Calculation grid and turbulence model for numerical simulating pressure fluctuations in a high-speed train tunnel are studied through the comparison analysis of numerical simulation and moving model test.Compared the ...Calculation grid and turbulence model for numerical simulating pressure fluctuations in a high-speed train tunnel are studied through the comparison analysis of numerical simulation and moving model test.Compared the waveforms and peak-peak values of pressure fluctuations between numerical simulation and moving model test,the structured grid and the SST k-ωturbulence model are selected for numerical simulating the process of high-speed train passing through the tunnel.The largest value of pressure wave amplitudes of numerical simulation and moving model test meet each other.And the locations of the largest value of the initial compression and expansion wave amplitude of numerical simulation are in agreement with that of moving model test.The calculated pressure at the measurement point fully conforms to the propagation law of compression and expansion waves in the tunnel.展开更多
To address the issue of resource co-allocation with constraints to budget and deadline in grid environments, a novel co-allocation model based on virtual resource agent was proposed. The model optimized resources depl...To address the issue of resource co-allocation with constraints to budget and deadline in grid environments, a novel co-allocation model based on virtual resource agent was proposed. The model optimized resources deployment and price scheme through a three-side co-allocation mechanism, and applied queuing system to model the work of grid resources for providing quantitative deadline guarantees for grid applications. The validity and solutions of the model were presented theoretically. Extensive simulations were conducted to examine the effectiveness and the performance of the model by comparing with other co-allocation policies in terms of deadline violation rate, resource benefit and resource utilization. Experimental results show that compared with the three typical co-allocation policies, the proposed model can reduce the deadline violation rate to about 3.5% for the grid applications with constraints to budget and deadline. Also, the system benefits can be increased by about 30% compared with the those widely-used co-allocation policies.展开更多
Using structured mesh to discretize the calculation region, the wind velocity and pressure distribution in front of the wind barrier under different embankment heights are investigated based on the Detached Eddy Simul...Using structured mesh to discretize the calculation region, the wind velocity and pressure distribution in front of the wind barrier under different embankment heights are investigated based on the Detached Eddy Simulation(DES) with standard SpalartAllmaras(SA) model. The Reynolds number is 4.0×105 in this calculation. The region is three-dimensional. Since the wind barrier and trains are almost invariable cross-sections, only 25 m along the track is modeled. The height of embankment ranges from 1 m to 5 m and the wind barrier is 3 m high. The results show that the wind speed changes obviously before the wind barrier on the horizontal plane, which is 4.5 m high above the track. The speed of wind reduces gradually while approaching the wind barrier. It reaches the minimum value at a distance about 5 m before the wind barrier, and increases dramatically afterwards. The speed of wind at this location is linear with the speed of far field. The train aerodynamic coefficients decrease sharply with the increment of the embankment height. And they take up the monotonicity. Meanwhile, when the height increases from 3 m to 5 m, they just change slightly. It is concluded that the optimum anemometer location is nearly 5 m in front of the wind barrier.展开更多
The conventional deadline and budget constrained (DBC) scheduling heuristics for economic-based computational grids does not take the inconsistency of grid heterogeneity into account, which can lead to decline of ap...The conventional deadline and budget constrained (DBC) scheduling heuristics for economic-based computational grids does not take the inconsistency of grid heterogeneity into account, which can lead to decline of application completion ratios. Motivated by this fact, a novel DI3C scheduling heuristics was proposed to deal with sequential workflow applications. In order to valuate the inconsistency, the relative cost (RC) metric was introduced, which was used to indicate the task-starving degree for resources. The new algorithm assigns tasks to resources, considering completion time, budget and RC together. The GridSim toolkit and the benchmark suites of the standard performance evaluation corporation (SPEC) were used to simulate the heterogeneous grid environment and applications. The experimental results show that the task and workflow completion ratios of the new heuristics are higher than those of the conventional heuristics.展开更多
Distributed/parallel-processing system like sun grid engine(SGE) that utilizes multiple nodes/cores is proposed for the faster processing of large sized satellite image data. After verification, distributed process en...Distributed/parallel-processing system like sun grid engine(SGE) that utilizes multiple nodes/cores is proposed for the faster processing of large sized satellite image data. After verification, distributed process environment for pre-processing performance can be improved by up to 560.65% from single processing system. Through this, analysis performance in various fields can be improved, and moreover, near-real time service can be achieved in near future.展开更多
High quality mesh plays an important role for finite element methods in science computation and numerical simulation.Whether the mesh quality is good or not,to some extent,it determines the calculation results of the ...High quality mesh plays an important role for finite element methods in science computation and numerical simulation.Whether the mesh quality is good or not,to some extent,it determines the calculation results of the accuracy and efficiency.Different from classic Lloyd iteration algorithm which is convergent slowly,a novel accelerated scheme was presented,which consists of two core parts:mesh points replacement and local edges Delaunay swapping.By using it,almost all the equilateral triangular meshes can be generated based on centroidal Voronoi tessellation(CVT).Numerical tests show that it is significantly effective with time consuming decreasing by 40%.Compared with other two types of regular mesh generation methods,CVT mesh demonstrates that higher geometric average quality increases over 0.99.展开更多
文摘Calculation grid and turbulence model for numerical simulating pressure fluctuations in a high-speed train tunnel are studied through the comparison analysis of numerical simulation and moving model test.Compared the waveforms and peak-peak values of pressure fluctuations between numerical simulation and moving model test,the structured grid and the SST k-ωturbulence model are selected for numerical simulating the process of high-speed train passing through the tunnel.The largest value of pressure wave amplitudes of numerical simulation and moving model test meet each other.And the locations of the largest value of the initial compression and expansion wave amplitude of numerical simulation are in agreement with that of moving model test.The calculated pressure at the measurement point fully conforms to the propagation law of compression and expansion waves in the tunnel.
