期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
新型农村社会养老保险基础养老金计发标准评估与厘定 被引量:8
1
作者 尹海燕 海龙 《西北人口》 CSSCI 2015年第3期76-80,共5页
作为新农保制度设计的重要内容,基础养老金计发标准将直接影响到农村老年人的基本生活保障权益。然而,现行基础养老金计发标准设置过低且缺乏调待机制,面临难以保障老年人基本生存需要的风险。基于此,本文在明确基础养老金适度水平... 作为新农保制度设计的重要内容,基础养老金计发标准将直接影响到农村老年人的基本生活保障权益。然而,现行基础养老金计发标准设置过低且缺乏调待机制,面临难以保障老年人基本生存需要的风险。基于此,本文在明确基础养老金适度水平的内涵的基础上,运用ELES模型测算出2012~2021年新农保基础养老金适度水平,为核定基础养老金水平提供依据和参照。 展开更多
关键词 新农保 基础养老金 计发标准
在线阅读 下载PDF
Stability of boundary pillars in transition from open pit to underground mining 被引量:11
2
作者 赵兴东 李连崇 +1 位作者 唐春安 张洪训 《Journal of Central South University》 SCIE EI CAS 2012年第11期3256-3265,共10页
Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi... Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground. 展开更多
关键词 boundary pillar STABILITY underground mining numerical simulation case study
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部