期刊文献+
共找到32篇文章
< 1 2 >
每页显示 20 50 100
Elastoplastic bridge deck response spectra of high-speed railway simply-supported girder bridge with CRTS Ⅱ track system 被引量:1
1
作者 LIU Bo-lun HE Chang +2 位作者 LAI Zhi-peng JIANG Li-zhong LI Dong-ping 《Journal of Central South University》 CSCD 2024年第11期4174-4186,共13页
The seismic damage to ancillary facilities on high-speed railway(HSR)bridges can affect the normal movement of trains.To propose the bridge deck acceleration response spectra of the typical HSR simply-supported girder... The seismic damage to ancillary facilities on high-speed railway(HSR)bridges can affect the normal movement of trains.To propose the bridge deck acceleration response spectra of the typical HSR simply-supported girder bridge for simplifying the seismic responses analysis of the facilities on bridges,the finite element models of the HSR multi-span simply-supported girder bridges with CRTSII track were established,and the numerical model was validated by tests.Besides,the effects of the span number,peak ground acceleration(PGA),pier height on the seismic acceleration and response spectra of the bridge deck were investigated.Afterward,the bridge acceleration amplification factor curves and bridge deck response spectra with different PGAs and pier heights were obtained.The formula for bridge deck acceleration amplification factor,with a 95%guarantee rate,was fitted.Moreover,the finite element models of the overhead contact lines(OCL)mounted on rigid base and bridges were established to validate the fitted formula.The results indicated that the maximum seismic acceleration response is in the midspan of the beam.The proposed formula for the bridge deck acceleration response spectra can be used to analyze the earthquake response of the OCL and other ancillary facilities on HSR simply-supported girder bridges.The bridge deck acceleration response spectra are conservative in terms of structural safety and can significantly improving the analysis efficiency. 展开更多
关键词 high-speed railway CRT SⅡtrack-bridge system bridge deck acceleration response spectra overhead contact line seismic amplification effect
在线阅读 下载PDF
Influence of pier height on the safety of trains running on high-speed railway bridges during earthquakes
2
作者 NIE Yu-tao GUO Wei +8 位作者 JIANG Li-zhong YU Zhi-wu ZENG Chen WANG Yang HE Xu-en REN Shao-xun HUANG Ren-qiang LIANG Guang-yue LI Chang-qing 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第6期2102-2115,共14页
Sudden earthquakes pose a threat to the running safety of trains on high-speed railway bridges,and the stiffness of piers is one of the factors affecting the dynamic response of train-track-bridge system.In this paper... Sudden earthquakes pose a threat to the running safety of trains on high-speed railway bridges,and the stiffness of piers is one of the factors affecting the dynamic response of train-track-bridge system.In this paper,a experiment of a train running on a high-speed railway bridge is performed based on a dynamic experiment system,and the corresponding numerical model is established.The reliability of the numerical model is verified by experiments.Then,the experiment and numerical data are analyzed to reveal the pier height effects on the running safety of trains on bridges.The results show that when the pier height changes,the frequency of the bridge below the 30 m pier height changes greater;the increase of pier height causes the transverse fundamental frequency of the bridge close to that of the train,and the shaking angle and lateral displacement of the train are the largest for bridge with 50 m pier,which increases the risk of derailment;with the pier height increases from 8 m to 50 m,the derailment coefficient obtained by numerical simulations increases by 75% on average,and the spectral intensity obtained by experiments increases by 120% on average,two indicators exhibit logarithmic variation. 展开更多
关键词 pier height high-speed railway bridge running safety numerical model
在线阅读 下载PDF
Innovative approaches in high-speed railway bridge model simplification for enhanced computational efficiency
3
作者 ZHOU Wang-bao XIONG Li-jun +1 位作者 JIANG Li-zhong ZHONG Bu-fan 《Journal of Central South University》 CSCD 2024年第11期4203-4217,共15页
In the realm of high-speed railway bridge engineering,managing the intricacies of the track-bridge system model(TBSM)during seismic events remains a formidable challenge.This study pioneers an innovative approach by p... In the realm of high-speed railway bridge engineering,managing the intricacies of the track-bridge system model(TBSM)during seismic events remains a formidable challenge.This study pioneers an innovative approach by presenting a simplified bridge model(SBM)optimized for both computational efficiency and precise representation,a seminal contribution to the engineering design landscape.Central to this innovation is a novel model-updating methodology that synergistically melds artificial neural networks with an augmented particle swarm optimization.The neural networks adeptly map update parameters to