In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(...In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.展开更多
A comprehensive assessment index system was established. The mechanical recycling process of printed circuit board was evaluated according to the comprehensive evaluation index system using the fuzzy analytic hierarch...A comprehensive assessment index system was established. The mechanical recycling process of printed circuit board was evaluated according to the comprehensive evaluation index system using the fuzzy analytic hierarchy process. A process assessment software system of mechanical recycling was established to evaluate different recycling technologies. And the software system was developed in the environment of VB6.0 and Access2000.展开更多
The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk...The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk assessment of power transformer which is very significant to improve the reliability of the power system,a fuzzy comprehensive risk assessment model of power transformer based on Borda number theory is proposed in this paper.At first,the fault types and risk factors of the power transformer are analyzed.Secondly,the basic framework of the fuzzy comprehensive evaluation is applied to quantify the risk factors.And then,Borda number theory is employed to analyze influence degree and occurrence probability of power transformer.At last,the various risk factors impact index and fuzzy comprehensive evaluation index of power transformer can be easily obtained.Applying this model,the relative importance degree of the risk factors can be horizontally compared according to the numerical index,the engineering staff can directly get the parameters of the transformer risk level and get a good description of the visual expression through using 5 score and similar visual language.展开更多
氢电混动汽车(fuel-cell hybrid electric vehicles,FCHEV)的出现有效促进了能源-交通系统的绿色低碳转型。现阶段关于FCHEV的研究主要集中在能量管理和控制策略上,较少关注灵活性潜力评估方面,为此,提出了一种计及车主充能意愿差异性的...氢电混动汽车(fuel-cell hybrid electric vehicles,FCHEV)的出现有效促进了能源-交通系统的绿色低碳转型。现阶段关于FCHEV的研究主要集中在能量管理和控制策略上,较少关注灵活性潜力评估方面,为此,提出了一种计及车主充能意愿差异性的FCHEV集群灵活性潜力评估方法。首先,建立城市交通路网模型模拟FCHEV的出行特征,进而建立单体FCHEV充能模型;其次,利用改进层次分析法并结合熵权法建立车主充能意愿综合评价体系,并综合考虑禀赋效应和环保意识对车主响应意愿度的影响;最后,建立FCHEV集群灵活性潜力评估模型,求解得出潜力评估结果。仿真结果表明,所提方法在评估过程中能够合理刻画车主充能意愿的差异性,并有效提高集群参与优化调度时系统的灵活性。展开更多
基金Project(50977003) supported by the National Natural Science Foundation of China
文摘In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.
文摘A comprehensive assessment index system was established. The mechanical recycling process of printed circuit board was evaluated according to the comprehensive evaluation index system using the fuzzy analytic hierarchy process. A process assessment software system of mechanical recycling was established to evaluate different recycling technologies. And the software system was developed in the environment of VB6.0 and Access2000.
基金Project Supported by National Natural Science Foundation of China (50425722), Natural Science Foundation of CQ CSTC (Chongqing Science and Technology Commission) (2008BA3026).
文摘The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk assessment of power transformer which is very significant to improve the reliability of the power system,a fuzzy comprehensive risk assessment model of power transformer based on Borda number theory is proposed in this paper.At first,the fault types and risk factors of the power transformer are analyzed.Secondly,the basic framework of the fuzzy comprehensive evaluation is applied to quantify the risk factors.And then,Borda number theory is employed to analyze influence degree and occurrence probability of power transformer.At last,the various risk factors impact index and fuzzy comprehensive evaluation index of power transformer can be easily obtained.Applying this model,the relative importance degree of the risk factors can be horizontally compared according to the numerical index,the engineering staff can directly get the parameters of the transformer risk level and get a good description of the visual expression through using 5 score and similar visual language.
文摘氢电混动汽车(fuel-cell hybrid electric vehicles,FCHEV)的出现有效促进了能源-交通系统的绿色低碳转型。现阶段关于FCHEV的研究主要集中在能量管理和控制策略上,较少关注灵活性潜力评估方面,为此,提出了一种计及车主充能意愿差异性的FCHEV集群灵活性潜力评估方法。首先,建立城市交通路网模型模拟FCHEV的出行特征,进而建立单体FCHEV充能模型;其次,利用改进层次分析法并结合熵权法建立车主充能意愿综合评价体系,并综合考虑禀赋效应和环保意识对车主响应意愿度的影响;最后,建立FCHEV集群灵活性潜力评估模型,求解得出潜力评估结果。仿真结果表明,所提方法在评估过程中能够合理刻画车主充能意愿的差异性,并有效提高集群参与优化调度时系统的灵活性。