新城金矿中段顶柱盘区回采顺序优化 被引量:7
1
作者 关凯 朱万成 +2 位作者 张洪训 王青元 魏晨慧 《金属矿山》 CAS 北大核心 2013年第9期44-49,共6页
针对新城金矿-580 m中段顶柱的安全高效回采问题,提出4种盘区回采顺序,对不同的回采顺序方案进行优化研究。首先,利用3GSM非接触数字扫描系统对-580 m中段采场顶板和两帮进行结构面调查,并依据Hoek-Brown强度准则得到岩体的物理力学参数... 针对新城金矿-580 m中段顶柱的安全高效回采问题,提出4种盘区回采顺序,对不同的回采顺序方案进行优化研究。首先,利用3GSM非接触数字扫描系统对-580 m中段采场顶板和两帮进行结构面调查,并依据Hoek-Brown强度准则得到岩体的物理力学参数;其次,构建含有巷道、假顶等在内的三维可视化模型并对回采过程进行数值模拟。最后,通过对比分析不同回采顺序条件下采场等关键部位的应力、位移的动态响应特性,并结合各方案顶板的破坏情况,确定了最优的回采顺序。模拟结果对新城金矿顶柱盘区的安全回采具有一定的参考价值。 展开更多
关键词 顶柱开采 盘区回采顺序 开挖响应 稳定性分析
在线阅读 下载PDF
Trial of small gateroad pillar in top coal caving longwall mining of large mining height 被引量:8
2
作者 Li Huamin Syd Peng +4 位作者 Li Huigui Xu Yongxiang Yuan Ruifu Yue Shuaishuai Li Kun 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期139-147,共9页
Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving heig... Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining,serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore,pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition,it was decided to employ a 6 m wide pillar,rather than the previous 38 m wide pillar.Support system for the gateroads was designed and implemented. During gateroad development,pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed,and retreat mining has not begun,the effectiveness of the proposed methods is unknown at this point. However,monitoring will continue until after mining.The results will be published in a separate paper. 展开更多
关键词 Large mining heightSmall gateroad pillarTop coal caving longwall miningHydraulic fracturingGob-side entry driving
在线阅读 下载PDF