature free vibration of FG microplates.These factors include the length scale parameter(l),geometric dimensions,material properties,and the presence of the elastic foundation.The findings significantly enhance our comprehension of the free vibration of FG microplates in high thermal environments.In addition,the findings significantly enhance our comprehension of the free vibration of FG microplates in high thermal environments.In addition,the results of this research will have great potential in military and defense applications such as components of submarines,fighter aircraft,and missiles. 展开更多
关键词 microplates Functionally graded material Finite element method modified couple stress theory New TSDT High-thermal free vibration Pasternak foundation
在线阅读 下载PDF
基于DEM-FDM耦合的平行隧道间钢套管下旋施工影响研究
6
作者 徐泽宇 杨涛 周小波 《岩土工程学报》 EI CAS 北大核心 2025年第1期207-216,共10页
采用离散元-有限差分耦合数值方法研究平行隧道间钢套管下旋施工的影响。根据工程实例建立数值模型,并通过对比模拟值与实测值验证了数值分析方法的合理性。数值模型分析了双隧道-静压、双隧道-旋压、单隧道-旋压等3种工况下隧道和土层... 采用离散元-有限差分耦合数值方法研究平行隧道间钢套管下旋施工的影响。根据工程实例建立数值模型,并通过对比模拟值与实测值验证了数值分析方法的合理性。数值模型分析了双隧道-静压、双隧道-旋压、单隧道-旋压等3种工况下隧道和土层的受力变形特性。结果表明:钢套管旋压施工导致隧道产生的横向位移为静压施工的163.5%,单隧道工况下的隧道横、竖向变形分别较双隧道工况增加32.7%和53.4%;旋压相较于静压可以有效减小管片的收敛变形,而单隧道工况的收敛变形为双隧道工况的2倍;旋压工况下,随钢套管沉入深度增加,旋转指数先增加后减小,最大值发生在套管下沉至隧道拱顶附近,而在静压工况下需重点关注竖向旋转引起的管片错位;对于双隧道-旋压工况,应重点关注施工初期由于土体水平位移引起的地层变位和施工后期土体竖向位移可能导致的机械倾覆和钢套管的垂直度误差;隧道管片应力分布区域及特征与钢套管动态施工过程紧密相关,应在不同阶段采用相应的管片补强措施。 展开更多
关键词 桩基础 隧道工程 离散元-有限差分法 钢套管 受力变形
在线阅读 下载PDF
黏弹性四参数地基上两跨连续修正Timoshenko梁的横向自振特性分析
7
作者 柳伟 汪过兵 《振动工程学报》 北大核心 2025年第3期604-611,共8页
为解决黏弹性四参数地基上两跨连续修正Timoshenko梁的横向振动问题,将两跨连续修正Timoshenko梁与黏弹性四参数地基进行组合,建立新的振动控制方程,运用回传射线矩阵法,结合二分法和黄金分割法,分析了黏弹性四参数地基上两跨(等跨、不... 为解决黏弹性四参数地基上两跨连续修正Timoshenko梁的横向振动问题,将两跨连续修正Timoshenko梁与黏弹性四参数地基进行组合,建立新的振动控制方程,运用回传射线矩阵法,结合二分法和黄金分割法,分析了黏弹性四参数地基上两跨(等跨、不等跨)连续修正Timoshenko梁与单跨修正Timoshenko梁自振特性之间的联系与区别。结果表明:对于黏弹性四参数地基上的修正Timoshenko梁,单跨梁的各阶自振频率小于两跨连续梁的各阶自振频率,单跨梁的偶数阶自振频率和衰减系数与两等跨连续梁的奇数阶自振频率和衰减系数相同,不等跨两跨连续梁奇数阶自振频率小于两等跨连续梁奇数阶自振频率;两等跨连续修正Timoshenko梁的偶数阶振型关于跨中支座对称,奇数阶振型关于跨中支座反对称。 展开更多
关键词 黏弹性四参数地基 两跨连续修正Timoshenko梁 回传射线矩阵法 横向振动 模态
在线阅读 下载PDF
基于DEM-FDM耦合的过渡段膨胀诱发钢轨上拱研究
8
作者 汪优 高天涯 +4 位作者 闫斌 王瑞 陈子娟 张文旭 程建军 《铁道工程学报》 EI CSCD 北大核心 2024年第1期7-12,共6页
研究目的:为分析涵洞过渡段地基膨胀引起的钢轨上拱响应,基于现场测试、室内膨胀试验数据,开展DEM-FDM耦合数值模拟,分析某涵洞附近路基土在膨胀范围为16 m,膨胀中心距离涵洞中心分别为0 m、5 m、10 m这三种工况下,不同膨胀率时基床填... 研究目的:为分析涵洞过渡段地基膨胀引起的钢轨上拱响应,基于现场测试、室内膨胀试验数据,开展DEM-FDM耦合数值模拟,分析某涵洞附近路基土在膨胀范围为16 m,膨胀中心距离涵洞中心分别为0 m、5 m、10 m这三种工况下,不同膨胀率时基床填料的运动规律及钢轨的上拱响应。研究结论:(1)涵洞对于钢轨上拱位移的传递存在阻断作用,但会增大钢轨上拱的峰值,原位膨胀率下工况二的钢轨上拱峰值达到46 mm,当路基膨胀率为0.3%时钢轨上拱位移量达到无砟轨道钢轨可调节临界值(4mm);(2)过渡段钢轨上拱处同时产生轴向应力集中,其中原位膨胀率下工况二轴向应力峰值达到14.4 MPa;(3)对于膨胀区域位于涵洞下方的工况,钢轨轴向应力呈现出来的分布规律为钢轨上拱拱顶处为主拉应力状态,拱脚处为主压应力状态,因此一共包括三个压应力峰值点以及两个拉应力峰值点;(4)本文研究可为高铁涵洞过渡段路基膨胀病害解决方案的确定提供理论依据。 展开更多
关键词 过渡段 路基膨胀 无砟轨道 钢轨上拱 有限差分 离散元
在线阅读 下载PDF
基于M序列的磁电法探测坝基渗漏试验研究
9
作者 刘瑾 车文越 +4 位作者 钱卫 张化鹏 黄国娇 丁亮 何秀凤 《西南交通大学学报》 EI CSCD 北大核心 2024年第6期1448-1456,共9页
坝基渗漏问题是影响水库大坝整体安全的关键因素.为有效、准确探测坝基渗漏,基于伪随机辨识原理,将M序列相关辨识的磁电法技术应用于堤坝渗漏探测.首先,通过物理模型试验分析,获取不同渗漏深度下的磁感应强度分布、均方差及变异系数特征... 坝基渗漏问题是影响水库大坝整体安全的关键因素.为有效、准确探测坝基渗漏,基于伪随机辨识原理,将M序列相关辨识的磁电法技术应用于堤坝渗漏探测.首先,通过物理模型试验分析,获取不同渗漏深度下的磁感应强度分布、均方差及变异系数特征;然后,设计不同渗漏形态、高阻屏蔽层及渗漏通道数量条件,获取探测结果对倾斜通道、高阻屏蔽层以及多条渗漏通道的响应特征;最后,通过云南红石岩堰塞坝现场试验,分析该技术的可行性.试验结果表明:在不同埋深条件下,磁感应强度最大值的变异系数均控制在2%以内;渗漏通道的倾斜引起磁感应强度沿渗漏方向缓慢降低,其磁场等值线图的脊线反映倾斜渗漏方向;高阻屏蔽层仅对磁感应强度产生影响,磁感应强度误差在10%~20%;多组渗漏通道会反映在磁场等值线图中异常场的多处集中分布;现场试验探测的渗流流向分别为NW300°、SW265°、W215°和NW305°. 展开更多
