7107工作面出水水源分析及治理 被引量:1
1
作者 史先志 史先启 《煤矿开采》 2001年第3期73-74,共2页
通过对地层富水性的评价、顶板导水裂隙带高度计算 ,水质对比等确定了 71 0 7工作面出水水源 ,并介绍了该矿通过建立排水基地打钻、放水的经验及通过控制回采速度控制涌水量的方法。
关键词 出水水源 涌出量 排水基地 回采速度 顶板 水质 导水裂隙带
在线阅读 下载PDF
综采工作面在富水区下开采实践
2
作者 朱巍 朱明国 《煤矿开采》 2006年第6期41-42,共2页
介绍了张双楼矿在7113综放工作面成功通过顶板富水区的经验,对工作面开采期间涌水量动态观测,总结了东翼-750m水平以下采区涌水规律,为综放工作面在富水区下回采提供了宝贵的经验。
关键词 富水区 疏水通道 排水基地 涌水规律
在线阅读 下载PDF
Vertical drainage capacity of new electrical drainage board on improvement of super soft clayey ground 被引量:1
3
作者 沈扬 励彦德 +2 位作者 黄文君 徐海东 胡品飞 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第10期4027-4034,共8页
As an advanced polymer composites electro-kinetic geosynthetics, the electro-osmotic vertical drainage(EVD) board could drain water quickly and accelerate consolidation process. However, the drainage rate was mainly i... As an advanced polymer composites electro-kinetic geosynthetics, the electro-osmotic vertical drainage(EVD) board could drain water quickly and accelerate consolidation process. However, the drainage rate was mainly impacted by the vertical drainage capability. Therefore, vertical drainage capability at the top of EVD board was theoretically analyzed. Basic requirements for drainage at the top of the board were summed up, as well as the formula of anode pore pressure when losing the vertical drainage capability. Meanwhile, a contrast test on the top and bottom drainage capacities was conducted. In use of the advanced EVD board, the voltage potential and pore pressure of anode were measured. Moreover, the derived formulas were verified. The result shows that the decrease of electric force gradient had an observable impact on the drainage capability. There was nearly no difference between the energy consumption for the two drainage methods. Although a little less water was discharged, the top drainage method had more advantages, such as high initial drainage velocity, few soil cracks, low anode water content and high soil strength. All of these show that the super soft soil ground could be consolidated quickly in use of the advanced EVD board through the top drainage. The top drainage method could efficiently improve the drainage effect, decrease the energy consumption and speed up the project proceeding. 展开更多
关键词 electro-osmotic vertical drainage(EVD) board vertical drainage capacity potential gradient pore pressure around anode