This paper presents an integrated investigation of the ground stability of a deep gateroad with a 1 km burial depth based on a field test, case studies, and numerical modelling. In situ stress measurements and mechani...This paper presents an integrated investigation of the ground stability of a deep gateroad with a 1 km burial depth based on a field test, case studies, and numerical modelling. In situ stress measurements and mechanical properties tests were first conducted in the test site. Then, the deformation behavior, stress and yield zone distributions, as well as the bolts load of the gateroad, were simulated using FLAC3D software. The model results demonstrated that the soft rock properties and high in situ stress were the main factors for the deep gateroad instability, and the shear slip failure induced by the high stress was the primary failure model for the deep rock mass. In addition, the unsuitable support patterns, especially the relatively short bolts/cables with low pre-tensions, the lack of high-strengthen secondary supports and the unsupported floor strata, also contributed to the gateroad instability. Subsequently, a new combined supporting strategy, incorporating longer bolts/cables, yielding ring supports, and grouting measures, was proposed for the deep gateroad, and its validity was verified via field monitoring. All these could be a reference for understanding the failure mechanism of the gateroad with 1 km burial depth.展开更多
Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and t...Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and the parameters of temperature and flow rate in different parts of system were measured during this period. The seasonal energy efficiency ratio was calculated and the performance of heat pump system in summer was compared with that in winter. The result shows that the coefficient of performance of the system reaches 3.63 in summer and 3.49 in winter, respectively. The heat balance in underground rock mass is acquired basically throughout the year, and the heat accumulation in the earth tends to be zero.展开更多
Assisted by framework of multimedia total exposure model for hazard waste sites(CalTOX),potential influences of scenario-uncertainty on multimedia health risk assessment(MHRA) and decision-making were quantitatively a...Assisted by framework of multimedia total exposure model for hazard waste sites(CalTOX),potential influences of scenario-uncertainty on multimedia health risk assessment(MHRA) and decision-making were quantitatively analyzed in a primary extent under the Chinese scenario case by deliberately varying the two key scenario-elements,namely conceptual exposure pathways combination and aim receptor cohorts choice.Results show that the independent change of one exposure pathway or receptor cohort could lead variation of MHRA results in the range of 3.6×10-6-1.4×10-5 or 6.7×10-6-2.3×10-5.And randomly simultaneous change of those two elements could lead variation of MHRA results at the range of 7.7×10-8-2.3×10-5.On the basis of the corresponding sensitivity analysis,pathways which made a valid contribution to the final modeling risk value occupied only 16.7% of all considered pathways.Afterwards,comparative analysis between influence of parameter-uncertainty and influence of scenario-uncertainty was made.In consideration of interrelationship among all types of uncertainties and financial reasonability during MHRA procedures,the integrated method how to optimize the entire procedures of MHRA was presented innovatively based on sensitivity analysis,scenario-discussion and nest Monte Carlo simulation or fuzzy mathematics.展开更多
The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is...The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is focused on the parameters acquisition and operation analysis of the GSHP system in Tangshan. Results show the average COPs(coefficient of performance) are2.85 and 2.70 in summer and winter, respectively, and heat(cold) unbalance underground existed after whole year operation. The analysis of data also indicates that the direct borehole air-conditioning saved some power consumption obviously in the early stage of summer and energy saving of the GSHP system depended remarkably on its operation and management level. Besides the observation points of ground temperature are laid for a large-scale GSHP system, and the hydraulic balance of the pipes group needs to be concerned specially in safeguarding better reliability.展开更多
The occurrence of liquid condensation in natural gas accounts for new challenges during the interoperability between transmission networks,where condensation would lead to higher pressure drops,lower line capacity and...The occurrence of liquid condensation in natural gas accounts for new challenges during the interoperability between transmission networks,where condensation would lead to higher pressure drops,lower line capacity and may cause safety problem.A successful case of hydrocarbon dew point(HCDP)analysis is demonstrated during the mixing of natural gases in the transmission pipeline.Methods used to predict the HCDP are combined with equations of state(EOS)and characterization of C6+heavy components.Predictions are compared with measured HCDP with different concentrations of mixed gases at a wide range of pressure and temperature scopes.Software named"PipeGasAnalysis"is developed and helps to systematic analyze the condensation problem,which will provide the guidance for the design and operation of the network.展开更多
In view of the uncertainty and complexity,the intelligent model of rehabilitation training program for stroke was proposed,combining with the case-based reasoning(CBR) and interval type-2 fuzzy reasoning(IT2FR).The mo...In view of the uncertainty and complexity,the intelligent model of rehabilitation training program for stroke was proposed,combining with the case-based reasoning(CBR) and interval type-2 fuzzy reasoning(IT2FR).The model consists of two parts:the setting model based on CBR and the feedback compensation model based on IT2FR.The former presets the value of rehabilitation training program,and the latter carries on the feedback compensation of the preset value.Experimental results show that the average percentage error of two rehabilitation training programs is 0.074%.The two programs are made by the intelligent model and rehabilitation physician.That is,the two different programs are nearly identical.It means that the intelligent model can make a rehabilitation training program effectively and improve the rehabilitation efficiency.展开更多
基金Project(2017RCJJ011) supported by the Scientific Research Foundation of Shaaadong University of Science and Technology for Recruited Talents, China Projects(01CK03203, 02CK02302) supported by the Shaaadong Provincial First-Class Discipline Fundamental, China Proj ect(ZR2018QEE001) supported by the Natural Science Foundation of Shandong Province, China
文摘This paper presents an integrated investigation of the ground stability of a deep gateroad with a 1 km burial depth based on a field test, case studies, and numerical modelling. In situ stress measurements and mechanical properties tests were first conducted in the test site. Then, the deformation behavior, stress and yield zone distributions, as well as the bolts load of the gateroad, were simulated using FLAC3D software. The model results demonstrated that the soft rock properties and high in situ stress were the main factors for the deep gateroad instability, and the shear slip failure induced by the high stress was the primary failure model for the deep rock mass. In addition, the unsuitable support patterns, especially the relatively short bolts/cables with low pre-tensions, the lack of high-strengthen secondary supports and the unsupported floor strata, also contributed to the gateroad instability. Subsequently, a new combined supporting strategy, incorporating longer bolts/cables, yielding ring supports, and grouting measures, was proposed for the deep gateroad, and its validity was verified via field monitoring. All these could be a reference for understanding the failure mechanism of the gateroad with 1 km burial depth.
