期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于顾客满意度及模糊计算推理的产品创新体系 被引量:5
1
作者 黄风立 赵燕伟 林建平 《工程设计学报》 CSCD 北大核心 2007年第3期181-186,共6页
在当前买方市场的经济条件下,产品设计必须满足顾客需求,产品的创新必须使顾客满意,因此,对基于顾客满意度的产品创新体系进行探讨是产品设计中的首要任务.在顾客满意度调查的基础上,提出最小顾客满意度法、基于模糊模拟的遗传算法以及... 在当前买方市场的经济条件下,产品设计必须满足顾客需求,产品的创新必须使顾客满意,因此,对基于顾客满意度的产品创新体系进行探讨是产品设计中的首要任务.在顾客满意度调查的基础上,提出最小顾客满意度法、基于模糊模拟的遗传算法以及利用B ayes估计顾客满意度指数的聚类方法这3种方法,从不同侧面挖掘产品创新点,再利用模糊计算推理对提出的3种产品创新点挖掘方法进行综合.在挖掘出产品创新点后,需要根据专业知识对产品进行进一步的改进设计,并给出一个产品创新点挖掘方法的计算实例.建立了基于顾客满意的产品创新体系,使产品的创新设计能面向顾客的需求. 展开更多
关键词 顾客满意度 产品创新 相关机会约束 模糊计算推理
在线阅读 下载PDF
Calculation of maximum surface settlement induced by EPB shield tunnelling and introducing most effective parameter 被引量:6
2
作者 Sayed Rahim Moeinossadat Kaveh Ahangari Kourosh Shahriar 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第12期3273-3283,共11页
This study aims to predict ground surface settlement due to shallow tunneling and introduce the most affecting parameters on this phenomenon.Based on data collected from Shanghai LRT Line 2 project undertaken by TBM-E... This study aims to predict ground surface settlement due to shallow tunneling and introduce the most affecting parameters on this phenomenon.Based on data collected from Shanghai LRT Line 2 project undertaken by TBM-EPB method,this research has considered the tunnel's geometric,strength,and operational factors as the dependent variables.At first,multiple regression(MR) method was used to propose equations based on various parameters.The results indicated the dependency of surface settlement on many parameters so that the interactions among different parameters make it impossible to use MR method as it leads to equations of poor accuracy.As such,adaptive neuro-fuzzy inference system(ANFIS),was used to evaluate its capabilities in terms of predicting surface settlement.Among generated ANFIS models,the model with all input parameters considered produced the best prediction,so as its associated R^2 in the test phase was obtained to be 0.957.The equations and models in which operational factors were taken into consideration gave better prediction results indicating larger relative effect of such factors.For sensitivity analysis of ANFIS model,cosine amplitude method(CAM) was employed; among other dependent variables,fill factor of grouting(n) and grouting pressure(P) were identified as the most affecting parameters. 展开更多
关键词 surface settlement shallow tunnel tunnel boring machine (TBM) multiple regression (MR) adaptive neuro-fuzzyinference system (ANFIS) cosine amplitude method (CAM)
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部