期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
浅谈农村水电初级电气化县负荷规划中两种典型日负荷曲线编制方法
1
作者 谭旭恒 《农村电气化》 1996年第3期17-17,共1页
浅谈农村水电初级电气化县负荷规划中两种典型日负荷曲线编制方法谭旭恒湖南省水电厅根据农村水电初级电气化县规划的负荷结构特点,普遍采用的规划方法是“各类用户负荷迭加法(以下简称方法1)”和“历史负荷曲线迭加新增负荷法(以... 浅谈农村水电初级电气化县负荷规划中两种典型日负荷曲线编制方法谭旭恒湖南省水电厅根据农村水电初级电气化县规划的负荷结构特点,普遍采用的规划方法是“各类用户负荷迭加法(以下简称方法1)”和“历史负荷曲线迭加新增负荷法(以下简称方法2)”两种。为了减轻收集... 展开更多
关键词 农村 电气化县 负荷规划 水力发电
在线阅读 下载PDF
Optimal fuzzy switch placement to increase automation level of electric distribution network considering asset management principles 被引量:2
2
作者 POUYA Salyani JAVAD Salehi 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第7期1897-1909,共13页
Since distribution sector is inherent into high amount of failures, distribution companies (DISCOs) are responsible of attaining an acceptable value for the reliability indices and otherwise they will face up to compl... Since distribution sector is inherent into high amount of failures, distribution companies (DISCOs) are responsible of attaining an acceptable value for the reliability indices and otherwise they will face up to complaints. So they are usually obligated by regulators to invest on reliability improvement of network. But this investment on reliability is usually from the DISCO’s viewpoint and is also irrespective of customer satisfaction level. In other words, customers are not at the same level of sensitivity to interruptions but DISCO improves the reliability of network without considering the differences in importance degree of loads and their level of reliability requirement. On the other hand DISCOs attempt to reduce their investment costs as much as possible. This paper introduces a novel approach in the field of joint switch placement that can reduce the switch cost from the perspective of asset management policies. To this end, two switch placement plannings in different types of strategies are performed to compare their results. Firstly as witch placement is performed based on reducing the total energy not supplied (ENS) of the system. Then by revising the strategy, a fuzzy switch placement is performed from the DISCO’s point of view which just considers the total ENS of load points most sensitive to interruptions known as important or critical loads. Furthermore, by meeting the related constraints, the reliability of low sensitive customers is disregarded. This is a load importance based planning which can result in switch cost reduction relative to the amount achieved in previous strategy and implies the management of risks associated with reliability and respective constraint. Fuzzy method and new switching mechanism in fuzzy environment of network are implemented to modeling and controlling the risks associated to ENS of critical loads and also the ENS of system. 展开更多
关键词 fuzzy switch placement asset management distribution company reliability load importance based planning
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部