关键词 渗漏识别 m序列 磁电法 坝基渗漏 土槽试验
在线阅读 下载PDF
基于MF-EI法的水闸底板脱空参数反演
10
作者 李火坤 方静 +1 位作者 黄伟 万子豪 《振动.测试与诊断》 EI CSCD 北大核心 2024年第5期936-942,1038,1039,共9页
为了更好地解决水工结构以损伤诊断为目标的传感器布置问题,以软基水闸为研究对象、水闸底板脱空为损伤类型,针对传统有效独立法未考虑结构损伤信息的缺陷,将模态柔度作为结构损伤敏感特征量,并引入结构的模态柔度修正有效独立法,提出... 为了更好地解决水工结构以损伤诊断为目标的传感器布置问题,以软基水闸为研究对象、水闸底板脱空为损伤类型,针对传统有效独立法未考虑结构损伤信息的缺陷,将模态柔度作为结构损伤敏感特征量,并引入结构的模态柔度修正有效独立法,提出基于模态柔度-有效独立法(modal flexibility-effective independent method,简称MFEI)的水闸底板脱空参数反演方法。采用模态置信准则、Fisher信息阵、条件数准则和奇异值分解比准则4种评价指标,分别对距离系数-有效独立法(distance coefficient-effective independence method,简称DC-EI)、有效独立-总位移法(effective independence-total displacement method,简称EI-TD)和MF-EI法进行评价,并将3种方法得到的布置方案应用到不同工况下软基水闸底板脱空动力学反演中,对比分析3种方法各工况脱空参数的反演结果。结果表明:MF-EI法测得的模态矩阵具有更好的正交性、可观测性和模态扩阶性,同时保留了对软基水闸底板脱空敏感的损伤信息,3种工况下的脱空参数反演识别精度分别提高至97.5%,96.1%和75.9%,是一种较为有效的水闸底板脱空参数反演方法。 展开更多
关键词 软基水闸 底板脱空 传感器优化布置 模态柔度-有效独立法 反演
在线阅读 下载PDF
Analytical solution for evaluating deformation response of existing metro tunnel due to excavation of adjacent foundation pit 被引量:10
11
作者 QIU Ju-tao JIANG Jie +2 位作者 ZHOU Xiao-jun ZHANG Yue-feng PAN Ying-dong 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第6期1888-1900,共13页
The excavation of foundation pit generates soil deformation around existing metro tunnel with shield driving method,which may lead to the deformation of tunnel lining.It is a challenge to evaluate the deformation of s... The excavation of foundation pit generates soil deformation around existing metro tunnel with shield driving method,which may lead to the deformation of tunnel lining.It is a challenge to evaluate the deformation of shield tunnel accurately and take measures to reduce the tunnel upward displacement as much as possible for geotechnical engineers.A new simplified analytical method is proposed to predict the longitudinal deformation of existing metro tunnel due to excavation unloading of adjacent foundation pit in this paper.Firstly,the additional stress of soils under vertical axisymmetric load in layered soil is obtained by using elastic multi-layer theory.Secondly,the metro tunnel is regarded as a Timoshenko beam supported by Winkler foundation so that the shear effect of tunnels can be taken into account.The additional stress acting on the tunnel due to excavation unloading in layered soil are compared with that in homogeneous soil.Additionally,the effectiveness of the analytical solution is verified via two actual cases.Moreover,parametric analysis is conducted to investigate the responses of the metro tunnel by considering such factors as the variation of subgrade coefficient,offset distance from the excavation center to tunnel longitudinal axis as well as equivalent shear stiffness.The proposed method can be used to provide theoretical basis for similar engineering project. 展开更多
关键词 metro tunnel simplified analytical method additional stress Timoshenko beam Winkler foundation
