期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
多功能结构的支撑技术 被引量:2
1
作者 侯悦民 季林红 金德闻 《机械科学与技术》 CSCD 北大核心 2004年第6期658-662,共5页
多功能结构是航天产品前沿技术。本文首先介绍多功能结构的概念 ,然后讨论多功能结构的支撑技术 ,包括理想材料的分析、设计方法、理想材料零件的设计和制造方法、微电子元件的构型优化以及多功能结构设计方法。针对多功能结构设计 ,提... 多功能结构是航天产品前沿技术。本文首先介绍多功能结构的概念 ,然后讨论多功能结构的支撑技术 ,包括理想材料的分析、设计方法、理想材料零件的设计和制造方法、微电子元件的构型优化以及多功能结构设计方法。针对多功能结构设计 ,提出功能驱动的设计框架 ,及基于博弈论的设计方程 。 展开更多
关键词 多功能结构 设计的材料 均匀化方法 直接金属熔积 设计方程 博弈论
在线阅读 下载PDF
Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit 被引量:1
2
作者 Rahimi ESMAEIL Moosavi EHSAN +1 位作者 Shirinabadi REZA Gholinejad MEHRAN 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第6期1475-1488,共14页
An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information a... An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL. 展开更多
关键词 mined material destination ultimate pit limit net present value production planning
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部