The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk...The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk assessment of power transformer which is very significant to improve the reliability of the power system,a fuzzy comprehensive risk assessment model of power transformer based on Borda number theory is proposed in this paper.At first,the fault types and risk factors of the power transformer are analyzed.Secondly,the basic framework of the fuzzy comprehensive evaluation is applied to quantify the risk factors.And then,Borda number theory is employed to analyze influence degree and occurrence probability of power transformer.At last,the various risk factors impact index and fuzzy comprehensive evaluation index of power transformer can be easily obtained.Applying this model,the relative importance degree of the risk factors can be horizontally compared according to the numerical index,the engineering staff can directly get the parameters of the transformer risk level and get a good description of the visual expression through using 5 score and similar visual language.展开更多
In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(...In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.展开更多
An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of t...An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of the parameters and the fuzziness of the risk were considered simultaneously, and the exceeding standard probability of contamination and human health risk due to the contamination were integrated. The contamination risk was defined as a combination of "vulnerability" and "hazard". To calculate the value of "vulnerability", pollutant concentration was simulated by MODFLOW with random input variables and a new modified health risk assessment(MRA) model was established to analyze the level of "hazard". The limit concentration based on environmental-guideline and health risk due to manganese were systematically examined to obtain the general risk levels through a fuzzy rule base. The "vulnerability" and "hazard" were divided into five categories of "high", "medium-high", "medium", "low-medium" and "low", respectively. Then, "vulnerability" and "hazard" were firstly combined by integrated evaluation. Compared with the other two scenarios under deterministic methods, the risk obtained in the proposed system is higher. This research illustrated that ignoring of uncertainties in evaluation process might underestimate the risk level.展开更多
基金Project Supported by National Natural Science Foundation of China (50425722), Natural Science Foundation of CQ CSTC (Chongqing Science and Technology Commission) (2008BA3026).
文摘The power transformer is the key equipment of transforming voltage and exchanging power in the power system.It's safe and reliable operation directly influences the safe level of the power system.To study the risk assessment of power transformer which is very significant to improve the reliability of the power system,a fuzzy comprehensive risk assessment model of power transformer based on Borda number theory is proposed in this paper.At first,the fault types and risk factors of the power transformer are analyzed.Secondly,the basic framework of the fuzzy comprehensive evaluation is applied to quantify the risk factors.And then,Borda number theory is employed to analyze influence degree and occurrence probability of power transformer.At last,the various risk factors impact index and fuzzy comprehensive evaluation index of power transformer can be easily obtained.Applying this model,the relative importance degree of the risk factors can be horizontally compared according to the numerical index,the engineering staff can directly get the parameters of the transformer risk level and get a good description of the visual expression through using 5 score and similar visual language.
基金Project(50977003) supported by the National Natural Science Foundation of China
文摘In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.
基金Projects(51039001,51009063) supported by the National Natural Science Foundation of ChinaProject(SX2010-026) supported by State Council Three Gorges Project Construction Committee Executive Office,China+1 种基金Project(2012BS046) supported by Henan University of Technology,ChinaProject(BYHGLC-2010-02) supported by the Guangzhou Water Authority,China
文摘An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of the parameters and the fuzziness of the risk were considered simultaneously, and the exceeding standard probability of contamination and human health risk due to the contamination were integrated. The contamination risk was defined as a combination of "vulnerability" and "hazard". To calculate the value of "vulnerability", pollutant concentration was simulated by MODFLOW with random input variables and a new modified health risk assessment(MRA) model was established to analyze the level of "hazard". The limit concentration based on environmental-guideline and health risk due to manganese were systematically examined to obtain the general risk levels through a fuzzy rule base. The "vulnerability" and "hazard" were divided into five categories of "high", "medium-high", "medium", "low-medium" and "low", respectively. Then, "vulnerability" and "hazard" were firstly combined by integrated evaluation. Compared with the other two scenarios under deterministic methods, the risk obtained in the proposed system is higher. This research illustrated that ignoring of uncertainties in evaluation process might underestimate the risk level.