在线阅读 下载PDF
Force analysis of pile foundation in rock slope based on upper-bound theorem of limit 被引量:13
12
作者 赵明华 刘建华 +1 位作者 刘代全 汪优 《Journal of Central South University of Technology》 EI 2008年第3期404-410,共7页
Based on the characteristic that the potential sliding surfaces of rock slope are commonly in the shape of either line or fold line,analysis thought of conventional pile foundation in the flat ground under complex loa... Based on the characteristic that the potential sliding surfaces of rock slope are commonly in the shape of either line or fold line,analysis thought of conventional pile foundation in the flat ground under complex load condition was applied and the upper-bound theorem of limit analysis was used to compute thrust of rock layers with all possible distribution shapes. The interaction of slope and pile was considered design load in terms of slope thrust,and the finite difference method was derived to calculate inner-force and displacement of bridge pile foundation in rock slope under complex load condition. The result of example shows that the distribution model of slope thrust has certain impact on displacement and inner-force of bridge pile foundation. The maximum displacement growth rate reaches 54% and the maximum moment and shear growth rates reach only 15% and 20%,respectively,but the trends of inner-force and displacement of bridge pile foundation are basically the same as those of the conventional pile foundation in the flat ground. When the piles bear the same level lateral thrust,the distribution shapes of slope thrust have different influence on inner-force of pile foundation,especially the rectangle distribution,and the triangle thrust has the smallest displacement and inner-force of pile foundation. 展开更多
关键词 pile foundation rock slope inner-force calculation finite difference method upper-bound theorem of limit analysis
在线阅读 下载PDF
Analysis model for deformation mechanism of strip foundation of building:Considering shear effect of down-crossing tunnel under excavation 被引量:6
13
作者 WU Ting-yao JIANG Nan +3 位作者 ZHOU Chuan-bo XIA Yu-qing ZHANG Yu-qi ZHU Bin 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第8期2556-2573,共18页
When the tunnel underpasses through the building,it will cause deformation and even damage to the buildings above,and the deformation of building foundation is the key to building safety.Based on the engineering case,... When the tunnel underpasses through the building,it will cause deformation and even damage to the buildings above,and the deformation of building foundation is the key to building safety.Based on the engineering case,the theoretical analysis was employed to evaluate the influence of shield tunnel underpass construction on the stability of the building,and the optimal tunneling parameters in the field construction have been obtained through the verified theoretical model and parameter analysis.First,the strip foundation of the building was simplified to the Timoshenko beam,which was taken into account the shear effect,and then the deformation