期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
新疆克孜尔水库主坝渗流监测资料分析 被引量:1
1
作者 杨顺刚 《水利水电快报》 2020年第8期32-37,共6页
为研究新疆克孜尔水库除险加固后主坝的渗流情况,运用数理统计方法对主坝渗流监测资料进行了过程线分析、水平渗透坡降分析、相关性分析、位势及测压管水位滞后时间分析。研究结果表明:(1)主坝渗流量较小,心墙防渗效果较好;(2)下游无渗... 为研究新疆克孜尔水库除险加固后主坝的渗流情况,运用数理统计方法对主坝渗流监测资料进行了过程线分析、水平渗透坡降分析、相关性分析、位势及测压管水位滞后时间分析。研究结果表明:(1)主坝渗流量较小,心墙防渗效果较好;(2)下游无渗透明流,无积水,无异常变形,渗流状况基本稳定,大坝运行工况基本正常;(3)0+252监测断面下游位势略微偏高,判断该断面心墙与坝基的帷幕灌浆局部风化或排水花管排水不畅,应引起重视。 展开更多
关键词 大坝渗流 测压管 过程线分析 相关性分析 克孜尔水库 新疆维吾尔自治区
在线阅读 下载PDF
Installation Strength Analysis of Subsea Flowline Jumpers
2
作者 Liping Sun Youwei Kang 《Journal of Marine Science and Application》 CSCD 2015年第3期316-326,共11页
A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, c... A subsea flowline jumper (FJ) is a basic connected component for the wet oil tree, subsea pipeline and riser base, and it plays an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments, such as the crane and winch, will increase. The research of deepwater FJ installation in China is still in the primary stage, thus an installation method for the deepwater FJ is proposed in this paper. Finite element models of a typical M-shaped FJ installation system are built to simulate the installation procedures. Analysis results show that the installation steps designed are feasible and valid for the deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ is conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in the installation process. Besides, the mechanical characteristics of FJ during the installation are investigated under a range of environmental conditions and it is found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment are also obtained through the analysis of the main installation steps. 展开更多
关键词 subsea flowline jumper installation analysis strength analysis subsea pipelines finite element model COLLISION
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部