水电开发与水电企业和谐发展研究 被引量:4
1
作者 段斌 陈刚 马光文 《人民长江》 北大核心 2014年第24期6-9,13,共5页
我国水电资源丰富,但利用程度较低,大力开发水电资源对于促进我国能源结构调整和经济社会发展具有重要意义。新中国成立以来,我国水电开发规模不断扩大,水电工程建设技术逐步趋于国际领先地位,水电开发管理也不断完善。指出了水电企业... 我国水电资源丰富,但利用程度较低,大力开发水电资源对于促进我国能源结构调整和经济社会发展具有重要意义。新中国成立以来,我国水电开发规模不断扩大,水电工程建设技术逐步趋于国际领先地位,水电开发管理也不断完善。指出了水电企业在水电资源开发过程中面临的主要问题,如政策法规不健全、管理体制待完善以及税费电价制度不合理等。针对上述问题,提出了解决的建议和措施,包括加强法规体系建设,建立统一管理机制和制定合理税收电价政策。 展开更多
关键词 水电开发 水电企业 和谐发展 水电资源 水电工程技术
在线阅读 下载PDF
Optimization of key technologies of penstock shaft construction for a pumped storage power station
2
作者 ZHENG Jingxing CHEN Jianhua +4 位作者 HUANG Wenfeng YIN Jingke ZHANG Peng ZHANG Rui XIONG Fuyou 《水利水电技术(中英文)》 北大核心 2024年第S2期329-339,共11页
Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling... Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China. 展开更多
关键词 hydroelectric engineering construction period record engineering technology optimization shaft construction curvature radius
在线阅读 下载PDF