displacement of the soil at the same place of strip foundation was applied to the simplified Timoshenko beam.Finally,the numerical solution of the displacement of the strip foundation was obtained by using the finite element method and verified its reliability using Euler-Bernoulli beam theoretical model,field monitoring data,and numerical simulation.Parameters analysis for the deformation and internal force of strip foundation under different types of shield machine tunneling parameters showed that the influence of the pressure of shield excavation chamber,thrust of shield,and driving speed played an important role in the deformation of the building’s strip foundation and internal force. 展开更多
关键词 down-crossing tunnel Timoshenko beam strip foundation finite element method parameters analysis
在线阅读 下载PDF
Sand deposit-detecting method and its application in model test of sand flow 被引量:2
14
作者 黎伟 房营光 +2 位作者 莫海鸿 谷任国 陈俊生 《Journal of Central South University》 SCIE EI CAS 2013年第10期2840-2848,共9页
Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale m... Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale model test of sand-flow method. The real-time data of sand-deposit height and radius were obtained by the self-developed sand-deposit detectors. The test results show that the detecting method is simple and has high precision. In the use of sand-flow method, the sand-carrying capability of fluid is limited, and sand particles are all transported to the sand-deposit periphery through crater, gap and chutes after the sand deposit formed. The diffusion range of the particles outside the sand-deposit does not exceed 2.0 m. Severe sorting of sand particles is not observed because of the unique oblique-layered depositing process. The temporal and spatial distributions of gap and chutes directly affect the sand-deposit expansion, and the expansion trend of the average sand-deposit radius accords with quadratic time-history curve. 展开更多
关键词 immersed tube TUNNEL foundation treatment model test of sand-flow method SAND DEPOSIT detecting structural characteristics of sand-deposit
在线阅读 下载PDF
Effects of liquefaction-induced large lateral ground deformation on pile foundations 被引量:5
15
作者 王艳丽 程展林 王勇 《Journal of Central South University》 SCIE EI CAS 2013年第9期2510-2518,共9页
The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,n... The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,numerical methods involving finite difference approach of pile in liquefaction-induced lateral spreading ground were derived and implemented into a finite difference program.Based on the monotonic loading tests on saturated sand after liquefaction,the liquefaction lateral deformation of the site where group piles are located was predicted.The effects of lateral ground deformation after liquefaction on a group of pile foundations were studied using the fmite difference program mentioned above,and the failure mechanism of group piles in liquefaction-induced lateral spreading ground was obtained.The applicability of the program was preliminarily verified.The results show that the bending moments at the interfaces between liquefied and non-liquefied soil layers are larger than those at the pile's top when the pile's top is embedded.The value of the additional static bending moment is larger than the peak dynamic bending moment during the earthquake,so in the pile foundation design,more than the superstructure's dynamics should be considered and the effect of lateral ground deformation on pile foundations cannot be neglected. 展开更多
