动压条件下煤巷锚杆支护的预应力控制技术
1
作者 李德荣 《煤矿开采》 2005年第5期32-34,64,共4页
介绍了灵新煤矿在原有综采煤巷锚杆支护技术的基础上,从支护理念、支护材料、支护工艺等方面进行试了验研究,应用动压条件下煤巷锚杆预应力控制技术,优化支护技术参数,提高了巷道支护效果和巷道掘进速度,节支降耗,一定程度缓解了矿井采... 介绍了灵新煤矿在原有综采煤巷锚杆支护技术的基础上,从支护理念、支护材料、支护工艺等方面进行试了验研究,应用动压条件下煤巷锚杆预应力控制技术,优化支护技术参数,提高了巷道支护效果和巷道掘进速度,节支降耗,一定程度缓解了矿井采掘接替紧张的局面,解决了制约矿井安全、高效生产的相关问题,使锚杆支护技术在灵新煤矿继续得到发展。 展开更多
关键词 综采煤巷 锚杆支护 预应力控制
在线阅读 下载PDF
Trial of small gateroad pillar in top coal caving longwall mining of large mining height 被引量:8
2
作者 Li Huamin Syd Peng +4 位作者 Li Huigui Xu Yongxiang Yuan Ruifu Yue Shuaishuai Li Kun 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期139-147,共9页
Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving heig... Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining,serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore,pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition,it was decided to employ a 6 m wide pillar,rather than the previous 38 m wide pillar.Support system for the gateroads was designed and implemented. During gateroad development,pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed,and retreat mining has not begun,the effectiveness of the proposed methods is unknown at this point. However,monitoring will continue until after mining.The results will be published in a separate paper. 展开更多
关键词 Large mining heightSmall gateroad pillarTop coal caving longwall miningHydraulic fracturingGob-side entry driving
在线阅读 下载PDF
Top-coal deformation control of gob-side entry with narrow pillars and its application for fully mechanized mining face 被引量:3
3
作者 Qi Fangkun Zhou Yuejin +3 位作者 Li Jiawei Wang Erqian Cao Zhengzheng Li Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期417-422,共6页
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution... A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face. 展开更多
关键词 Fully mechanized top-coal caving Narrow pillar Gob-side entry Top coal Deformation control
在线阅读 下载PDF