期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于价值流理论的上游径流经济价值研究 被引量:1
1
作者 董雅洁 梅亚东 《水利经济》 2007年第6期5-6,12,共3页
针对水资源的日益紧缺问题,探讨通过水的价值评估实现对水资源的有效利用和分配。着眼于整个水循环系统的总体,综合采用了多种计算方法,对上游径流通过蓄水的动态变化量在下游所产生的间接价值进行了评估,分析了水资源下游到上游的再配... 针对水资源的日益紧缺问题,探讨通过水的价值评估实现对水资源的有效利用和分配。着眼于整个水循环系统的总体,综合采用了多种计算方法,对上游径流通过蓄水的动态变化量在下游所产生的间接价值进行了评估,分析了水资源下游到上游的再配置问题。分析结果表明,动态库容对在上游取水的机会成本有很大影响,并且蓄水一般都能提高水系统的总价值。 展开更多
关键词 水估价 价值流 资源配置 机会成本 动态变化量
在线阅读 下载PDF
Integrated evaluation system under randomness and fuzziness for groundwater contamination risk assessment in a little town, Central China 被引量:2
2
作者 祝慧娜 袁兴中 +4 位作者 梁婕 刘永德 尹娟 江洪炜 黄华军 《Journal of Central South University》 SCIE EI CAS 2014年第3期1044-1050,共7页
An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of t... An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of the parameters and the fuzziness of the risk were considered simultaneously, and the exceeding standard probability of contamination and human health risk due to the contamination were integrated. The contamination risk was defined as a combination of "vulnerability" and "hazard". To calculate the value of "vulnerability", pollutant concentration was simulated by MODFLOW with random input variables and a new modified health risk assessment(MRA) model was established to analyze the level of "hazard". The limit concentration based on environmental-guideline and health risk due to manganese were systematically examined to obtain the general risk levels through a fuzzy rule base. The "vulnerability" and "hazard" were divided into five categories of "high", "medium-high", "medium", "low-medium" and "low", respectively. Then, "vulnerability" and "hazard" were firstly combined by integrated evaluation. Compared with the other two scenarios under deterministic methods, the risk obtained in the proposed system is higher. This research illustrated that ignoring of uncertainties in evaluation process might underestimate the risk level. 展开更多
关键词 integrated evaluation RANDOMNESS FUZZINESS modified health risk assessment uncertainty MANGANESE
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部