Damage alarming and safety evaluation using long-term monitoring data is an area of significant research activity for long-span bridges. In order to extend the research in this field, the damage alarming technique for...Damage alarming and safety evaluation using long-term monitoring data is an area of significant research activity for long-span bridges. In order to extend the research in this field, the damage alarming technique for bridge expansion joints based on long-term monitoring data was developed. The effects of environmental factors on the expansion joint displacement were analyzed. Multiple linear regression models were obtained to describe the correlation between displacements and the dominant environmental factors. The damage alarming index was defined based on the multiple regression models. At last, the X-bar control chart was utilized to detect the abnormal change of the displacements. Analysis results reveal that temperature and traffic condition are the dominant environmental factors to influence the displacement. When the confidence level of X-bar control chart is set to be 0.003, the false-positive indications of damage can be avoided. The damage sensitivity analysis shows that the proper X-bar control chart can detect 0.1 cm damage-induced change of the expansion joint displacement. It is reasonably believed that the proposed technique is robust against false-positive indication of damage and suitable to alarm the possible future damage of the expansion joints.展开更多
Considering the delay effect of initial lining and revising the Winkler elastic foundation model,an analytical approach based on Pasternak elastic foundation beam theory for pipe roof reinforcement was put forward. Wi...Considering the delay effect of initial lining and revising the Winkler elastic foundation model,an analytical approach based on Pasternak elastic foundation beam theory for pipe roof reinforcement was put forward. With the example of a certain tunnel excavation,the comparison of the values of longitudinal strain of reinforcing pipe between field monitoring and analytical approach was made. The results indicate that Pasternak model,which considers a more realistic hypothesis in the elastic soil than Winkler model,gives more accurate calculation and agrees better with the result of field monitoring. The difference of calculation results between these two models is about 7%,and Pasternak model is proved to be a better way to study the reinforcement mechanism and improve design practice. The calculation results also reveal that the reinforcing pipes act as levers,which increases longitudinal load transfer to an unexcavated area,and consequently decreases deformation and increases face stability.展开更多
In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler...In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.展开更多
基金Project(2009BAG15B03) supported by the National Science and Technology Ministry of ChinaProjects(51178100, 51078080) supported by the National Natural Science Foundation of China+1 种基金Project(BK2011141) supported by the Natural Science Foundation of Jiangsu Province, ChinaProject(12KB02) supported by the Open Fund of the Key Laboratory for Safety Control of Bridge Engineering(Changsha University of Science and Technology), Ministry of Education, China
文摘Damage alarming and safety evaluation using long-term monitoring data is an area of significant research activity for long-span bridges. In order to extend the research in this field, the damage alarming technique for bridge expansion joints based on long-term monitoring data was developed. The effects of environmental factors on the expansion joint displacement were analyzed. Multiple linear regression models were obtained to describe the correlation between displacements and the dominant environmental factors. The damage alarming index was defined based on the multiple regression models. At last, the X-bar control chart was utilized to detect the abnormal change of the displacements. Analysis results reveal that temperature and traffic condition are the dominant environmental factors to influence the displacement. When the confidence level of X-bar control chart is set to be 0.003, the false-positive indications of damage can be avoided. The damage sensitivity analysis shows that the proper X-bar control chart can detect 0.1 cm damage-induced change of the expansion joint displacement. It is reasonably believed that the proposed technique is robust against false-positive indication of damage and suitable to alarm the possible future damage of the expansion joints.
基金Project(IRT0518) supported by the Program of Innovative Research Team of Ministry of Education of China
文摘Considering the delay effect of initial lining and revising the Winkler elastic foundation model,an analytical approach based on Pasternak elastic foundation beam theory for pipe roof reinforcement was put forward. With the example of a certain tunnel excavation,the comparison of the values of longitudinal strain of reinforcing pipe between field monitoring and analytical approach was made. The results indicate that Pasternak model,which considers a more realistic hypothesis in the elastic soil than Winkler model,gives more accurate calculation and agrees better with the result of field monitoring. The difference of calculation results between these two models is about 7%,and Pasternak model is proved to be a better way to study the reinforcement mechanism and improve design practice. The calculation results also reveal that the reinforcing pipes act as levers,which increases longitudinal load transfer to an unexcavated area,and consequently decreases deformation and increases face stability.
基金Project(2002CB412707) supported by the National Basic Research Program of ChinaProject(2006BAG04B05) supported by the National Science and Technology Pillar Program during the 11th Five-Year Plan of ChinaProject(2010B14414) supported by the Scientific Research Program of Center University in China
文摘In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.