seismic responses,while enhancements to the particle swarm algorithm’s inertial and learning weights lead to superior SBM parameter updates.Verification via a 4-span high-speed railway bridge revealed that the optimized SBM and TBSM exhibit a highly consistent structural natural period and seismic response,with errors controlled within 7%.Additionally,the computational efficiency improved by over 100%.Leveraging the peak displacement and shear force residuals from the seismic TBSM and SBM as optimization objectives,SBM parameters are adeptly revised.Furthermore,the incorporation of elastoplastic springs at the beam ends of the simplified model effectively captures the additional mass,stiffness,and constraint effects exerted by the track system on the bridge structure. 展开更多
关键词 high-speed railway bridge engineering track-bridge system model simplified bridge model artificial neural networks particle swarm optimization seismic analysis
在线阅读 下载PDF
Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges 被引量:33
4
作者 戴公连 闫斌 《Journal of Central South University》 SCIE EI CAS 2012年第8期2348-2353,共6页
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini... A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment. 展开更多
关键词 high-speed railway continuously welded track cable-stayed bridge simply-supported beam
在线阅读 下载PDF
Beam-track interaction of high-speed railway bridge with ballast track 被引量:19
5
作者 闫斌 戴公连 张华平 《Journal of Central South University》 SCIE EI CAS 2012年第5期1447-1453,共7页
Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast trac... Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement. 展开更多
关键词 high-speed railway beam-track interaction ballast track rail longitudinal force continuous beam
在线阅读 下载PDF
Applicability of small resistance fastener on long-span continuous bridges of high-speed railway 被引量:21
6
作者 戴公连 刘文硕 《Journal of Central South University》 SCIE EI CAS 2013年第5期1426-1433,共8页
Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Bas... Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Based on the HSR long-span continuous bridges, the integrative spatial finite element model of track-bridge-pier-foundation system was established with the nonlinear spring element simulating the longitudinal resistance between track and bridge. Comparative study on the various additional longitudinal forces of CWR using the common fasteners and small resistance fasteners was carried out. Analysis results indicate that the additional expansion forces and additional rail-breaking forces in long-span ballastless continuous girders can be reduced evidently by 40% 50% after adopting small resistance fasteners, but lead to greater rail broken gap. The small resistance fasteners have little influence on the additional force only caused by vertical load, but can reduce the additional force caused by vertical load combined with braking load by over 10%. Besides, transient analysis method is proved to be more accurate and safe in calculating additional longitudinal forces when the train running or braking on the bridge, compared with the traditional static method. 展开更多
关键词 ballastless track small resistance fasteners additional longitudinal force long-span continuous beam high-speed railway
在线阅读 下载PDF
Dynamic response limit of high-speed railway bridge under earthquake considering running safety performance of train 被引量:16
7
作者 LIU Xiang JIANG Li-zhong +3 位作者 XIANG Ping LAI Zhi-peng FENG Yu-lin CAO Shan-shan 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第3期968-980,共13页
Due to the wide railway network and different characteristics of many earthquake zones in China,considering the running safety performance of trains(RSPT)in the design of high-speed railway bridge structures is very n... Due to the wide railway network and different characteristics of many earthquake zones in China,considering the running safety performance of trains(RSPT)in the design of high-speed railway bridge structures is very necessary.In this study,in order to provide the seismic design and evaluation measure of the bridge structure based on the RSPT,a calculation model of RSPT on bridge under earthquake was established,and the track surface response measure when the derailment coefficient reaches the limit value was calculated by referring to 15 commonly used ground motion(GM)intensity measures.Based on the coefficient of variation of the limit value obtained from multiple GM samples,the optimal measures were selected.Finally,the limit value of bridge seismic response based on RSPT with different train speeds and structural periods was determined. 展开更多
关键词 high-speed railway bridge seismic design running safety performance measure limit
在线阅读 下载PDF
Near-fault directivity pulse-like ground motion effect on high-speed railway bridge 被引量:10
8
作者 陈令坤 张楠 +3 位作者 蒋丽忠 曾志平 陈格威 国巍 《Journal of Central South University》 SCIE EI CAS 2014年第6期2425-2436,共12页
