3-D numerical modelling of Domino failure of hard rock pillars in Fetr6 Chromite Mine, Iran, and comparison with empirical methods 被引量:12
1
作者 S.Dehghan K.Shahriar +1 位作者 P.Maarefvand K.Goshtasbi 《Journal of Central South University》 SCIE EI CAS 2013年第2期541-549,共9页
Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as roof support and replacing existing pillars with concret... Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as roof support and replacing existing pillars with concrete pillars (CP) were carried out. During the construction of the second CP, in the space between the remaining pillars, one of the pillars failed leading to the progressive failure of other pillars until 4 000 m 2 of mine had collapsed within a few minutes. In this work, this phenomenon is described by applying both numerical and empirical methods and the respective results are compared. The results of numerical modelling are found to be closer to the actual condition than those of the empirical method. Also, a width-to-height (W/H) ratio less than 1, an inadequate support system and the absence of a detailed program for pillar recovery are shown to be the most important causes of the Domino failure in this mine. 展开更多
关键词 hard rock Domino failure numerical modelling empirical method STOPE PILLAR extraction ratio W/H ratio
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部