Different forest fires causing different degrees of effects occur in fire-sensitive forests due to various reasons such as climate change.Useful as well as harmful aspects of forest fires are a multi-disciplinary rese...Different forest fires causing different degrees of effects occur in fire-sensitive forests due to various reasons such as climate change.Useful as well as harmful aspects of forest fires are a multi-disciplinary research topic.Geographical information systems(GIS)and remote sensing(RS)methods offer a number of benefits for researchers and operators in the field of forest fire research.The present study analyses timber pricing based on forest contractor demands of post-salvage logging processes.The effect of timber obtained from compartment units on producers’pricing policy was modelled.Sapadere forest fire area(2500 ha)located in Antalya in Turkey was selected as the main study area.Topography parameters(aspect,slope and slope position),stand types(diameter class and crown closure),and burn severity were analyzed together using GIS and R software packages.A multi-linear regression model(R^(2)=0.752)demonstrated that factors that had the most impact on pricing were slope position,aspect,stand age,crown closure and burn severity.This model can be used to estimate salvage logging prices in Calabrian pine(Pinus brutia Ten.)stands with similar parameters.Forest administrators and contractors may readily address the unit price of timber by estimating approximate costs in a given forest area for which they are going to bid.This will help reduce operational planning times of harvesting procedures in burned stands.展开更多
In parametric cost estimating, objections to using statistical Cost Estimating Relationships (CERs) and parametric models include problems of low statistical significance due to limited data points, biases in the un...In parametric cost estimating, objections to using statistical Cost Estimating Relationships (CERs) and parametric models include problems of low statistical significance due to limited data points, biases in the underlying data, and lack of robustness. Soft Computing (SC) technologies are used for building intelligent cost models. The SC models are systemically evaluated based on their training and prediction of the historical cost data of airborne avionics systems. Results indicating the strengths and weakness of each model are presented. In general, the intelligent cost models have higher prediction precision, better data adaptability, and stronger self-learning capability than the regression CERs.展开更多
Refinery complexity quantifies the sophistication and capital intensity of a refinery and has found widespread application in facility classification, cost estimation, sales price models, and other uses. Despite the u...Refinery complexity quantifies the sophistication and capital intensity of a refinery and has found widespread application in facility classification, cost estimation, sales price models, and other uses. Despite the ubiquity and widespread use of refining complexity, however, surprisingly little material has been written on its applications. The pur- pose of this review is to describe the primary applications of refinery complexity and some recent extensions. A secondary purpose of this review is to provide a framework that unifies complexity applications and suggests avenues for future research. Examples illustrate the applications considered.展开更多
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern...The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.展开更多
文摘Different forest fires causing different degrees of effects occur in fire-sensitive forests due to various reasons such as climate change.Useful as well as harmful aspects of forest fires are a multi-disciplinary research topic.Geographical information systems(GIS)and remote sensing(RS)methods offer a number of benefits for researchers and operators in the field of forest fire research.The present study analyses timber pricing based on forest contractor demands of post-salvage logging processes.The effect of timber obtained from compartment units on producers’pricing policy was modelled.Sapadere forest fire area(2500 ha)located in Antalya in Turkey was selected as the main study area.Topography parameters(aspect,slope and slope position),stand types(diameter class and crown closure),and burn severity were analyzed together using GIS and R software packages.A multi-linear regression model(R^(2)=0.752)demonstrated that factors that had the most impact on pricing were slope position,aspect,stand age,crown closure and burn severity.This model can be used to estimate salvage logging prices in Calabrian pine(Pinus brutia Ten.)stands with similar parameters.Forest administrators and contractors may readily address the unit price of timber by estimating approximate costs in a given forest area for which they are going to bid.This will help reduce operational planning times of harvesting procedures in burned stands.
文摘In parametric cost estimating, objections to using statistical Cost Estimating Relationships (CERs) and parametric models include problems of low statistical significance due to limited data points, biases in the underlying data, and lack of robustness. Soft Computing (SC) technologies are used for building intelligent cost models. The SC models are systemically evaluated based on their training and prediction of the historical cost data of airborne avionics systems. Results indicating the strengths and weakness of each model are presented. In general, the intelligent cost models have higher prediction precision, better data adaptability, and stronger self-learning capability than the regression CERs.
文摘Refinery complexity quantifies the sophistication and capital intensity of a refinery and has found widespread application in facility classification, cost estimation, sales price models, and other uses. Despite the ubiquity and widespread use of refining complexity, however, surprisingly little material has been written on its applications. The pur- pose of this review is to describe the primary applications of refinery complexity and some recent extensions. A secondary purpose of this review is to provide a framework that unifies complexity applications and suggests avenues for future research. Examples illustrate the applications considered.
基金herein for allowing the use of various data from the LBJ Project in the development of this paper
文摘The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.