基金Project(50838009) supported by the National Science Key Foundation 1 tem
文摘Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and the parameters of temperature and flow rate in different parts of system were measured during this period. The seasonal energy efficiency ratio was calculated and the performance of heat pump system in summer was compared with that in winter. The result shows that the coefficient of performance of the system reaches 3.63 in summer and 3.49 in winter, respectively. The heat balance in underground rock mass is acquired basically throughout the year, and the heat accumulation in the earth tends to be zero.
基金Projects(50978088,51039001,51178172,51009063) supported by the National Natural Science Foundation of ChinaProject(NCET-08- 180) supported by the Program for New Century Excellent Talents in University from the Ministry of Education of China
文摘Assisted by framework of multimedia total exposure model for hazard waste sites(CalTOX),potential influences of scenario-uncertainty on multimedia health risk assessment(MHRA) and decision-making were quantitatively analyzed in a primary extent under the Chinese scenario case by deliberately varying the two key scenario-elements,namely conceptual exposure pathways combination and aim receptor cohorts choice.Results show that the independent change of one exposure pathway or receptor cohort could lead variation of MHRA results in the range of 3.6×10-6-1.4×10-5 or 6.7×10-6-2.3×10-5.And randomly simultaneous change of those two elements could lead variation of MHRA results at the range of 7.7×10-8-2.3×10-5.On the basis of the corresponding sensitivity analysis,pathways which made a valid contribution to the final modeling risk value occupied only 16.7% of all considered pathways.Afterwards,comparative analysis between influence of parameter-uncertainty and influence of scenario-uncertainty was made.In consideration of interrelationship among all types of uncertainties and financial reasonability during MHRA procedures,the integrated method how to optimize the entire procedures of MHRA was presented innovatively based on sensitivity analysis,scenario-discussion and nest Monte Carlo simulation or fuzzy mathematics.
基金Project(2012BAJ06B04)supported by"12th Five-Year Plan"National science and Technology,ChinaProject(2014-228)supported by Department of Housing and Urban Rural Development of Hebei,China
文摘The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is focused on the parameters acquisition and operation analysis of the GSHP system in Tangshan. Results show the average COPs(coefficient of performance) are2.85 and 2.70 in summer and winter, respectively, and heat(cold) unbalance underground existed after whole year operation. The analysis of data also indicates that the direct borehole air-conditioning saved some power consumption obviously in the early stage of summer and energy saving of the GSHP system depended remarkably on its operation and management level. Besides the observation points of ground temperature are laid for a large-scale GSHP system, and the hydraulic balance of the pipes group needs to be concerned specially in safeguarding better reliability.
基金Project(2011ZX05026-004-03)supported by the Key National Science and Technology Specific Program,ChinaProject(NCET-12-0969)supported by the Program for New Century Excellent Talents in University,China+1 种基金Project(51104167)supported by the National Natural Science Foundation of ChinaProject(BJ-2011-02)supported by the Research Funds of China University of Petroleum-Beijing
文摘The occurrence of liquid condensation in natural gas accounts for new challenges during the interoperability between transmission networks,where condensation would lead to higher pressure drops,lower line capacity and may cause safety problem.A successful case of hydrocarbon dew point(HCDP)analysis is demonstrated during the mixing of natural gases in the transmission pipeline.Methods used to predict the HCDP are combined with equations of state(EOS)and characterization of C6+heavy components.Predictions are compared with measured HCDP with different concentrations of mixed gases at a wide range of pressure and temperature scopes.Software named"PipeGasAnalysis"is developed and helps to systematic analyze the condensation problem,which will provide the guidance for the design and operation of the network.
基金Project(2010020176-301)supported by Liaoning Science and Technology Program,ChinaProject(F10-2D5-1-57)supported by Shenyang Municipal Fund,China
文摘In view of the uncertainty and complexity,the intelligent model of rehabilitation training program for stroke was proposed,combining with the case-based reasoning(CBR) and interval type-2 fuzzy reasoning(IT2FR).The model consists of two parts:the setting model based on CBR and the feedback compensation model based on IT2FR.The former presets the value of rehabilitation training program,and the latter carries on the feedback compensation of the preset value.Experimental results show that the average percentage error of two rehabilitation training programs is 0.074%.The two programs are made by the intelligent model and rehabilitation physician.That is,the two different programs are nearly identical.It means that the intelligent model can make a rehabilitation training program effectively and improve the rehabilitation efficiency.