The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(...In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.展开更多
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
基金Project(50977003) supported by the National Natural Science Foundation of China
文摘In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.