期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
DSS中数据开采技术的研究
1
作者 周瑛 《情报杂志》 CSSCI 北大核心 2003年第8期32-33,共2页
决策支持系统 (DSS)是信息研究的最新发展阶段 ,已成为计算机应用领域中的重要研究课题。本文详细阐述了DSS中数据开采的三种主要技术 。
关键词 DSS 决策支持系统 数据开采技术 计算机应用 发展方向 关联规则 多层次数据汇总
在线阅读 下载PDF
气候资料新一代信息存储与服务系统的研究
2
作者 郭发辉 《气象》 CSCD 北大核心 2002年第11期16-21,共6页
着重阐述了气候资料新一代信息存储与服务系统的技术基础 ,主要有数据库技术、数据仓库技术、数据开采技术、环球网技术和智能代理技术等 ,同时也阐述了系统的结构、功能以及实现的策略。
关键词 气候资料 数据 数据仓库 数据开采技术 环境网技术
在线阅读 下载PDF
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconstructive technique (SIRT) 被引量:14
3
作者 N.Hosseini K.Oraee +1 位作者 K.Shahriar K.Goshtasbi 《Journal of Central South University》 SCIE EI CAS 2012年第8期2297-2306,共10页
Mining operation, especially underground coal mining, always has the remarkable risks of ground control. Passive seismic velocity tomography based on simultaneous iterative reconstructive technique (SIRT) inversion ... Mining operation, especially underground coal mining, always has the remarkable risks of ground control. Passive seismic velocity tomography based on simultaneous iterative reconstructive technique (SIRT) inversion is used to deduce the stress redistribution around the longwall mining panel. The mining-induced microseismic events were recorded by mounting an array of receivers on the surface, above the active panel. After processing and filtering the seismic data, the three-dimensional tomography images of the p-wave velocity variations by SIRT passive seismic velocity tomography were provided. To display the velocity changes on coal seam level and subsequently to infer the stress redistribution, these three-dimensional tomograms into the coal seam level were sliced. In addition, the boundary element method (BEM) was used to simulate the stress redistribution. The results show that the inferred stresses from the passive seismic tomograms are conformed to numerical models and theoretical concept of the stress redistribution around the longwall panel. In velocity tomograms, the main zones of the stress redistribution arotmd the panel, including front and side abutment pressures, and gob stress are obvious and also the movement of stress zones along the face advancement is evident. Moreover, the effect of the advance rate of the face on the stress redistribution is demonstrated in tomography images. The research result proves that the SIRT passive seismic velocity tomography has an ultimate potential for monitoring the changes of stress redistribution around the longwall mining panel continuously and subsequently to improve safety of mining operations. 展开更多
关键词 longwall mining passive seismic velocity tomography simultaneous iterative reconstructive technique (SIRT) boundary element method stress redistribution ground control
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部