期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity 被引量:3
1
作者 李果 关旭 +1 位作者 刘梦麒 单汩源 《Journal of Central South University》 SCIE EI CAS 2013年第11期3324-3333,共10页
The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity.First,the basic model of this problem was e... The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity.First,the basic model of this problem was established and based on relevant analysis,the original model could be transformed by minimax method.Then,the optimal order quantity and production quantity influenced by service level constraint were analyzed and the boundary of optimal order quantity and production quantity was given.According to this boundary,the effective method and tactics were put forward to solve the transformed model.In case analysis,the optimal expected total cost of two-echelon inventory can be obtained and it was analyzed how service level constraint and safety factor influence the optimal expected total cost of two-echelon inventory.The results show that the optimal expected total cost of two-echelon inventory is constrained by the higher constraint between service level constraint and safety factor. 展开更多
关键词 service level constraint safety factor controllable lead time sensitivity to order quantity two-echelon
在线阅读 下载PDF
预防维修周期的一种多目标最优化模型 被引量:13
2
作者 张民悦 杨荔贤 《兰州理工大学学报》 CAS 北大核心 2011年第3期138-143,共6页
针对故障小修的周期维修策略,考虑故障小修时间和预防维修时间,以部件的稳态可用度、平均费用率和平均可靠度三个指标构建一个预防维修周期的多目标最优化模型,并运用极小-极大法(min-max)求解该多目标最优化模型,从而确定出部件的预防... 针对故障小修的周期维修策略,考虑故障小修时间和预防维修时间,以部件的稳态可用度、平均费用率和平均可靠度三个指标构建一个预防维修周期的多目标最优化模型,并运用极小-极大法(min-max)求解该多目标最优化模型,从而确定出部件的预防维修周期.结合该模型给出一个算例,并通过该例阐明方法的优越性. 展开更多
关键词 故障小修 预防维修周期 极小-极大法 多目标最优化
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部