关键词 liquefaction-induced lateral spreading ground pile foundation large post-liquefaction deformation finite difference method
在线阅读 下载PDF
Settlement calculation for long-short composite piled raft foundation 被引量:4
16
作者 赵明华 张玲 杨明辉 《Journal of Central South University of Technology》 EI 2006年第6期749-754,共6页
The mechanism of long-short composite piled raft foundation was discussed. Assuming the relationship between shear stress and shear strain of the surrounding soil was elasto-plastic, shear displacement method was empl... The mechanism of long-short composite piled raft foundation was discussed. Assuming the relationship between shear stress and shear strain of the surrounding soil was elasto-plastic, shear displacement method was employed to establish the different explicit relational equations between the load and the displacement at the top of pile in either elastic or elasto-plastic period. Then Mylonakis & Gazetas model was introduced to simulate the interaction between two piles or between piles and soil. Considering the effect of cushion, the flexible coefficients of interaction were provided, With the addition of a relevant program, the settlement calculation for long-short composite piled raft foundation was developed which could be used to account for the interaction of piles, soil and cushion. Finally, the calculation method was used to analyze an engineering example. The calculated value of settlement is 10.2 ram, which is close to the observed value 8.8 mm. 展开更多
关键词 long-short composite oiled raft foundation shear displacement method SETTLEmENT mylonakis Gazetas model
在线阅读 下载PDF
3-D fracture network dynamic simulation based on error analysis in rock mass of dam foundation 被引量:5
17
作者 ZHONG Deng-hua WU Han +2 位作者 WU Bin-ping ZHANG Yi-chi YUE Pan 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第4期919-935,共17页
Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network mode... Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network model and measured data,a 3-D fracture network dynamic modeling method based on error analysis was proposed.Firstly,errors of four fracture volume density estimation methods(proposed by ODA,KULATILAKE,MAULDON,and SONG)and that of four fracture size estimation methods(proposed by EINSTEIN,SONG and TONON)were respectively compared,and the optimal methods were determined.Additionally,error index representing the deviation between fracture network model and measured data was established with integrated use of fractal dimension and relative absolute error(RAE).On this basis,the downhill simplex method was used to build the dynamic modeling method,which takes the minimum of error index as objective function and dynamically adjusts the fracture density and size parameters to correct the error index.Finally,the 3-D fracture network model could be obtained which meets the requirements.The proposed method was applied for 3-D fractures simulation in Miao Wei hydropower project in China for feasibility verification and the error index reduced from 2.618 to 0.337. 展开更多