The vehicle-track-bridge(VTB)element was used to investigate how a high-speed railway bridge reacted when it was subjected to near-fault directivity pulse-like ground motions.Based on the PEER NAG Strong Ground Motion... The vehicle-track-bridge(VTB)element was used to investigate how a high-speed railway bridge reacted when it was subjected to near-fault directivity pulse-like ground motions.Based on the PEER NAG Strong Ground Motion Database,the spatial analysis model of a vehicle-bridge system was developed,the VTB element was derived to simulate the interaction of train and bridge,and the elasto-plastic seismic responses of the bridge were calculated.The calculation results show that girder and pier top displacement,and bending moment of the pier base increase subjected to near-fault directivity pulse-like ground motion compared to far-field earthquakes,and the greater deformation responses in near-fault shaking are associated with fewer reversed cycles of loading.The hysteretic characteristics of the pier subjected to a near-fault directivity pulse-like earthquake should be explicitly expressed as the bending moment-rotation relationship of the pier base,which is characterized by the centrally strengthened hysteretic cycles at some point of the loading time-history curve.The results show that there is an amplification of the vertical deflection in the girder's mid-span owing to the high vertical ground motion.In light of these findings,the effect of the vertical ground motion should be used to adjust the unconservative amplification constant 2/3 of the vertical-to-horizontal peak ground motion ratio in the seismic design of bridge. 展开更多
关键词 ELEMENT near-fault ground motion directivity pulse high-speed railway bridge earthquake response
在线阅读 下载PDF
A computational method for post-construction settlement of high-speed railway bridge pile foundation considering soil creep effect 被引量:12
9
作者 冯胜洋 魏丽敏 +1 位作者 何重阳 何群 《Journal of Central South University》 SCIE EI CAS 2014年第7期2921-2927,共7页
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th... Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation. 展开更多
关键词 high-speed railway bridge pile foundation post-construction settlement Mesri creep model simplified computational method
在线阅读 下载PDF
Sensitive factors research for track-bridge interaction of Long-span X-style steel-box arch bridge on high-speed railway 被引量:9
10
作者 刘文硕 戴公连 何旭辉 《Journal of Central South University》 SCIE EI CAS 2013年第11期3314-3323,共10页
X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch b... X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch bridge with a main span of450 m on HSR under construction for example,a new integrative mechanic model of rail-stringer-cross beam-suspenderpier-foundation coupling system was established,adopting the nonlinear spring element simulating the longitudinal resistance between track and bridge.The transmission law of continuous welded rail(CWR)on the X-style arch bridge was researched,and comparative study was carried out to discuss the influence of several sensitive factors,such as the temperature load case,the longitudinal resistance model,the scheme of longitudinal restraint conditions,the introverted inclination of arch rib,the stiffness of pier and abutment and the location of the rail expansion device.Calculating results indicate that the longitudinal resistance has a significant impact upon the longitudinal forces of CWR on this kind of bridge,while the arch rib’s inclination has little effect.Besides,temperature variation of arch ribs and suspenders should be taken into account in the calculation.Selecting the restraint system without longitudinally-fixed bearing and setting the rail expansion devices on both ends are more reasonable. 展开更多
关键词 high-speed railway track-bridge interaction X-style steel-box arch bridge continuous welded rail
在线阅读 下载PDF
Parametric analysis on buffeting performance of a long-span high-speed railway suspension bridge 被引量:6
11
作者 ZHAO Kai-yong WANG Hao +2 位作者 TAO Tian-you GAO Hui WU Tong 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2574-2588,共15页
The buffeting performance of kilometer-level high-speed railway suspension bridges has a great impact on the smooth operation of high-speed trains.To investigate the buffeting performance of the structure significantl... The buffeting performance of kilometer-level high-speed railway suspension bridges has a great impact on the smooth operation of high-speed trains.To investigate the buffeting performance of the structure significantly different from traditional suspension bridges,the first long-span high-speed railway suspension bridge,Wufengshan Yangtze River Bridge(WYRB),is taken as a numerical example to demonstrate the effects of structural parameters and wind field parameters on the buffeting responses.Based on the design information,the spatial finite element model(FEM)of WYRB is established before testing its accuracy.The fluctuating wind fields are simulated via both classical and stochastic wave based spectral representation method(SRM).Finite element method is further taken to analyze the parametric sensitivity on wind induced buffeting responses in time domain.The results show that the vertical displacement is more sensitive to the changing dead load than the lateral and torsional ones.The larger stiffness of the main girder and the lower sag-to-span ratio are both helpful to reduce the buffeting responses.Wind spectrum and coherence function are key influencing factors to the responses so setting proper wind field parameters are essential in the wind-resistant design stage.The analytical results can provide references for wind resistance analysis and selection of structural and fluctuating wind field parameters for similar long-span high-speed railway suspension bridges. 展开更多
