期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
造岩矿物性质对岩体可破坏性的影响
1
作者 刘瑞 《矿物岩石地球化学通报》 CAS CSCD 1999年第1期11-11,共1页
工程地基的选址依据,本世纪中叶以前是地基范围内没有断裂,即避免断裂原则。60年代以后,工程选址的条件由避免断裂转变为考察断裂是否活动。美国率先制定了工程地基范围内活动断裂指标规范,认为具有非活动性断裂的岩体上可以构筑... 工程地基的选址依据,本世纪中叶以前是地基范围内没有断裂,即避免断裂原则。60年代以后,工程选址的条件由避免断裂转变为考察断裂是否活动。美国率先制定了工程地基范围内活动断裂指标规范,认为具有非活动性断裂的岩体上可以构筑大型工程。花岗岩体规模大,整体性好... 展开更多
关键词 water rock interaction ORE FORMING fluid inspissation dewatering RESERVE PROGNOSTICATION
在线阅读 下载PDF
Dynamic simulation of pilot thickener operation using phenomenological model with results validation for continuous and discontinuous tests 被引量:1
2
作者 Rahimi Mehdi Unesi Majid +1 位作者 Rezai Bahram Abdollahzadeh Ali 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第5期1207-1216,共10页
The phenomenological theory of sedimentation-thickening processes predicts the settling behavior of a flocculated suspension in dependence of two functions, the batch flux density function and the effective solid stre... The phenomenological theory of sedimentation-thickening processes predicts the settling behavior of a flocculated suspension in dependence of two functions, the batch flux density function and the effective solid stress. These functions were determined using batch settling tests. The governing equations for sedimentation were then solved numerically for these functions and the predictions were compared to the experimental results from pilot scale thickener tests. Firstly, the continuous tests were performed in the plexiglass pilot thickener at different feed flow rates and discharge rates and the solid volume fraction of discharge, the bed height and the time were recorded for each condition. These tests were also simulated and it was observed that there is a good agreement between the results of continuous tests and the results of dynamic simulation. Secondly, the discontinuous tests were performed in the plexiglass pilot thickener at different feed flow rates with a discharge rate of zero. The bed formation rate was determined for each condition. These tests were also simulated and it was observed that there is a good agreement between the results of discontinuous tests and the results of simulation. 展开更多
关键词 dynamic simulation dewatering THICKENER behavior PILOT THICKENER VALIDATION
在线阅读 下载PDF
Limiting drainage criterion for groundwater of mountain tunnel 被引量:1
3
作者 程盼 赵炼恒 +2 位作者 李亮 邹金锋 罗伟 《Journal of Central South University》 SCIE EI CAS 2014年第12期4660-4668,共9页
Large amount of groundwater discharging from tunnel is likely to cause destruction of the ecological environment in the vicinity of the tunnel, thus an appropriate drainage criterion should be established to balance t... Large amount of groundwater discharging from tunnel is likely to cause destruction of the ecological environment in the vicinity of the tunnel, thus an appropriate drainage criterion should be established to balance the tunnel construction and groundwater.To assess the related problems, an limiting drainage standard ranging from 0.5 to 2.0 m3/(m·d) was suggested for mountain tunnels based on survey and comparative analysis. After that, for the purpose of verifying the rationality of the standard, a calculated formula for dewatering funnel volume caused by drainage was deduced on the basis of the groundwater dynamics and experience method.Furthermore, the equation about the relationship between water discharge and drawdown of groundwater table was presented. The permeability coefficient, specific yield and groundwater table value were introduced, and then combined with the above equation, the drawdown of groundwater table under the proposed limiting drainage criterion was calculated. It is shown that the proposed drainage standard can reach the purpose of protecting ecological environment under the following two conditions. One is the permeability coefficient ranges from 10-4 to 10-5 m/s and the specific yield ranges from 0.1 to 0.001. The other is the permeability coefficient varies from 10-6 to 10-8 m/s and the specific yield varies from 0.1 to 0.01. In addition, a majority of common geotechnical layers are involved in the above ranges. Thus, the proposed limiting drainage standard which ranges from 0.5 to 2.0 m3/(m·d) for mountain tunnel is reasonable. 展开更多
关键词 mountain tunnel groundwater dewatering funnel limiting drainage criterion drawdown of groundwater table
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部