基金Project(60673165) supported by the National Natural Science Foundation of China
文摘To address the issue of resource co-allocation with constraints to budget and deadline in grid environments, a novel co-allocation model based on virtual resource agent was proposed. The model optimized resources deployment and price scheme through a three-side co-allocation mechanism, and applied queuing system to model the work of grid resources for providing quantitative deadline guarantees for grid applications. The validity and solutions of the model were presented theoretically. Extensive simulations were conducted to examine the effectiveness and the performance of the model by comparing with other co-allocation policies in terms of deadline violation rate, resource benefit and resource utilization. Experimental results show that compared with the three typical co-allocation policies, the proposed model can reduce the deadline violation rate to about 3.5% for the grid applications with constraints to budget and deadline. Also, the system benefits can be increased by about 30% compared with the those widely-used co-allocation policies.
基金Projects(51075401,U1334205)supported by the National Natural Science Foundation of ChinaProject(NCET-10-0833)supported by the New Century Excellent Talents in University,China+2 种基金Project supported by the Scholarship Award for Excellent Innovative Doctoral Student granted by Central South University,ChinaProject(2012T002-E)supported by the Science and Technology Research and Development Program of Ministry of Railway,ChinaProject(14JJ1003)supported by the Natural Science Foundation of Hunan Province,China
文摘Using structured mesh to discretize the calculation region, the wind velocity and pressure distribution in front of the wind barrier under different embankment heights are investigated based on the Detached Eddy Simulation(DES) with standard SpalartAllmaras(SA) model. The Reynolds number is 4.0×105 in this calculation. The region is three-dimensional. Since the wind barrier and trains are almost invariable cross-sections, only 25 m along the track is modeled. The height of embankment ranges from 1 m to 5 m and the wind barrier is 3 m high. The results show that the wind speed changes obviously before the wind barrier on the horizontal plane, which is 4.5 m high above the track. The speed of wind reduces gradually while approaching the wind barrier. It reaches the minimum value at a distance about 5 m before the wind barrier, and increases dramatically afterwards. The speed of wind at this location is linear with the speed of far field. The train aerodynamic coefficients decrease sharply with the increment of the embankment height. And they take up the monotonicity. Meanwhile, when the height increases from 3 m to 5 m, they just change slightly. It is concluded that the optimum anemometer location is nearly 5 m in front of the wind barrier.
基金Project(60873107) supported by the National Natural Science Foundation of China
文摘The conventional deadline and budget constrained (DBC) scheduling heuristics for economic-based computational grids does not take the inconsistency of grid heterogeneity into account, which can lead to decline of application completion ratios. Motivated by this fact, a novel DI3C scheduling heuristics was proposed to deal with sequential workflow applications. In order to valuate the inconsistency, the relative cost (RC) metric was introduced, which was used to indicate the task-starving degree for resources. The new algorithm assigns tasks to resources, considering completion time, budget and RC together. The GridSim toolkit and the benchmark suites of the standard performance evaluation corporation (SPEC) were used to simulate the heterogeneous grid environment and applications. The experimental results show that the task and workflow completion ratios of the new heuristics are higher than those of the conventional heuristics.
基金supported by the Sharing and Diffusion of National R&D Outcome funded by the Korea Institute of Science and Technology Information
文摘Distributed/parallel-processing system like sun grid engine(SGE) that utilizes multiple nodes/cores is proposed for the faster processing of large sized satellite image data. After verification, distributed process environment for pre-processing performance can be improved by up to 560.65% from single processing system. Through this, analysis performance in various fields can be improved, and moreover, near-real time service can be achieved in near future.
基金Project(11002121) supported by the National Natural Science Foundation of ChinaProject(09QDZ09) supported by Doctor Foundation of Xiangtan University, China+2 种基金Project(2009LCSSE11) supported by Hunan Key Laboratory for CSSE, ChinaProject(2011FJ3231) supported by Planned Science and Technology Project of Hunan Province,ChinaProject(12JJ3054) supported by the Provincial Natural Science Foundation of Hunan,China
文摘High quality mesh plays an important role for finite element methods in science computation and numerical simulation.Whether the mesh quality is good or not,to some extent,it determines the calculation results of the accuracy and efficiency.Different from classic Lloyd iteration algorithm which is convergent slowly,a novel accelerated scheme was presented,which consists of two core parts:mesh points replacement and local edges Delaunay swapping.By using it,almost all the equilateral triangular meshes can be generated based on centroidal Voronoi tessellation(CVT).Numerical tests show that it is significantly effective with time consuming decreasing by 40%.Compared with other two types of regular mesh generation methods,CVT mesh demonstrates that higher geometric average quality increases over 0.99.