A formula for the calculation of critical shear stress of non-uniform sediment was developed by on river bed has been established while considering the relative degree expose of grains.The values of the Coeffi- cients...A formula for the calculation of critical shear stress of non-uniform sediment was developed by on river bed has been established while considering the relative degree expose of grains.The values of the Coeffi- cients in the formula have been obtained.The formula has been verified with prototype observation data, flumes data of both nature and lightweight sand.The computed results fully reflect the characteristics of thresh- old motion of non-uniform sediment.The result have been used in some physical mo...展开更多
Water projects’ sediment deposition problems always cause widespread concerns. The gravity of them varies in accordance not only with reservoirs’ natural and socio-economic characteristics but also with their modes ...Water projects’ sediment deposition problems always cause widespread concerns. The gravity of them varies in accordance not only with reservoirs’ natural and socio-economic characteristics but also with their modes of operation. The unique characteristics, configuration and mode of operation of Three Gorges Project (TGP) reservoir are compared with those of several existing large reservoirs in this paper. As many reservoirs are troubling environment by gradually extending coarse sediment deposition at the uppermost end of fluctuating backwater region toward upstream, Gezhouba reservoir on Yangtze and Danjiangkou reservoir on Hanjiang have shown no trace of such upstream extension of sediment deposition in relevant prototype observation data for the past 20 and more years. TGP reservoir’s in-coming flow sediment conditions and configuration in plane are almost the same as those of Gezhouba reservoir, and TGP reservoir’s mode of operation(usually keeping a very low pool level for flood control in flood season and storing up in-coming flow only thenceafter) is similar to that of Danjiangkou reservoir. New findings of sediment research and prototype flow sediment investigations as well as new agenda of large hydro projects’ construction on Jinshajiang in nearest future assure the prospects of TGP sediment handling.展开更多
Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it...Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice.展开更多
With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference...With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.展开更多
The new county-seat town of Badong in the reservoir area of the Three Gorges Project is located on a huge arcuate slope with a convex bank toward north. The slope is cut by a fault, Badong fault, trending in east-west...The new county-seat town of Badong in the reservoir area of the Three Gorges Project is located on a huge arcuate slope with a convex bank toward north. The slope is cut by a fault, Badong fault, trending in east-west in its back part. It is concerned if the huge arcuate slope is related to mass rock creep, and what is the role of the Badong fault in the formation of the huge arc slope? The Badong fault was put into main consideration in this paper. The data from field investigation were reviewed. Three main features of the Badong fault were summarized: a bedding fault between the Jialingjiang formation (T\-1j) and Badong formation (T\-2b), breccias with compound component, and multiple stages of activity. It was proposed that most of the breccias were formed by fracture-filling. To understand the state of stress and behavior of deformation of the fault during the incision of the Yangtze River as well as the initiation and development of the slope, numerical simulation was conducted. Results indicate that there is a tensional stress zone in the upper part of the fault, and that activity of the fault is dominated by bedding sliding. Opening was also noted in the upper part of the fault in the late periods. The results are consistent with the field observation of the fault. The displacement in the slope is small, which makes us conclude that there is no certain relation between the formation of the arcuate slope and the Badong fault.展开更多
The construction of the TGP has proceeded smoothly since its commencement of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedu...The construction of the TGP has proceeded smoothly since its commencement of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled within the total budget of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of the TGP, has consistently paid attention to the project quality in the first place and carried out large amount of investigation, design and scientific research work. This paper makes an overall summarization and presentation on important technical issues in the design, such as dam, powerhouse structure, permanent ship locks, ship lift, project safety monitoring, main river closure and the 2nd stage cofferdam, mechanical and electric design etc., and put forwards a lot of suggestions about optimizing design schemes and measures for smoothing away construction difficulties in accordance with construction progress.展开更多
基金Supported by Doctorial Fund of Ministry of Education (2002-173) and (2003-172)
文摘A formula for the calculation of critical shear stress of non-uniform sediment was developed by on river bed has been established while considering the relative degree expose of grains.The values of the Coeffi- cients in the formula have been obtained.The formula has been verified with prototype observation data, flumes data of both nature and lightweight sand.The computed results fully reflect the characteristics of thresh- old motion of non-uniform sediment.The result have been used in some physical mo...
文摘Water projects’ sediment deposition problems always cause widespread concerns. The gravity of them varies in accordance not only with reservoirs’ natural and socio-economic characteristics but also with their modes of operation. The unique characteristics, configuration and mode of operation of Three Gorges Project (TGP) reservoir are compared with those of several existing large reservoirs in this paper. As many reservoirs are troubling environment by gradually extending coarse sediment deposition at the uppermost end of fluctuating backwater region toward upstream, Gezhouba reservoir on Yangtze and Danjiangkou reservoir on Hanjiang have shown no trace of such upstream extension of sediment deposition in relevant prototype observation data for the past 20 and more years. TGP reservoir’s in-coming flow sediment conditions and configuration in plane are almost the same as those of Gezhouba reservoir, and TGP reservoir’s mode of operation(usually keeping a very low pool level for flood control in flood season and storing up in-coming flow only thenceafter) is similar to that of Danjiangkou reservoir. New findings of sediment research and prototype flow sediment investigations as well as new agenda of large hydro projects’ construction on Jinshajiang in nearest future assure the prospects of TGP sediment handling.
基金Funded by National Key Technologies R&D Program (2008BAB29B09)Open Foundation of State Key Laboratory of Water Resources and Hydropower Engineering Science (2007C017)China Postdoctoral Science Foundation (20080440956)
文摘Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice.
文摘With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.
文摘The new county-seat town of Badong in the reservoir area of the Three Gorges Project is located on a huge arcuate slope with a convex bank toward north. The slope is cut by a fault, Badong fault, trending in east-west in its back part. It is concerned if the huge arcuate slope is related to mass rock creep, and what is the role of the Badong fault in the formation of the huge arc slope? The Badong fault was put into main consideration in this paper. The data from field investigation were reviewed. Three main features of the Badong fault were summarized: a bedding fault between the Jialingjiang formation (T\-1j) and Badong formation (T\-2b), breccias with compound component, and multiple stages of activity. It was proposed that most of the breccias were formed by fracture-filling. To understand the state of stress and behavior of deformation of the fault during the incision of the Yangtze River as well as the initiation and development of the slope, numerical simulation was conducted. Results indicate that there is a tensional stress zone in the upper part of the fault, and that activity of the fault is dominated by bedding sliding. Opening was also noted in the upper part of the fault in the late periods. The results are consistent with the field observation of the fault. The displacement in the slope is small, which makes us conclude that there is no certain relation between the formation of the arcuate slope and the Badong fault.
文摘The construction of the TGP has proceeded smoothly since its commencement of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled within the total budget of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of the TGP, has consistently paid attention to the project quality in the first place and carried out large amount of investigation, design and scientific research work. This paper makes an overall summarization and presentation on important technical issues in the design, such as dam, powerhouse structure, permanent ship locks, ship lift, project safety monitoring, main river closure and the 2nd stage cofferdam, mechanical and electric design etc., and put forwards a lot of suggestions about optimizing design schemes and measures for smoothing away construction difficulties in accordance with construction progress.