Aimed at the uncertain characteristics of discrete logistics network design,an interval hierarchical triangular uncertain OD demand model based on interval demand and network flow is presented.Under consideration of t...Aimed at the uncertain characteristics of discrete logistics network design,an interval hierarchical triangular uncertain OD demand model based on interval demand and network flow is presented.Under consideration of the system profit,the uncertain demand of logistics network is measured by interval variables and interval parameters,and an interval planning model of discrete logistics network is established.The risk coefficient and maximum constrained deviation are defined to realize the certain transformation of the model.By integrating interval algorithm and genetic algorithm,an interval hierarchical optimal genetic algorithm is proposed to solve the model.It is shown by a tested example that in the same scenario condition an interval solution[3275.3,3 603.7]can be obtained by the model and algorithm which is obviously better than the single precise optimal solution by stochastic or fuzzy algorithm,so it can be reflected that the model and algorithm have more stronger operability and the solution result has superiority to scenario decision.展开更多
Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization r...Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.展开更多
为了有效地扩大基站无线覆盖范围,吸收更多的用户和话务量,降低建设成本,提高收益,实现科学的基站选址,提出了一种适应于分时长期演进(time division long term evolution,TD-LTE)网络的高效的、智能的4G无线网络规划方法,通过综合考虑4...为了有效地扩大基站无线覆盖范围,吸收更多的用户和话务量,降低建设成本,提高收益,实现科学的基站选址,提出了一种适应于分时长期演进(time division long term evolution,TD-LTE)网络的高效的、智能的4G无线网络规划方法,通过综合考虑4G网络的同频干扰、正交频分复用(OFDM)、小区边缘速率、参考信号强度(RSRP)和基站站址密度等,建立一个以建设成本、覆盖率和容量为目标的多目标组合优化规划模型;并采用加入局部搜索的遗传算法进行智能求解。仿真结果表明该模型不但能够求出以最少的成本建设最大覆盖的网络方案,而且能够求出每个建设基站的天线类型、天线挂高和小区类型;同时加入局部搜索后的算法速度得到明显的提高。展开更多
基金Project(51178061)supported by the National Natural Science Foundation of ChinaProject(2010FJ6016)supported by Hunan Provincial Science and Technology,China+1 种基金Project(12C0015)supported by Scientific Research Fund of Hunan Provincial Education Department,ChinaProject(13JJ3072)supported by Hunan Provincial Natural Science Foundation of China
文摘Aimed at the uncertain characteristics of discrete logistics network design,an interval hierarchical triangular uncertain OD demand model based on interval demand and network flow is presented.Under consideration of the system profit,the uncertain demand of logistics network is measured by interval variables and interval parameters,and an interval planning model of discrete logistics network is established.The risk coefficient and maximum constrained deviation are defined to realize the certain transformation of the model.By integrating interval algorithm and genetic algorithm,an interval hierarchical optimal genetic algorithm is proposed to solve the model.It is shown by a tested example that in the same scenario condition an interval solution[3275.3,3 603.7]can be obtained by the model and algorithm which is obviously better than the single precise optimal solution by stochastic or fuzzy algorithm,so it can be reflected that the model and algorithm have more stronger operability and the solution result has superiority to scenario decision.
文摘Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.
文摘为了有效地扩大基站无线覆盖范围,吸收更多的用户和话务量,降低建设成本,提高收益,实现科学的基站选址,提出了一种适应于分时长期演进(time division long term evolution,TD-LTE)网络的高效的、智能的4G无线网络规划方法,通过综合考虑4G网络的同频干扰、正交频分复用(OFDM)、小区边缘速率、参考信号强度(RSRP)和基站站址密度等,建立一个以建设成本、覆盖率和容量为目标的多目标组合优化规划模型;并采用加入局部搜索的遗传算法进行智能求解。仿真结果表明该模型不但能够求出以最少的成本建设最大覆盖的网络方案,而且能够求出每个建设基站的天线类型、天线挂高和小区类型;同时加入局部搜索后的算法速度得到明显的提高。