期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
关于我国尾矿坝稳定设计标准的探讨 被引量:2
1
作者 沈楼燕 王汉强 《中国矿业》 北大核心 2011年第1期91-93,共3页
针对目前"我国尾矿库事故频发和安全生产形势严峻的主要原因之一是安全设计标准低"的主流学术观点,笔者通过对国内外大量资料的分析研究,发现我国现行尾矿坝稳定设计标准与美国的相比是水平相当的。未经充分论证,不应任意提... 针对目前"我国尾矿库事故频发和安全生产形势严峻的主要原因之一是安全设计标准低"的主流学术观点,笔者通过对国内外大量资料的分析研究,发现我国现行尾矿坝稳定设计标准与美国的相比是水平相当的。未经充分论证,不应任意提高或降低现行规范规定的尾矿坝稳定安全系数的允许值,其总体水平宜基本维持在现行规范的历史经验水平上,仅需对个别不合理情况作适当调整。 展开更多
关键词 尾矿坝 稳定设计标准 稳定安全系数
在线阅读 下载PDF
Stability of boundary pillars in transition from open pit to underground mining 被引量:11
2
作者 赵兴东 李连崇 +1 位作者 唐春安 张洪训 《Journal of Central South University》 SCIE EI CAS 2012年第11期3256-3265,共10页
Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi... Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground. 展开更多
关键词 boundary pillar STABILITY underground mining numerical simulation case study
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部