关键词 high-speed railway suspension bridge buffeting performance numerical analysis parametric analysis wind field simulation
在线阅读 下载PDF
Parameters studies for rail wear in high-speed railway turnouts by unreplicated saturated factorial design 被引量:4
12
作者 XU Jing-mang WANG Ping +2 位作者 MA Xiao-chuan QIAN Yao CHEN Rong 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第4期988-1001,共14页
Rail wear is one of the main reasons for reducing the service life of high-speed railway turnouts in China. The rail wear characteristics of high-speed railway turnouts are influenced by a large number of input parame... Rail wear is one of the main reasons for reducing the service life of high-speed railway turnouts in China. The rail wear characteristics of high-speed railway turnouts are influenced by a large number of input parameters of the complex train-turnout system. To reproduce the actual operation conditions of railway turnouts, random distributions of these inputs need to be considered in rail wear simulation. For a given nominal layout of the high-speed railway turnout, 19 input parameters for rail wear simulation in high-speed railway turnouts are investigated based on orthogonal design of experiment. Three dynamic responses(wheel-rail friction work, normal contact force and size of contact patch) are defined as observed values and the significant factors(direction of passage, axle load, running speed, friction coefficient, and wheel and rail profiles) are determined by two unreplicated saturated factorial design methods, including the half-normal probability plot method and Dong 93 method. As part of the associated rail wear simulation, the influence of the wear models and the local elastic deformation on the rail wear was separately investigated. The calculation results for the wear models are quite different, especially for large creep mode. The local elastic deformation has a large effect on the sliding speed and rail wear and needs to be considered in the rail wear simulation. 展开更多
关键词 high-speed railway turnouts RAIL WEAR unreplicated saturated FACTORIAL design WEAR simulation
在线阅读 下载PDF
Environmental impact evaluation for high-speed railway 被引量:4
13
作者 宋晓东 付延冰 +1 位作者 陈治亚 刘恒斌 《Journal of Central South University》 SCIE EI CAS 2014年第6期2366-2371,共6页
Environmental impact evaluation system boundary of high-speed railway was defined based on the total life cycle theory,and the index system to evaluate the environmental impact of high-speed railway was established wi... Environmental impact evaluation system boundary of high-speed railway was defined based on the total life cycle theory,and the index system to evaluate the environmental impact of high-speed railway was established with the fuzzy analytic hierarchy method,and the matter-element evaluation model was established on the basis of the extension theory.By calculating its comprehensive interrelatedness,the evaluation rank of environment impacts of high-speed railway was determined.The numerical example shows that the model has vast prospect,which can not only expand the application areas of extension theory,but also change the traditional evaluation methods and provide new ideas and means for environmental impact evaluation of high-speed railway. 展开更多
关键词 high-speed railway life cycle environmental impact EVALUATION MATTER-ELEMENT
在线阅读 下载PDF
Fatigue life evaluation on key components of high-speed railway catenary system 被引量:6
14
作者 QI Guang-feng XIAO Xiao-hui +1 位作者 ZHAO Hui CHEN Jian-fang 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第8期1958-1965,共8页
The fatigue load spectrum and operation life evaluation of key components in the catenary system under the high speed train running condition were investigated.Firstly,based on the catenary model and pantograph model,... The fatigue load spectrum and operation life evaluation of key components in the catenary system under the high speed train running condition were investigated.Firstly,based on the catenary model and pantograph model,the couple dynamic equations of pantograph–catenary were built with the Lagrange’s method;then the dynamic contact force was obtained by the Newmark method at the train speeds of 250,280 and 300 km/h,respectively.Secondly,the finite element model(FEM)of one anchor section’s catenary was built to analyze its transient response under the contact force as train running;then the loading time history of messenger wire base,steady arm,registration tube,oblique cantilever,and straight cantilever were extracted.Finally,the key components’fatigue spectrum was carried out by the rain-flow counting method,and operation life was estimated in consideration of such coefficients,such as stress concentration,shape and dimension,surface treatment.The results show that the fatigue life of the catenary system reduces with the increasing of train speed;specifically,the evaluated fatigue life of the steady arm is shorter than other components. 展开更多
