期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
一种工程实用的数字仿真算法
1
作者 张克南 王兰英 《机床与液压》 北大核心 1993年第6期315-317,共3页
本文介绍了一种简便、实用的数字仿真算法,它适用于二阶常微分方程的数值计算,它对于许多工程问题的数字仿真具有实际意义。该方法还有处理边值定界问题十分方便等特点,易于编程。
关键词 数字仿真 边值定界 计算方法
在线阅读 下载PDF
Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes 被引量:7
2
作者 吴爱祥 黄明清 +3 位作者 韩斌 王贻明 于少峰 缪秀秀 《Journal of Central South University》 SCIE EI CAS 2014年第8期3338-3344,共7页
Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an... Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an orthogonal design with two factors, three levels and nine runs was proposed, followed by three-dimensional numerical simulation using ANSYS and FLAC3~. Results show that surface settlement after excavation is concentrically ringed, and increases with the decrease of pillar width and distances to stope gobs. In the meantime, the ore-control fault at the ore-rock boundary and the fractured argillaceous dolomite with intercalated slate at the hanging wall deteriorate the roof settlement. Additionally, stope stability is challenged due to pillar rheological yield and stress concentration, and both are induced by redistribution of stress and plastic zones after mining. Following an objective function and a constraint function, room and pillar configuration with widths of 14 m and 16 m, respectively, is presented as the optimization for improving the ore recovery rate while maintaining a safe working environment. 展开更多
关键词 orthogonal design numerical simulation surface movement roof settlement stope stability room and pillarconfiguration
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部