期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
托卡马克脉冲电源实时控制系统设计 被引量:6
1
作者 李维斌 王雅丽 +3 位作者 任青华 姚列英 宣伟民 王英翘 《强激光与粒子束》 EI CAS CSCD 北大核心 2019年第9期113-118,共6页
为提高托卡马克装置磁场电源的控制性能,实现对等离子体的先进控制,设计了基于LabVIEW RT和FPGA的磁场电源实时控制系统。根据等离子体控制对电源控制系统实时控制的要求,使用反射内存卡实现实时数据传输,应用实时操作系统来保证系统的... 为提高托卡马克装置磁场电源的控制性能,实现对等离子体的先进控制,设计了基于LabVIEW RT和FPGA的磁场电源实时控制系统。根据等离子体控制对电源控制系统实时控制的要求,使用反射内存卡实现实时数据传输,应用实时操作系统来保证系统的确定性应用和系统的可靠性,采用NI 7813R系列数据采集卡实现对晶闸管变流器的控制。实验结果表明,该系统满足等离子体放电对电源控制系统实时性的要求,并具备较高的可靠性和稳定性。 展开更多
关键词 实时控制 确定性应用 脉冲电源 LABVIEW RT LABVIEW FPGA
在线阅读 下载PDF
Application of reliability-centered maintenance for productivity improvement of open pit mining equipment:Case study of Sungun Copper Mine 被引量:5
2
作者 Amin Moniri Morad Mohammad Pourgol-Mohammad Javad Sattarvand 《Journal of Central South University》 SCIE EI CAS 2014年第6期2372-2382,共11页
Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of... Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models. 展开更多
关键词 operating costs maintenance mining dump truck RELIABILITY AVAILABILITY UNCERTAINTY
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部