关键词 rock mass of dam foundation 3-D fracture network dynamic simulation fractal dimension error analysis relative absolute error(RAE) downhill simplex method
在线阅读 下载PDF
基坑开挖引起下卧隧道竖向变形的Hermite谱分析方法 被引量:5
18
作者 黄明华 胡正刚 +2 位作者 周钲霖 周苏华 谭鑫 《安全与环境学报》 CAS CSCD 北大核心 2024年第2期488-495,共8页
针对基坑开挖引起下卧隧道的竖向变形问题,通过引入Hermite函数,建立基坑开挖所引起土体附加应力及下卧隧道竖向变形的Hermite谱分析方法。基于Mindlin解答与Pasternak地基上的Euler-Bernoulli梁理论,建立了基坑开挖所引起土体附加应力... 针对基坑开挖引起下卧隧道的竖向变形问题,通过引入Hermite函数,建立基坑开挖所引起土体附加应力及下卧隧道竖向变形的Hermite谱分析方法。基于Mindlin解答与Pasternak地基上的Euler-Bernoulli梁理论,建立了基坑开挖所引起土体附加应力的计算表达式与下卧隧道竖向变形的控制方程,并采用有限项Hermite级数展开,将下卧隧道竖向变形控制方程转化为线性代数系统进行求解,获得其竖向变形解答;在此基础上,结合工程案例,验证所建立解答的收敛性与可靠性,并探讨隧道埋深、隧道与基坑水平距离及基坑平面尺寸对下卧隧道竖向变形特性的影响。结果表明:随着隧道埋深及隧道与基坑水平距离的增加,基坑开挖对下卧隧道竖向变形的影响逐渐降低,下卧隧道的竖向位移逐渐变小;基坑开挖水平尺寸的增大会使下卧隧道竖向变形增大,且平行隧道方向的尺寸变化,影响更为明显。研究成果为分析基坑开挖所引起的下卧隧道竖向变形特性提供了一种新的计算方法。 展开更多
关键词 安全工程 下卧隧道 竖向变形 基坑开挖 Hermite谱方法
在线阅读 下载PDF
基于SPH-FEM耦合方法的泥石流冲击输电塔基础的动力分析 被引量:5
19
作者 于虹 李昊 +4 位作者 许标 张磊 汪大海 张志强 张贵峰 《防灾减灾工程学报》 CSCD 北大核心 2024年第1期68-78,共11页
泥石流是我国西南山区常见的地质灾害。架空输电杆塔在泥石流的冲击下往往发生基础破坏甚至会造成杆塔倒塌。首先采用光滑粒子流体动力学(smoothed particle hydrodynamics,简称SPH)方法和有限元方法(finite element method,简称FEM)相... 泥石流是我国西南山区常见的地质灾害。架空输电杆塔在泥石流的冲击下往往发生基础破坏甚至会造成杆塔倒塌。首先采用光滑粒子流体动力学(smoothed particle hydrodynamics,简称SPH)方法和有限元方法(finite element method,简称FEM)相耦合的三维数值方法模拟了泥石流对杆塔基础的冲击作用;在与相关模型试验结果验证的基础上,开展了不同泥石流密度、黏度系数及初始速度条件下对输电塔基础的冲击力作用的参数分析;研究结果表明:随着泥石流初始速度的增加,冲击力峰值会随之增大;前排基础的冲击力峰值均大于后排基础;泥石流冲击过程特性受到泥石流密度和黏度系数影响。与稀性泥石流相比:黏性泥石流冲击基础后,基础下游真空区相对要小;此外,将数值模拟结果与Kwan冲击力公式及铁二院推荐的冲击压力设计公式预测值进行对比分析可以发现:Kwan冲击力公式能较好地预测出基础所受泥石流冲击力的平均趋势,最大预测误差低于30%,铁二院公式预测的稀性和黏性泥石流的冲击压力平均偏低分别约17%和28%。相关研究结果有望为泥石流频发区域输电塔基础的设计和风险评估提供一定的参考依据。 展开更多
关键词 SPH-FEm耦合方法 泥石流 输电塔基础 冲击力 流固耦合
在线阅读 下载PDF
基于ESMD-FE-AJSO-LSTM算法的水闸深基坑变形预测 被引量:7
20
作者 张伟 邓彬彬 +5 位作者 仇建春 夏国春 姚兆仁 刘占午 朱新宇 王昱锦 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期378-387,408,共11页
水闸深基坑开挖变形具有明显的非线性和非稳定性特征,基于此,引入极点对称模态分解算法(extremepoint symmetric mode decomposition method,ESMD)对水闸深基坑开挖变形原型监测序列进行多模态分解,并基于模糊熵(fuzzy entropy, FE)理... 水闸深基坑开挖变形具有明显的非线性和非稳定性特征,基于此,引入极点对称模态分解算法(extremepoint symmetric mode decomposition method,ESMD)对水闸深基坑开挖变形原型监测序列进行多模态分解,并基于模糊熵(fuzzy entropy, FE)理论对各分解分量进行模糊多模态相空间重构,从而有效甄别水闸基坑变形不同时间尺度有效物理特征。构建基于人工水母搜索算法(artificial jellyfish search optimizer,AJSO)优化的长短期记忆(long short-term memory,LSTM)人工神经网络模型,以重构后的各重构子序列为基础进行优化训练,并把训练后的各预测模态分量合并,实现对水闸基坑开挖变形动态预测和分析。以张家港市十一圩江边枢纽改建工程基坑开挖变形监测为例,采用上述方法对该枢纽工程基坑开挖过程变形进行预测和分析。结果表明:基于ESMD-FE-AJSOLSTM算法的水闸深基坑变形预测方法能够有效预测基坑开挖变形非线性特征,相比传统LSTM、循环神经网络(recurrent neural network, RNN)和支持向量机(support vector machine,SVM)等算法具有更高的预测精度和稳定性,为实现对基坑开挖安全性态实时科学诊断和分析提供技术参考。 展开更多
关键词 极点对称模态分解算法 模糊熵 人工水母搜索算法 长短期记忆 水闸 深基坑 变形预测
在线阅读 下载PDF
上一页 1 2 100 下一页 到第
使用帮助 返回顶部