关键词 fatigue spectrum fatigue life evaluation pantograph–catenary’s contact force high-speed railway
在线阅读 下载PDF
Structure and behavior of floor system of two super high-speed railway Changjiang composite bridges 被引量:4
15
作者 张晔芝 张敏 《Journal of Central South University》 SCIE EI CAS 2011年第2期542-549,共8页
Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large brid... Wuhan Tianxingzhou Changjiang (WTC) Bridge and Nanjing Dashengguan Changjiang (NDC) Bridge are two super high-speed railway 3-trusses composite bridges. This is the first time of using three trusses in such large bridges in the world. These two types of railway floor systems of the two bridges have never been used in China before. The problem how to conform the deformations and stress levels of the railway floor system of WTC Bridge was studied. After finite element analysis and comparison,the plan of arranging one expansion stringer every two panels in railway floor system were proposed and good effect was obtained. Because of the application of three trusses,the allocation of the loads acted on the deck in three trusses is different and varies in different places of NDC Bridge. This problem was studied by model experiment and 3D finite element analysis. The results of 3D FEM analysis coincide with the model test results. The allocation rule of the loads acting on the deck in three trusses was presented. Because of the application of monolithic decks,the stiffness and structural integrity of NDC Bridge are high. 展开更多
关键词 high-speed railway composite mechanics characteristics floor system Wuhan Tianxingzhou Changjiang Bridge Nanjing Dashengguan Changjiang Bridge
在线阅读 下载PDF
Regression model for daily passenger volume of high-speed railway line under capacity constraint 被引量:2
16
作者 骆泳吉 刘军 +1 位作者 孙迅 赖晴鹰 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第9期3666-3676,共11页
A non-linear regression model is proposed to forecast the aggregated passenger volume of Beijing-Shanghai high-speed railway(HSR) line in China. Train services and temporal features of passenger volume are studied to ... A non-linear regression model is proposed to forecast the aggregated passenger volume of Beijing-Shanghai high-speed railway(HSR) line in China. Train services and temporal features of passenger volume are studied to have a prior knowledge about this high-speed railway line. Then, based on a theoretical curve that depicts the relationship among passenger demand, transportation capacity and passenger volume, a non-linear regression model is established with consideration of the effect of capacity constraint. Through experiments, it is found that the proposed model can perform better in both forecasting accuracy and stability compared with linear regression models and back-propagation neural networks. In addition to the forecasting ability, with a definite formation, the proposed model can be further used to forecast the effects of train planning policies. 展开更多
关键词 high-speed rail Jinghu high-speed railway(HSR) DEMAND capacity forecasting
在线阅读 下载PDF
Numerical calculation on solar temperature field of a cable-stayed bridge with U-shaped section on high-speed railway 被引量:3
17
作者 刘文硕 戴公连 饶少臣 《Journal of Central South University》 SCIE EI CAS 2014年第8期3345-3352,共8页
Based on transient temperature field theory of heat conduction, the solar temperature field calculation model of U-shape sectioned high-speed railway cable-stayed bridge under actions of concrete beams and ballast was... Based on transient temperature field theory of heat conduction, the solar temperature field calculation model of U-shape sectioned high-speed railway cable-stayed bridge under actions of concrete beams and ballast was established. Using parametric programming language, finite element calculation modules considering climate conditions, bridge site, structure dimension and material thermophysical properties were compiled. Six standard day cycles with the strongest yearly radiation among the bridge sites were selected for sectional solar temperature field calculation and temperature distributions under different temperature-sensitive parameters were compared. The results show that under the influence of sunshine, U-shape section of the beam shows obvious nonlinear distribution characteristics and the maximum cross-section temperature difference is more than 21℃; the ballast significantly reduces sunshine temperature difference of the beam and temperature peak of the bottom margin lags with the increase of ballast thickness; the maximum cross-section vertical temperature gradient appears in summer while large transverse temperature difference appears in winter. 展开更多
