期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
高级制造技术应用的评价模式与方法探讨 被引量:1
1
作者 谌述勇 《技术经济》 1996年第12期51-53,共3页
关键词 高级制造技术 应用的评价 模式方法 评价模式和方法 经济评价方法 竞争优势 计算机集成制造系统(CIMS) 计算机辅助工艺设计(CAPP) 组织分析 计算机集成制造(CIM)
在线阅读 下载PDF
New method for plugging channeling in oil field by nitrogen foam
2
作者 杨朝蓬 高树生 +3 位作者 岳湘安 吕毓刚 睢宏刚 魏浩光 《Journal of Central South University》 SCIE EI CAS 2014年第2期677-683,共7页
In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model whic... In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model which simulated the real conditions of oil wells existing channeling.Above all,the influence factors including reservoir pressure,permeability,oil saturation and gas-to-liquid ratio were studied through dynamic experiment.Then,in light of the technology characteristics of foam injection in oil field,the comparison between gas-liquid and liquid-gas injection modes was studied.The result shows that the gas-liquid injection mode can ensure the foam injectivity and plugging performance.The plugging validity of nitrogen foam injected into the formation water layer was evaluated in different plugging pressure gradients by the dynamic method which is more reasonable than the static evaluation method in laboratory.The research demonstrates that the plugging validity period of foam decreases with plugging pressure gradient increasing.If the plugging pressure gradient is 0.15 MPa/m,the validity period is 160 h.Finally,a empirical equation and a plate about the plugging validity and the plugging pressure gradient were obtained for forecasting the validity period of foam. 展开更多
关键词 foam system plugging performance CHANNELING injection mode plugging validity
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部