期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
夏桥矿井下蓄排水系统放水管数计算方法 被引量:2
1
作者 邵飞燕 孙亚军 凌成鹏 《煤田地质与勘探》 CAS CSCD 北大核心 2008年第1期58-61,共4页
针对夏桥矿(已报废)各水平涌水量较大,拟建立井下蓄排水系统,并利用峰谷时电价差价对矿井排水时段进行优化,以节约排水费用,提出了井下水闸墙上预留放水管数的计算方法,即:探放水管数计算法和水力学计算法2种方法,并对2种方法进行了比... 针对夏桥矿(已报废)各水平涌水量较大,拟建立井下蓄排水系统,并利用峰谷时电价差价对矿井排水时段进行优化,以节约排水费用,提出了井下水闸墙上预留放水管数的计算方法,即:探放水管数计算法和水力学计算法2种方法,并对2种方法进行了比较分析。水力学计算法比较符合放水实际,但没有考虑安全余量;探放水管计算法只是粗略概算,但安全系数比较高。实际应用中,宜采用两种方法互相验证,并考虑经济因素综合选定。 展开更多
关键词 夏桥矿 井下蓄排水系统 探放水管计算 水力学计算法
在线阅读 下载PDF
CFD prediction of local scour hole around bridge piers 被引量:5
2
作者 ZHU Zhi-wen LIU Zhen-qing 《Journal of Central South University》 SCIE EI CAS 2012年第1期273-281,共9页
In order to predict the local scour hole and its evaluation around a cylindrical bridge pier, the computational fluid dynamics (CFD) and theories of sediment movement and transport were employed to carry out numeric... In order to predict the local scour hole and its evaluation around a cylindrical bridge pier, the computational fluid dynamics (CFD) and theories of sediment movement and transport were employed to carry out numerical simulations. In the numerical method, the time-averaged Reynolds Navier-Stokes equations and the standard k-e model were first used to simulate the three-dimensional flow field around a bridge pier fixed on river bed. The transient shear stress on river bed was treated as a crucial hydrodynamic mechanism when handling sediment incipience and transport. Then, river-bed volumetric sediment transport was calculated, followed by the modification of the river bed altitude and configuration. Boundary adaptive mesh technique was employed to modify the grid system with changed river-bed boundary. The evolution of local scour around a cylindrical bridge pier was presented. The numerical results represent the flow pattern and mechanism during the pier scouring, with a good prediction of the maximum scour hole depth compared with test results. 展开更多
关键词 local scour bridge pier computational fluid dynamics sediment transport
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部