关键词 high-speed railway cable-stayed bridge U-shaped section solar temperature field thermal analysis
在线阅读 下载PDF
Length optimization of straight line connecting turnout on main line in high-speed railway station yard
18
作者 YIN Guo-dong SHI Jin +1 位作者 WEI Qing-chao LAI Lin 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第5期1111-1120,共10页
Taking the development of high-speed railway in China as background, and referring to the dynamic theory and wheel-rail contact mode, dynamic analysis model was established, considering the setting position of straigh... Taking the development of high-speed railway in China as background, and referring to the dynamic theory and wheel-rail contact mode, dynamic analysis model was established, considering the setting position of straight lines and running conditions of train in high-speed railway station yard. Using the established model, and choosing vehicle lateral acceleration and wheel suspension as the evaluation indexes, dynamic characteristic of vehicle traveling in turnout and adjacent area on main line was analyzed, and effects on travelling safety and stability of train aroused by length variation of straight lines were calculated based on analyzing the damping rules of vibration. The results show that, a certain length of straight lines can alleviate the vibration aroused in turnout and curve(turnout), length of straight lines connecting turnouts in different sections on main line was proposed to meet the demand of traveling stability, and shortening or cancelation of straight line for the scale limitation of station yard has less influence on operation safety of train. 展开更多
关键词 high-speed railway station YARD STRAIGHT line TURNOUT dynamic theory LENGTH OPTIMIZATION
在线阅读 下载PDF
Installation position determination of wind speed sensors on steel pole along a high-speed railway
19
作者 熊小慧 梁习锋 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第11期3018-3027,共10页
In order to consider the influence of steel pole on the measurement of wind speed sensors and determinate the installation position of wind speed sensors, the flow field around wind speed sensors was investigated. Bas... In order to consider the influence of steel pole on the measurement of wind speed sensors and determinate the installation position of wind speed sensors, the flow field around wind speed sensors was investigated. Based on the three-dimensional steady Reynolds-averaged Navier-Stokes equations and k-ε double equations turbulent model, the field flow around the wind speed sensor and the steel pole along a high-speed railway was simulated on an unstructured grid. The grid-independent validation was conducted and the accuracy of the present numerical simulation method was validated by experiments and simulations carried out by previous researchers. Results show that the steel pole has a significant influence on the measurement results of wind speed sensors. As the distance between two wind speed sensors is varied from 0.3 to 1.0 m, the impact angles are less than ±20°, it is proposed that the distance between two wind speed sensors is 0.8 m at least, and the interval between wind speed sensors and the steel pole is more than 1.0 m with the sensors located on the upstream side. 展开更多
关键词 high-speed railway wind speed sensor steel pole numerical simulation flow field
在线阅读 下载PDF
Review of aerodynamics of high-speed train-bridge system in crosswinds 被引量:22
20
作者 HE Xu-hui LI Huan 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第4期1054-1073,共20页
Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China.Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodyna... Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China.Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodynamic assessment,this paper primarily reviews five meaningful progresses on the aerodynamics of the train-bridge system done by Wind Tunnel Laboratory of Central South University in the past several years.Firstly,the flow around the train and the uncertainty origin of the aerodynamic assessment are described from the fluid mechanism point of view.After a brief introduction of the current aerodynamic assessment methods with their strengths and weaknesses,a new-developed TRAIN-INFRASTRUCTURE rig with the maximum launch speed of 35 m/s is introduced.Then,several benchmark studies are presented,including the statistic results of the characterized geometry parameters of the currently utilized bridge-decks,the aerodynamics of the train,and the aerodynamics of the flat box/truss bridge-decks.Upon compared with the foregoing mentioned benchmarks,this paper highlights the aerodynamic interference of the train-bridge system associated with its physical natures.Finally,a porosity-and orientation-adjustable novel wind barrier with its effects on the aerodynamics of the train-bridge system is discussed. 展开更多
关键词 high-speed railway train-bridge system wind barrier crosswinds aerodynamic assessment wind tunnel test
在线阅读 下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部