Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling...Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China.展开更多
Double-layered pellet (DLP) roasting is a novel pretreatment method for sulfur and arsenic-bearing gold concentrates. In this process, preparation of DLPs is a fundamental step which is required to produce DLPs with...Double-layered pellet (DLP) roasting is a novel pretreatment method for sulfur and arsenic-bearing gold concentrates. In this process, preparation of DLPs is a fundamental step which is required to produce DLPs with favorable mechanical strength and thermal stability. Studies were carried out to investigate the affecting factors and conditions on the preparation and properties of DLPs. The results show that moisture content has significant influence on DLPs preparation. With the increase of moisture content in the range of no more than 9.8%, drop resistance and compressive strength of green DLPs are raised and the pelletizing dynamics is improved accordingly. The optimum conditions are determined as moisture content of 9.8%, coating time of 14-16 min, drying temperature 〈80 ℃and drying gas velocity 〈1.2 m/s. When DLPs prepared under these conditions are roasted at 600 ℃ for 1 h, favorable removal and solidifying rates can be obtained, in which the removal rates of arsenic and sulfur are 94.38% and 82.55%, and the solidifying rates of arsenic and sulfur reach 99.62% and 99.79%, respectively. These results promise industrial application of DLP roasting.展开更多
文摘Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China.
基金Project(51074182)supported by the National Natural Science Foundation of ChinaProject(201012200032)supported by the Fundamental Research Funds for the Central Universities,China
文摘Double-layered pellet (DLP) roasting is a novel pretreatment method for sulfur and arsenic-bearing gold concentrates. In this process, preparation of DLPs is a fundamental step which is required to produce DLPs with favorable mechanical strength and thermal stability. Studies were carried out to investigate the affecting factors and conditions on the preparation and properties of DLPs. The results show that moisture content has significant influence on DLPs preparation. With the increase of moisture content in the range of no more than 9.8%, drop resistance and compressive strength of green DLPs are raised and the pelletizing dynamics is improved accordingly. The optimum conditions are determined as moisture content of 9.8%, coating time of 14-16 min, drying temperature 〈80 ℃and drying gas velocity 〈1.2 m/s. When DLPs prepared under these conditions are roasted at 600 ℃ for 1 h, favorable removal and solidifying rates can be obtained, in which the removal rates of arsenic and sulfur are 94.38% and 82.55%, and the solidifying rates of arsenic and sulfur reach 99.62% and 99.79%, respectively. These results promise industrial application of DLP roasting.