Traditional pyrometallurgical and hydrometallurgical methods to extract bismuth from sulfide ores face problems such as high cost,low-concentration SO_(2)generation,and long process time.In this study,the cyclone tech...Traditional pyrometallurgical and hydrometallurgical methods to extract bismuth from sulfide ores face problems such as high cost,low-concentration SO_(2)generation,and long process time.In this study,the cyclone technology and slurry electrolysis method were combined.The bismuth sulfide ore was dissolved directly at the anode,while the high purity bismuth was deposited efficiently at the cathode under the advantages of the two methods.The short process and high-efficiency extraction of bismuth sulfide ore were realized,and the pollution of low-concentration SO_(2)was avoided.Then,the effects of several crucial experimental conditions(current density,reaction time,temperature,pH,liquid-solid ratio,and circulation flow rate)on the leaching efficiency and recovery efficiency of bismuth were investigated.The leaching and electrowinning mechanisms during the recovery process were also analyzed according to the research results of this paper to better understand the cyclone slurry electrolysis process.The experimental results showed that 95.19%bismuth was leached into the acid solution in the anode area under optimal conditions,and the recovery efficiency and purity of bismuth on the cathode reached 91.13%and 99.26%,respectively,which were better than those by the traditional hydrometallurgy recovery process.展开更多
A new technique of combining accretion by cyclone separator and scattertube for tailings dams was developed according to laboratory experiment, model experiment and spot experiment technology. Three tailings dams were...A new technique of combining accretion by cyclone separator and scattertube for tailings dams was developed according to laboratory experiment, model experiment and spot experiment technology. Three tailings dams were successfully constructed by the new technique. The results of engineering geological exploration, static and dynamic test and stability analysis on Baizhishan tailings dams prove that the new technique improves structure and stability of the dams and working conditions compared with the traditional technique. The thin layers of fine-grained soils are greatly reduced, fine tailings sand is solid to make the dam stable and seepage conditions are well improved; the immersing line of the dam descends. In addition, the stability and liquefaction resistance of tailings dams are strengthened remarkably. The interior stress is compressive stress, stress level of every element is less than 1.0 and safety coefficient of every element is greater than 1.0. The safety coefficient against liquefaction of every element of tailings dams is greater than 1.5 according to the analysis of seismic response by finite element method.展开更多
基金Projects(52104355,52074363,52374364)supported by the National Natural Science Foundation of ChinaProject(2023YFC2907904)supported by the National Key R&D Program of China。
文摘Traditional pyrometallurgical and hydrometallurgical methods to extract bismuth from sulfide ores face problems such as high cost,low-concentration SO_(2)generation,and long process time.In this study,the cyclone technology and slurry electrolysis method were combined.The bismuth sulfide ore was dissolved directly at the anode,while the high purity bismuth was deposited efficiently at the cathode under the advantages of the two methods.The short process and high-efficiency extraction of bismuth sulfide ore were realized,and the pollution of low-concentration SO_(2)was avoided.Then,the effects of several crucial experimental conditions(current density,reaction time,temperature,pH,liquid-solid ratio,and circulation flow rate)on the leaching efficiency and recovery efficiency of bismuth were investigated.The leaching and electrowinning mechanisms during the recovery process were also analyzed according to the research results of this paper to better understand the cyclone slurry electrolysis process.The experimental results showed that 95.19%bismuth was leached into the acid solution in the anode area under optimal conditions,and the recovery efficiency and purity of bismuth on the cathode reached 91.13%and 99.26%,respectively,which were better than those by the traditional hydrometallurgy recovery process.
文摘A new technique of combining accretion by cyclone separator and scattertube for tailings dams was developed according to laboratory experiment, model experiment and spot experiment technology. Three tailings dams were successfully constructed by the new technique. The results of engineering geological exploration, static and dynamic test and stability analysis on Baizhishan tailings dams prove that the new technique improves structure and stability of the dams and working conditions compared with the traditional technique. The thin layers of fine-grained soils are greatly reduced, fine tailings sand is solid to make the dam stable and seepage conditions are well improved; the immersing line of the dam descends. In addition, the stability and liquefaction resistance of tailings dams are strengthened remarkably. The interior stress is compressive stress, stress level of every element is less than 1.0 and safety coefficient of every element is greater than 1.0. The safety coefficient against liquefaction of every element of tailings dams is greater than 1.5 according to the analysis of seismic response by finite element method.