期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Hybrid algorithm for project scheduling with capacity constraint 被引量:1
1
作者 Cheng Xu Wu Cheng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第5期1041-1046,共6页
Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-lev... Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-level scheduling and project decomposition technology, and the genetic algorithm and tabu search is combined. Topological reordering technology is used to improve the efficiency of evaluation. Simulation results show the proposed algorithm can obtain satisfied scheduling results in acceptable time. 展开更多
关键词 project scheduling capacity constraint heuristic algorithm bi-level scheduling.
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部